Data records
Each statement in Electrical Testing Reference is recorded as a data record with its source, verification date, review status and history. The index lists 1182 records by subject.
Test methods
Arc Energy Reduction Performance
- tests.arc-energy-reduction-performance.equipment.relay.acceptance: Arc Energy Reduction Performance is specified for microprocessor-based protective relays in acceptance testing at clause 7.9.2.B.6 of ANSI/NETA ATS-2025.Value: microprocessor-based protective relays.
- tests.arc-energy-reduction-performance.governed-by.ansi-neta-ats: Arc Energy Reduction Performance is addressed in ANSI/NETA ATS-2025.
- tests.arc-energy-reduction-performance.title: The test method is named Arc Energy Reduction Performance.Value: Arc Energy Reduction Performance.
Battery Capacity Load Test
- tests.battery-capacity-load-test.equipment.battery.acceptance: Battery Capacity Load Test is specified for flooded lead-acid batteries in acceptance testing at clause 7.18.1.1.B.6 of ANSI/NETA ATS-2025.Value: flooded lead-acid batteries.
- tests.battery-capacity-load-test.equipment.battery.maintenance: Battery Capacity Load Test is specified for flooded lead-acid batteries in maintenance testing at clause 7.18.1.1.B.6 of ANSI/NETA MTS-2023.Value: flooded lead-acid batteries.
- tests.battery-capacity-load-test.governed-by.ansi-neta-ats: Battery Capacity Load Test is addressed in ANSI/NETA ATS-2025.
- tests.battery-capacity-load-test.governed-by.ansi-neta-mts: Battery Capacity Load Test is addressed in ANSI/NETA MTS-2023.
- tests.battery-capacity-load-test.governed-by.ieee-450: Battery Capacity Load Test is addressed in IEEE 450-2020.
- tests.battery-capacity-load-test.title: The test method is named Battery Capacity Load Test.Value: Battery Capacity Load Test.
Battery Cell Voltage and Specific Gravity
- tests.battery-cell-voltage-and-specific-gravity.equipment.battery.acceptance: Battery Cell Voltage and Specific Gravity is specified for flooded lead-acid batteries in acceptance testing at clause 7.18.1.1.A.7 of ANSI/NETA ATS-2025.Value: flooded lead-acid batteries.
- tests.battery-cell-voltage-and-specific-gravity.equipment.battery.maintenance: Battery Cell Voltage and Specific Gravity is specified for flooded lead-acid batteries in maintenance testing at clause 7.18.1.1.A.6 of ANSI/NETA MTS-2023.Value: flooded lead-acid batteries.
- tests.battery-cell-voltage-and-specific-gravity.governed-by.ansi-neta-ats: Battery Cell Voltage and Specific Gravity is addressed in ANSI/NETA ATS-2025.
- tests.battery-cell-voltage-and-specific-gravity.governed-by.ansi-neta-mts: Battery Cell Voltage and Specific Gravity is addressed in ANSI/NETA MTS-2023.
- tests.battery-cell-voltage-and-specific-gravity.title: The test method is named Battery Cell Voltage and Specific Gravity.Value: Battery Cell Voltage and Specific Gravity.
Battery Charger Performance
- tests.battery-charger-performance.equipment.battery.acceptance: Battery Charger Performance is specified for flooded lead-acid batteries in acceptance testing at clause 7.18.1.1.B.1 of ANSI/NETA ATS-2025.Value: flooded lead-acid batteries.
- tests.battery-charger-performance.equipment.battery.maintenance: Battery Charger Performance is specified for flooded lead-acid batteries in maintenance testing at clause 7.18.1.1.B.2 of ANSI/NETA MTS-2023.Value: flooded lead-acid batteries.
- tests.battery-charger-performance.governed-by.ansi-neta-ats: Battery Charger Performance is addressed in ANSI/NETA ATS-2025.
- tests.battery-charger-performance.governed-by.ansi-neta-mts: Battery Charger Performance is addressed in ANSI/NETA MTS-2023.
- tests.battery-charger-performance.governed-by.ieee-946: Battery Charger Performance is addressed in IEEE 946-2020.
- tests.battery-charger-performance.title: The test method is named Battery Charger Performance.Value: Battery Charger Performance.
Battery Intercell Connection Resistance
- tests.battery-intercell-connection-resistance.equipment.battery.acceptance: Battery Intercell Connection Resistance is specified for flooded lead-acid batteries in acceptance testing at clause 7.18.1.1.B.4 of ANSI/NETA ATS-2025.Value: flooded lead-acid batteries.
- tests.battery-intercell-connection-resistance.equipment.battery.maintenance: Battery Intercell Connection Resistance is specified for flooded lead-acid batteries in maintenance testing at clause 7.18.1.1.B.4 of ANSI/NETA MTS-2023.Value: flooded lead-acid batteries.
- tests.battery-intercell-connection-resistance.governed-by.ansi-neta-ats: Battery Intercell Connection Resistance is addressed in ANSI/NETA ATS-2025.
- tests.battery-intercell-connection-resistance.governed-by.ansi-neta-mts: Battery Intercell Connection Resistance is addressed in ANSI/NETA MTS-2023.
- tests.battery-intercell-connection-resistance.governed-by.ieee-450: Battery Intercell Connection Resistance is addressed in IEEE 450-2020.
- tests.battery-intercell-connection-resistance.title: The test method is named Battery Intercell Connection Resistance.Value: Battery Intercell Connection Resistance.
Battery Internal Ohmic Measurement
- tests.battery-internal-ohmic-measurement.equipment.battery.acceptance: Battery Internal Ohmic Measurement is specified for flooded lead-acid batteries in acceptance testing at clause 7.18.1.1.B.5 of ANSI/NETA ATS-2025.Value: flooded lead-acid batteries.
- tests.battery-internal-ohmic-measurement.equipment.battery.maintenance: Battery Internal Ohmic Measurement is specified for flooded lead-acid batteries in maintenance testing at clause 7.18.1.1.B.5 of ANSI/NETA MTS-2023.Value: flooded lead-acid batteries.
- tests.battery-internal-ohmic-measurement.governed-by.ansi-neta-ats: Battery Internal Ohmic Measurement is addressed in ANSI/NETA ATS-2025.
- tests.battery-internal-ohmic-measurement.governed-by.ansi-neta-mts: Battery Internal Ohmic Measurement is addressed in ANSI/NETA MTS-2023.
- tests.battery-internal-ohmic-measurement.title: The test method is named Battery Internal Ohmic Measurement.Value: Battery Internal Ohmic Measurement.
Bolted Connection Resistance
- tests.bolted-connection-resistance.equipment.ats-transfer.acceptance: Bolted Connection Resistance is specified for automatic transfer switches in emergency systems in acceptance testing at clause 7.22.3.B.1 of ANSI/NETA ATS-2025.Value: automatic transfer switches in emergency systems.
- tests.bolted-connection-resistance.equipment.ats-transfer.maintenance: Bolted Connection Resistance is specified for automatic transfer switches in emergency systems in maintenance testing at clause 7.22.3.B.1 of ANSI/NETA MTS-2023.Value: automatic transfer switches in emergency systems.
- tests.bolted-connection-resistance.equipment.battery.acceptance: Bolted Connection Resistance is specified for direct-current system chargers in acceptance testing at clause 7.18.2.B.1 of ANSI/NETA ATS-2025.Value: direct-current system chargers.
- tests.bolted-connection-resistance.equipment.battery.maintenance: Bolted Connection Resistance is specified for direct-current system chargers in maintenance testing at clause 7.18.2.B of ANSI/NETA MTS-2023.Value: direct-current system chargers.
- tests.bolted-connection-resistance.equipment.breaker.acceptance: Bolted Connection Resistance is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.1 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.bolted-connection-resistance.equipment.breaker.maintenance: Bolted Connection Resistance is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.B.1 of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.bolted-connection-resistance.equipment.busway.acceptance: Bolted Connection Resistance is specified for outdoor bus structures in acceptance testing at clause 7.21.B.1 of ANSI/NETA ATS-2025.Value: outdoor bus structures.
- tests.bolted-connection-resistance.equipment.busway.maintenance: Bolted Connection Resistance is specified for outdoor bus structures in maintenance testing at clause 7.21.B.1 of ANSI/NETA MTS-2023.Value: outdoor bus structures.
- tests.bolted-connection-resistance.equipment.capacitor.acceptance: Bolted Connection Resistance is specified for capacitors in acceptance testing at clause 7.20.1.B.1 of ANSI/NETA ATS-2025.Value: capacitors.
- tests.bolted-connection-resistance.equipment.capacitor.maintenance: Bolted Connection Resistance is specified for capacitors in maintenance testing at clause 7.20.1.B.1 of ANSI/NETA MTS-2023.Value: capacitors.
- tests.bolted-connection-resistance.equipment.drive.acceptance: Bolted Connection Resistance is specified for adjustable-speed drive systems in acceptance testing at clause 7.17.B.1 of ANSI/NETA ATS-2025.Value: adjustable-speed drive systems.
- tests.bolted-connection-resistance.equipment.drive.maintenance: Bolted Connection Resistance is specified for adjustable-speed drive systems in maintenance testing at clause 7.17.B.1 of ANSI/NETA MTS-2023.Value: adjustable-speed drive systems.
- tests.bolted-connection-resistance.equipment.evcharging.maintenance: Bolted Connection Resistance is specified for electric vehicle charging systems in maintenance testing at clause 7.26.B.1 of ANSI/NETA MTS-2023.Value: electric vehicle charging systems.
- tests.bolted-connection-resistance.equipment.ground.acceptance: Bolted Connection Resistance is specified for grounding systems in acceptance testing at clause 7.13.B.1 of ANSI/NETA ATS-2025.Value: grounding systems.
- tests.bolted-connection-resistance.equipment.ground.maintenance: Bolted Connection Resistance is specified for grounding systems in maintenance testing at clause 7.13.B of ANSI/NETA MTS-2023.Value: grounding systems.
- tests.bolted-connection-resistance.equipment.instrument.acceptance: Bolted Connection Resistance is specified for coupling-capacitor voltage transformers in acceptance testing at clause 7.10.3.B.1 of ANSI/NETA ATS-2025.Value: coupling-capacitor voltage transformers.
- tests.bolted-connection-resistance.equipment.instrument.maintenance: Bolted Connection Resistance is specified for coupling-capacitor voltage transformers in maintenance testing at clause 7.10.3.B.1 of ANSI/NETA MTS-2023.Value: coupling-capacitor voltage transformers.
- tests.bolted-connection-resistance.equipment.motor.acceptance: Bolted Connection Resistance is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.1 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.bolted-connection-resistance.equipment.motor.maintenance: Bolted Connection Resistance is specified for AC induction motors and generators in maintenance testing at clause 7.15.1.B.1 of ANSI/NETA MTS-2023.Value: AC induction motors and generators.
- tests.bolted-connection-resistance.equipment.network-protector.acceptance: Bolted Connection Resistance is specified for low-voltage network protectors in acceptance testing at clause 7.8.B.1 of ANSI/NETA ATS-2025.Value: low-voltage network protectors.
- tests.bolted-connection-resistance.equipment.network-protector.maintenance: Bolted Connection Resistance is specified for low-voltage network protectors in maintenance testing at clause 7.8.B.1 of ANSI/NETA MTS-2023.Value: low-voltage network protectors.
- tests.bolted-connection-resistance.equipment.reactor.acceptance: Bolted Connection Resistance is specified for dry-type shunt and current-limiting reactors in acceptance testing at clause 7.20.3.1.B.1 of ANSI/NETA ATS-2025.Value: dry-type shunt and current-limiting reactors.
- tests.bolted-connection-resistance.equipment.reactor.maintenance: Bolted Connection Resistance is specified for dry-type shunt and current-limiting reactors in maintenance testing at clause 7.20.3.1.B.1 of ANSI/NETA MTS-2023.Value: dry-type shunt and current-limiting reactors.
- tests.bolted-connection-resistance.equipment.regulator.acceptance: Bolted Connection Resistance is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.1 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.bolted-connection-resistance.equipment.regulator.maintenance: Bolted Connection Resistance is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.1 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.bolted-connection-resistance.equipment.relay.acceptance: Bolted Connection Resistance is specified for low-voltage ground-fault protection systems in acceptance testing at clause 7.14.B.1 of ANSI/NETA ATS-2025.Value: low-voltage ground-fault protection systems.
- tests.bolted-connection-resistance.equipment.relay.maintenance: Bolted Connection Resistance is specified for low-voltage ground-fault protection systems in maintenance testing at clause 7.14.B of ANSI/NETA MTS-2023.Value: low-voltage ground-fault protection systems.
- tests.bolted-connection-resistance.equipment.resistor.acceptance: Bolted Connection Resistance is specified for resistors in acceptance testing at clause 7.20.4.B.1 of ANSI/NETA ATS-2025.Value: resistors.
- tests.bolted-connection-resistance.equipment.resistor.maintenance: Bolted Connection Resistance is specified for resistors in maintenance testing at clause 7.20.4.B.1 of ANSI/NETA MTS-2023.Value: resistors.
- tests.bolted-connection-resistance.equipment.sectionalizer.acceptance: Bolted Connection Resistance is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.1 of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.bolted-connection-resistance.equipment.sectionalizer.maintenance: Bolted Connection Resistance is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.1 of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.bolted-connection-resistance.equipment.surge.acceptance: Bolted Connection Resistance is specified for medium-voltage and high-voltage surge arresters in acceptance testing at clause 7.19.2.B.1 of ANSI/NETA ATS-2025.Value: medium-voltage and high-voltage surge arresters.
- tests.bolted-connection-resistance.equipment.surge.maintenance: Bolted Connection Resistance is specified for low-voltage surge protective devices in maintenance testing at clause 7.19.1.B.1 of ANSI/NETA MTS-2023.Value: low-voltage surge protective devices.
- tests.bolted-connection-resistance.equipment.switch.acceptance: Bolted Connection Resistance is specified for low-voltage air switches in acceptance testing at clause 7.5.1.1.B.1 of ANSI/NETA ATS-2025.Value: low-voltage air switches.
- tests.bolted-connection-resistance.equipment.switch.maintenance: Bolted Connection Resistance is specified for low-voltage air switches in maintenance testing at clause 7.5.1.1.B of ANSI/NETA MTS-2023.Value: low-voltage air switches.
- tests.bolted-connection-resistance.equipment.switchgear.acceptance: Bolted Connection Resistance is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.1 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.bolted-connection-resistance.equipment.transformer-fluid.acceptance: Bolted Connection Resistance is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.1 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.bolted-connection-resistance.equipment.transformer-fluid.maintenance: Bolted Connection Resistance is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.1 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.bolted-connection-resistance.equipment.transformer.acceptance: Bolted Connection Resistance is specified for small low-voltage air-cooled dry-type transformers in acceptance testing at clause 7.2.1.1.B.1 of ANSI/NETA ATS-2025.Value: small low-voltage air-cooled dry-type transformers.
- tests.bolted-connection-resistance.equipment.transformer.maintenance: Bolted Connection Resistance is specified for small low-voltage air-cooled dry-type transformers in maintenance testing at clause 7.2.1.1.B.1 of ANSI/NETA MTS-2023.Value: small low-voltage air-cooled dry-type transformers.
- tests.bolted-connection-resistance.equipment.ups.acceptance: Bolted Connection Resistance is specified for uninterruptible power systems in acceptance testing at clause 7.22.2.B.1 of ANSI/NETA ATS-2025.Value: uninterruptible power systems.
- tests.bolted-connection-resistance.equipment.ups.maintenance: Bolted Connection Resistance is specified for uninterruptible power systems in maintenance testing at clause 7.22.2.B.1 of ANSI/NETA MTS-2023.Value: uninterruptible power systems.
- tests.bolted-connection-resistance.governed-by.ansi-neta-ats: Bolted Connection Resistance is addressed in ANSI/NETA ATS-2025.
- tests.bolted-connection-resistance.governed-by.ansi-neta-mts: Bolted Connection Resistance is addressed in ANSI/NETA MTS-2023.
- tests.bolted-connection-resistance.title: The test method is named Bolted Connection Resistance.Value: Bolted Connection Resistance.
Bushing Power Factor and Capacitance
- tests.bushing-power-factor-and-capacitance.equipment.breaker.acceptance: Bushing Power Factor and Capacitance is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.8 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.bushing-power-factor-and-capacitance.equipment.breaker.maintenance: Bushing Power Factor and Capacitance is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.B.8 of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.bushing-power-factor-and-capacitance.equipment.reactor.acceptance: Bushing Power Factor and Capacitance is specified for liquid-filled shunt and current-limiting reactors in acceptance testing at clause 7.20.3.2.B.4 of ANSI/NETA ATS-2025.Value: liquid-filled shunt and current-limiting reactors.
- tests.bushing-power-factor-and-capacitance.equipment.reactor.maintenance: Bushing Power Factor and Capacitance is specified for liquid-filled shunt and current-limiting reactors in maintenance testing at clause 7.20.3.2.B of ANSI/NETA MTS-2023.Value: liquid-filled shunt and current-limiting reactors.
- tests.bushing-power-factor-and-capacitance.equipment.regulator.acceptance: Bushing Power Factor and Capacitance is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.4 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.bushing-power-factor-and-capacitance.equipment.regulator.maintenance: Bushing Power Factor and Capacitance is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.4 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.bushing-power-factor-and-capacitance.equipment.sectionalizer.acceptance: Bushing Power Factor and Capacitance is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.10 of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.bushing-power-factor-and-capacitance.equipment.sectionalizer.maintenance: Bushing Power Factor and Capacitance is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.10 of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.bushing-power-factor-and-capacitance.equipment.transformer-fluid.acceptance: Bushing Power Factor and Capacitance is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.5 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.bushing-power-factor-and-capacitance.equipment.transformer-fluid.maintenance: Bushing Power Factor and Capacitance is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.5 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.bushing-power-factor-and-capacitance.governed-by.ansi-neta-ats: Bushing Power Factor and Capacitance is addressed in ANSI/NETA ATS-2025.
- tests.bushing-power-factor-and-capacitance.governed-by.ansi-neta-mts: Bushing Power Factor and Capacitance is addressed in ANSI/NETA MTS-2023.
- tests.bushing-power-factor-and-capacitance.title: The test method is named Bushing Power Factor and Capacitance.Value: Bushing Power Factor and Capacitance.
Cable Jacket Integrity
- tests.cable-jacket-integrity.equipment.cable.acceptance: Cable Jacket Integrity is specified for shielded medium-voltage and high-voltage cables in acceptance testing at clause 7.3.3.B.4 of ANSI/NETA ATS-2025.Value: shielded medium-voltage and high-voltage cables.
- tests.cable-jacket-integrity.equipment.cable.maintenance: Cable Jacket Integrity is specified for shielded medium-voltage and high-voltage cables in maintenance testing at clause 7.3.3.B.4 of ANSI/NETA MTS-2023.Value: shielded medium-voltage and high-voltage cables.
- tests.cable-jacket-integrity.governed-by.ansi-neta-ats: Cable Jacket Integrity is addressed in ANSI/NETA ATS-2025.
- tests.cable-jacket-integrity.governed-by.ansi-neta-mts: Cable Jacket Integrity is addressed in ANSI/NETA MTS-2023.
- tests.cable-jacket-integrity.title: The test method is named Cable Jacket Integrity.Value: Cable Jacket Integrity.
Cable Tan Delta
- tests.cable-tan-delta.equipment.cable.acceptance: Cable Tan Delta is specified for shielded medium-voltage and high-voltage cables in acceptance testing at clause 7.3.3.B.6 of ANSI/NETA ATS-2025.Value: shielded medium-voltage and high-voltage cables.
- tests.cable-tan-delta.equipment.cable.maintenance: Cable Tan Delta is specified for shielded medium-voltage and high-voltage cables in maintenance testing at clause 7.3.3.B.7 of ANSI/NETA MTS-2023.Value: shielded medium-voltage and high-voltage cables.
- tests.cable-tan-delta.governed-by.ansi-neta-ats: Cable Tan Delta is addressed in ANSI/NETA ATS-2025.
- tests.cable-tan-delta.governed-by.ansi-neta-mts: Cable Tan Delta is addressed in ANSI/NETA MTS-2023.
- tests.cable-tan-delta.title: The test method is named Cable Tan Delta.Value: Cable Tan Delta.
Capacitance Measurement
- tests.capacitance-measurement.equipment.capacitor.acceptance: Capacitance Measurement is specified for capacitors in acceptance testing at clause 7.20.1.B.3 of ANSI/NETA ATS-2025.Value: capacitors.
- tests.capacitance-measurement.equipment.capacitor.maintenance: Capacitance Measurement is specified for capacitors in maintenance testing at clause 7.20.1.B.3 of ANSI/NETA MTS-2023.Value: capacitors.
- tests.capacitance-measurement.equipment.instrument.acceptance: Capacitance Measurement is specified for coupling-capacitor voltage transformers in acceptance testing at clause 7.10.3.B.7 of ANSI/NETA ATS-2025.Value: coupling-capacitor voltage transformers.
- tests.capacitance-measurement.equipment.instrument.maintenance: Capacitance Measurement is specified for coupling-capacitor voltage transformers in maintenance testing at clause 7.10.3.B.7 of ANSI/NETA MTS-2023.Value: coupling-capacitor voltage transformers.
- tests.capacitance-measurement.governed-by.ansi-neta-ats: Capacitance Measurement is addressed in ANSI/NETA ATS-2025.
- tests.capacitance-measurement.governed-by.ansi-neta-mts: Capacitance Measurement is addressed in ANSI/NETA MTS-2023.
- tests.capacitance-measurement.title: The test method is named Capacitance Measurement.Value: Capacitance Measurement.
Circuit Breaker Timing and Travel
- tests.circuit-breaker-timing-and-travel.equipment.ats-transfer.acceptance: Circuit Breaker Timing and Travel is specified for automatic transfer switches in emergency systems in acceptance testing at clause 7.22.3.B.8 of ANSI/NETA ATS-2025.Value: automatic transfer switches in emergency systems.
- tests.circuit-breaker-timing-and-travel.equipment.ats-transfer.maintenance: Circuit Breaker Timing and Travel is specified for automatic transfer switches in emergency systems in maintenance testing at clause 7.22.3.B.7 of ANSI/NETA MTS-2023.Value: automatic transfer switches in emergency systems.
- tests.circuit-breaker-timing-and-travel.equipment.breaker.acceptance: Circuit Breaker Timing and Travel is specified for medium-voltage vacuum circuit breakers in acceptance testing at clause 7.6.3.A.7, 7.6.3.A.12 of ANSI/NETA ATS-2025.Value: medium-voltage vacuum circuit breakers.
- tests.circuit-breaker-timing-and-travel.governed-by.ansi-neta-ats: Circuit Breaker Timing and Travel is addressed in ANSI/NETA ATS-2025.
- tests.circuit-breaker-timing-and-travel.governed-by.ansi-neta-mts: Circuit Breaker Timing and Travel is addressed in ANSI/NETA MTS-2023.
- tests.circuit-breaker-timing-and-travel.title: The test method is named Circuit Breaker Timing and Travel.Value: Circuit Breaker Timing and Travel.
Commutator Bar to Bar Resistance
- tests.commutator-bar-to-bar-resistance.equipment.motor.acceptance: Commutator Bar to Bar Resistance is specified for DC motors and generators in acceptance testing at clause 7.15.3.B.6 of ANSI/NETA ATS-2025.Value: DC motors and generators.
- tests.commutator-bar-to-bar-resistance.governed-by.ansi-neta-ats: Commutator Bar to Bar Resistance is addressed in ANSI/NETA ATS-2025.
- tests.commutator-bar-to-bar-resistance.title: The test method is named Commutator Bar to Bar Resistance.Value: Commutator Bar to Bar Resistance.
Constant Current Regulator Output
- tests.constant-current-regulator-output.governed-by.faa-ac-150-5345-10h: Constant Current Regulator Output is addressed in FAA AC 150/5345-10H.
- tests.constant-current-regulator-output.title: The test method is named Constant Current Regulator Output.Value: Constant Current Regulator Output.
Contact Resistance
- tests.contact-resistance.equipment.ats-transfer.acceptance: Contact Resistance is specified for automatic transfer switches in emergency systems in acceptance testing at clause 7.22.3.B.4 of ANSI/NETA ATS-2025.Value: automatic transfer switches in emergency systems.
- tests.contact-resistance.equipment.ats-transfer.maintenance: Contact Resistance is specified for automatic transfer switches in emergency systems in maintenance testing at clause 7.22.3.B.3 of ANSI/NETA MTS-2023.Value: automatic transfer switches in emergency systems.
- tests.contact-resistance.equipment.breaker.acceptance: Contact Resistance is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.3 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.contact-resistance.equipment.breaker.maintenance: Contact Resistance is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.B.3 of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.contact-resistance.equipment.motor.acceptance: Contact Resistance is specified for medium-voltage motor starters in acceptance testing at clause 7.16.1.2.B.6 of ANSI/NETA ATS-2025.Value: medium-voltage motor starters.
- tests.contact-resistance.equipment.motor.maintenance: Contact Resistance is specified for medium-voltage motor starters in maintenance testing at clause 7.16.1.2.B.7 of ANSI/NETA MTS-2023.Value: medium-voltage motor starters.
- tests.contact-resistance.equipment.network-protector.acceptance: Contact Resistance is specified for low-voltage network protectors in acceptance testing at clause 7.8.B.3 of ANSI/NETA ATS-2025.Value: low-voltage network protectors.
- tests.contact-resistance.equipment.network-protector.maintenance: Contact Resistance is specified for low-voltage network protectors in maintenance testing at clause 7.8.B.3 of ANSI/NETA MTS-2023.Value: low-voltage network protectors.
- tests.contact-resistance.equipment.sectionalizer.acceptance: Contact Resistance is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.3 of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.contact-resistance.equipment.sectionalizer.maintenance: Contact Resistance is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.3 of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.contact-resistance.equipment.switch.acceptance: Contact Resistance is specified for low-voltage air switches in acceptance testing at clause 7.5.1.1.B.2 of ANSI/NETA ATS-2025.Value: low-voltage air switches.
- tests.contact-resistance.equipment.switch.maintenance: Contact Resistance is specified for low-voltage air switches in maintenance testing at clause 7.5.1.1.B of ANSI/NETA MTS-2023.Value: low-voltage air switches.
- tests.contact-resistance.governed-by.ansi-neta-ats: Contact Resistance is addressed in ANSI/NETA ATS-2025.
- tests.contact-resistance.governed-by.ansi-neta-mts: Contact Resistance is addressed in ANSI/NETA MTS-2023.
- tests.contact-resistance.title: The test method is named Contact Resistance.Value: Contact Resistance.
Continuity and Shield Continuity
- tests.continuity-and-shield-continuity.equipment.cable.acceptance: Continuity and Shield Continuity is specified for low-voltage cables in acceptance testing at clause 7.3.2.B.2 of ANSI/NETA ATS-2025.Value: low-voltage cables.
- tests.continuity-and-shield-continuity.equipment.cable.maintenance: Continuity and Shield Continuity is specified for shielded medium-voltage and high-voltage cables in maintenance testing at clause 7.3.3.B.3 of ANSI/NETA MTS-2023.Value: shielded medium-voltage and high-voltage cables.
- tests.continuity-and-shield-continuity.governed-by.ansi-neta-ats: Continuity and Shield Continuity is addressed in ANSI/NETA ATS-2025.
- tests.continuity-and-shield-continuity.governed-by.ansi-neta-mts: Continuity and Shield Continuity is addressed in ANSI/NETA MTS-2023.
- tests.continuity-and-shield-continuity.title: The test method is named Continuity and Shield Continuity.Value: Continuity and Shield Continuity.
Control and Functional Verification
- tests.control-and-functional-verification.equipment.ats-transfer.acceptance: Control and Functional Verification is specified for automatic transfer switches in emergency systems in acceptance testing at clause 7.22.3.B.5 of ANSI/NETA ATS-2025.Value: automatic transfer switches in emergency systems.
- tests.control-and-functional-verification.equipment.ats-transfer.maintenance: Control and Functional Verification is specified for automatic transfer switches in emergency systems in maintenance testing at clause 7.22.3.B.4 of ANSI/NETA MTS-2023.Value: automatic transfer switches in emergency systems.
- tests.control-and-functional-verification.equipment.battery.acceptance: Control and Functional Verification is specified for direct-current system chargers in acceptance testing at clause 7.18.2.B.6 of ANSI/NETA ATS-2025.Value: direct-current system chargers.
- tests.control-and-functional-verification.equipment.battery.maintenance: Control and Functional Verification is specified for direct-current system chargers in maintenance testing at clause 7.18.2.B of ANSI/NETA MTS-2023.Value: direct-current system chargers.
- tests.control-and-functional-verification.equipment.breaker.acceptance: Control and Functional Verification is specified for low-voltage insulated-case circuit breakers in acceptance testing at clause 7.6.1.1.2.B.8 of ANSI/NETA ATS-2025.Value: low-voltage insulated-case circuit breakers.
- tests.control-and-functional-verification.equipment.breaker.maintenance: Control and Functional Verification is specified for low-voltage power circuit breakers in maintenance testing at clause 7.6.1.2.B.11 of ANSI/NETA MTS-2023.Value: low-voltage power circuit breakers.
- tests.control-and-functional-verification.equipment.busway.acceptance: Control and Functional Verification is specified for metal-enclosed busways in acceptance testing at clause 7.4.B.6 of ANSI/NETA ATS-2025.Value: metal-enclosed busways.
- tests.control-and-functional-verification.equipment.busway.maintenance: Control and Functional Verification is specified for metal-enclosed busways in maintenance testing at clause 7.4.B.6 of ANSI/NETA MTS-2023.Value: metal-enclosed busways.
- tests.control-and-functional-verification.equipment.drive.acceptance: Control and Functional Verification is specified for adjustable-speed drive systems in acceptance testing at clause 7.17.B.7 of ANSI/NETA ATS-2025.Value: adjustable-speed drive systems.
- tests.control-and-functional-verification.equipment.drive.maintenance: Control and Functional Verification is specified for adjustable-speed drive systems in maintenance testing at clause 7.17.B.7 of ANSI/NETA MTS-2023.Value: adjustable-speed drive systems.
- tests.control-and-functional-verification.equipment.instrument.acceptance: Control and Functional Verification is specified for microprocessor-based metering devices in acceptance testing at clause 7.11.2.B.2 of ANSI/NETA ATS-2025.Value: microprocessor-based metering devices.
- tests.control-and-functional-verification.equipment.instrument.maintenance: Control and Functional Verification is specified for microprocessor-based metering devices in maintenance testing at clause 7.11.2.B of ANSI/NETA MTS-2023.Value: microprocessor-based metering devices.
- tests.control-and-functional-verification.equipment.motor.acceptance: Control and Functional Verification is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.12 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.control-and-functional-verification.equipment.motor.maintenance: Control and Functional Verification is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.control-and-functional-verification.equipment.network-protector.acceptance: Control and Functional Verification is specified for low-voltage network protectors in acceptance testing at clause 7.8.B.11 of ANSI/NETA ATS-2025.Value: low-voltage network protectors.
- tests.control-and-functional-verification.equipment.network-protector.maintenance: Control and Functional Verification is specified for low-voltage network protectors in maintenance testing at clause 7.8.B.11 of ANSI/NETA MTS-2023.Value: low-voltage network protectors.
- tests.control-and-functional-verification.equipment.regulator.acceptance: Control and Functional Verification is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.11 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.control-and-functional-verification.equipment.regulator.maintenance: Control and Functional Verification is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.10 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.control-and-functional-verification.equipment.relay.acceptance: Control and Functional Verification is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.4 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.control-and-functional-verification.equipment.relay.maintenance: Control and Functional Verification is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.4 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.control-and-functional-verification.equipment.switch.acceptance: Control and Functional Verification is specified for low-voltage air switches in acceptance testing at clause 7.5.1.1.B.5 of ANSI/NETA ATS-2025.Value: low-voltage air switches.
- tests.control-and-functional-verification.equipment.switch.maintenance: Control and Functional Verification is specified for low-voltage air switches in maintenance testing at clause 7.5.1.1.B of ANSI/NETA MTS-2023.Value: low-voltage air switches.
- tests.control-and-functional-verification.equipment.switchgear.acceptance: Control and Functional Verification is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.12 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.control-and-functional-verification.equipment.transformer-fluid.acceptance: Control and Functional Verification is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.19 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.control-and-functional-verification.equipment.transformer-fluid.maintenance: Control and Functional Verification is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.19 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.control-and-functional-verification.equipment.transformer.acceptance: Control and Functional Verification is specified for large air-cooled dry-type transformers in acceptance testing at clause 7.2.1.2.B.10 of ANSI/NETA ATS-2025.Value: large air-cooled dry-type transformers.
- tests.control-and-functional-verification.equipment.transformer.maintenance: Control and Functional Verification is specified for large air-cooled dry-type transformers in maintenance testing at clause 7.2.1.2.B.10 of ANSI/NETA MTS-2023.Value: large air-cooled dry-type transformers.
- tests.control-and-functional-verification.equipment.ups.acceptance: Control and Functional Verification is specified for uninterruptible power systems in acceptance testing at clause 7.22.2.B.5 of ANSI/NETA ATS-2025.Value: uninterruptible power systems.
- tests.control-and-functional-verification.equipment.ups.maintenance: Control and Functional Verification is specified for uninterruptible power systems in maintenance testing at clause 7.22.2.B.5 of ANSI/NETA MTS-2023.Value: uninterruptible power systems.
- tests.control-and-functional-verification.governed-by.ansi-neta-ats: Control and Functional Verification is addressed in ANSI/NETA ATS-2025.
- tests.control-and-functional-verification.governed-by.ansi-neta-mts: Control and Functional Verification is addressed in ANSI/NETA MTS-2023.
- tests.control-and-functional-verification.governed-by.faa-ac-150-5345-10h: Control and Functional Verification is addressed in FAA AC 150/5345-10H.
- tests.control-and-functional-verification.title: The test method is named Control and Functional Verification.Value: Control and Functional Verification.
CT Excitation and Saturation
- tests.ct-excitation-and-saturation.equipment.instrument.acceptance: CT Excitation and Saturation is specified for current transformers in acceptance testing at clause 7.10.1.B.4 of ANSI/NETA ATS-2025.Value: current transformers.
- tests.ct-excitation-and-saturation.equipment.instrument.maintenance: CT Excitation and Saturation is specified for current transformers in maintenance testing at clause 7.10.1.B.5 of ANSI/NETA MTS-2023.Value: current transformers.
- tests.ct-excitation-and-saturation.governed-by.ansi-neta-ats: CT Excitation and Saturation is addressed in ANSI/NETA ATS-2025.
- tests.ct-excitation-and-saturation.governed-by.ansi-neta-mts: CT Excitation and Saturation is addressed in ANSI/NETA MTS-2023.
- tests.ct-excitation-and-saturation.governed-by.ieee-c57-13: CT Excitation and Saturation is addressed in IEEE C57.13-2016.
- tests.ct-excitation-and-saturation.governed-by.ieee-c57-13-1: CT Excitation and Saturation is addressed in IEEE C57.13.1-2017.
- tests.ct-excitation-and-saturation.title: The test method is named CT Excitation and Saturation.Value: CT Excitation and Saturation.
Current Circuit Injection
- tests.current-circuit-injection.equipment.switchgear.acceptance: Current Circuit Injection is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.10 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.current-circuit-injection.governed-by.ansi-neta-ats: Current Circuit Injection is addressed in ANSI/NETA ATS-2025.
- tests.current-circuit-injection.governed-by.ansi-neta-mts: Current Circuit Injection is addressed in ANSI/NETA MTS-2023.
- tests.current-circuit-injection.title: The test method is named Current Circuit Injection.Value: Current Circuit Injection.
DC System Ground Detection
- tests.dc-system-ground-detection.equipment.battery.acceptance: DC System Ground Detection is specified for flooded lead-acid batteries in acceptance testing at clause 7.18.1.1.B.7 of ANSI/NETA ATS-2025.Value: flooded lead-acid batteries.
- tests.dc-system-ground-detection.equipment.battery.maintenance: DC System Ground Detection is specified for flooded lead-acid batteries in maintenance testing at clause 7.18.1.1.B.7 of ANSI/NETA MTS-2023.Value: flooded lead-acid batteries.
- tests.dc-system-ground-detection.equipment.solar.acceptance: DC System Ground Detection is specified for solar photovoltaic systems in acceptance testing at clause 7.29.B.8 of ANSI/NETA ATS-2025.Value: solar photovoltaic systems.
- tests.dc-system-ground-detection.governed-by.ansi-neta-ats: DC System Ground Detection is addressed in ANSI/NETA ATS-2025.
- tests.dc-system-ground-detection.governed-by.ansi-neta-mts: DC System Ground Detection is addressed in ANSI/NETA MTS-2023.
- tests.dc-system-ground-detection.governed-by.ieee-946: DC System Ground Detection is addressed in IEEE 946-2020.
- tests.dc-system-ground-detection.title: The test method is named DC System Ground Detection.Value: DC System Ground Detection.
Dielectric Frequency Response
- tests.dielectric-frequency-response.equipment.transformer-fluid.acceptance: Dielectric Frequency Response is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.13 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.dielectric-frequency-response.equipment.transformer-fluid.maintenance: Dielectric Frequency Response is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.13 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.dielectric-frequency-response.governed-by.ansi-neta-ats: Dielectric Frequency Response is addressed in ANSI/NETA ATS-2025.
- tests.dielectric-frequency-response.governed-by.ansi-neta-mts: Dielectric Frequency Response is addressed in ANSI/NETA MTS-2023.
- tests.dielectric-frequency-response.title: The test method is named Dielectric Frequency Response.Value: Dielectric Frequency Response.
Dielectric Withstand
- tests.dielectric-withstand.equipment.breaker.acceptance: Dielectric Withstand is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.11 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.dielectric-withstand.equipment.breaker.maintenance: Dielectric Withstand is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.B.10 of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.dielectric-withstand.equipment.busway.acceptance: Dielectric Withstand is specified for outdoor bus structures in acceptance testing at clause 7.21.B.3 of ANSI/NETA ATS-2025.Value: outdoor bus structures.
- tests.dielectric-withstand.equipment.busway.maintenance: Dielectric Withstand is specified for outdoor bus structures in maintenance testing at clause 7.21.B.3 of ANSI/NETA MTS-2023.Value: outdoor bus structures.
- tests.dielectric-withstand.equipment.cable.acceptance: Dielectric Withstand is specified for shielded medium-voltage and high-voltage cables in acceptance testing at clause 7.3.3 of ANSI/NETA ATS-2025.Value: shielded medium-voltage and high-voltage cables.
- tests.dielectric-withstand.equipment.cable.maintenance: Dielectric Withstand is specified for shielded medium-voltage and high-voltage cables in maintenance testing at clause 7.3.3.B.6 of ANSI/NETA MTS-2023.Value: shielded medium-voltage and high-voltage cables.
- tests.dielectric-withstand.equipment.instrument.acceptance: Dielectric Withstand is specified for current transformers in acceptance testing at clause 7.10.1.B.7 of ANSI/NETA ATS-2025.Value: current transformers.
- tests.dielectric-withstand.equipment.instrument.maintenance: Dielectric Withstand is specified for current transformers in maintenance testing at clause 7.10.1.B.8 of ANSI/NETA MTS-2023.Value: current transformers.
- tests.dielectric-withstand.equipment.motor.acceptance: Dielectric Withstand is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.3 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.dielectric-withstand.equipment.motor.maintenance: Dielectric Withstand is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.dielectric-withstand.equipment.reactor.acceptance: Dielectric Withstand is specified for dry-type shunt and current-limiting reactors in acceptance testing at clause 7.20.3.1.B.4 of ANSI/NETA ATS-2025.Value: dry-type shunt and current-limiting reactors.
- tests.dielectric-withstand.equipment.reactor.maintenance: Dielectric Withstand is specified for dry-type shunt and current-limiting reactors in maintenance testing at clause 7.20.3.1.B.4 of ANSI/NETA MTS-2023.Value: dry-type shunt and current-limiting reactors.
- tests.dielectric-withstand.equipment.sectionalizer.acceptance: Dielectric Withstand is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.5 of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.dielectric-withstand.equipment.sectionalizer.maintenance: Dielectric Withstand is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.5 of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.dielectric-withstand.equipment.switch.acceptance: Dielectric Withstand is specified for metal-enclosed medium-voltage air switches in acceptance testing at clause 7.5.1.2.B.4 of ANSI/NETA ATS-2025.Value: metal-enclosed medium-voltage air switches.
- tests.dielectric-withstand.equipment.switch.maintenance: Dielectric Withstand is specified for metal-enclosed medium-voltage air switches in maintenance testing at clause 7.5.1.2.B of ANSI/NETA MTS-2023.Value: metal-enclosed medium-voltage air switches.
- tests.dielectric-withstand.equipment.switchgear.acceptance: Dielectric Withstand is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.3 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.dielectric-withstand.equipment.transformer.acceptance: Dielectric Withstand is specified for large air-cooled dry-type transformers in acceptance testing at clause 7.2.1.2.B.9 of ANSI/NETA ATS-2025.Value: large air-cooled dry-type transformers.
- tests.dielectric-withstand.equipment.transformer.maintenance: Dielectric Withstand is specified for large air-cooled dry-type transformers in maintenance testing at clause 7.2.1.2.B.9 of ANSI/NETA MTS-2023.Value: large air-cooled dry-type transformers.
- tests.dielectric-withstand.governed-by.ansi-neta-ats: Dielectric Withstand is addressed in ANSI/NETA ATS-2025.
- tests.dielectric-withstand.governed-by.ansi-neta-mts: Dielectric Withstand is addressed in ANSI/NETA MTS-2023.
- tests.dielectric-withstand.governed-by.faa-ac-150-5345-10h: Dielectric Withstand is addressed in FAA AC 150/5345-10H.
- tests.dielectric-withstand.governed-by.ieee-c57-12-91: Dielectric Withstand is addressed in IEEE C57.12.91-2020.
- tests.dielectric-withstand.title: The test method is named Dielectric Withstand.Value: Dielectric Withstand.
Dissolved Gas Analysis
- tests.dissolved-gas-analysis.equipment.reactor.acceptance: Dissolved Gas Analysis is specified for liquid-filled shunt and current-limiting reactors in acceptance testing at clause 7.20.3.2.B.8 of ANSI/NETA ATS-2025.Value: liquid-filled shunt and current-limiting reactors.
- tests.dissolved-gas-analysis.equipment.reactor.maintenance: Dissolved Gas Analysis is specified for liquid-filled shunt and current-limiting reactors in maintenance testing at clause 7.20.3.2.B of ANSI/NETA MTS-2023.Value: liquid-filled shunt and current-limiting reactors.
- tests.dissolved-gas-analysis.equipment.regulator.acceptance: Dissolved Gas Analysis is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.13 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.dissolved-gas-analysis.equipment.regulator.maintenance: Dissolved Gas Analysis is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.11 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.dissolved-gas-analysis.equipment.transformer-fluid.acceptance: Dissolved Gas Analysis is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.15 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.dissolved-gas-analysis.equipment.transformer-fluid.maintenance: Dissolved Gas Analysis is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.15 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.dissolved-gas-analysis.governed-by.ansi-neta-ats: Dissolved Gas Analysis is addressed in ANSI/NETA ATS-2025.
- tests.dissolved-gas-analysis.governed-by.ansi-neta-mts: Dissolved Gas Analysis is addressed in ANSI/NETA MTS-2023.
- tests.dissolved-gas-analysis.title: The test method is named Dissolved Gas Analysis.Value: Dissolved Gas Analysis.
Dynamic Contact Resistance
- tests.dynamic-contact-resistance.equipment.breaker.acceptance: Dynamic Contact Resistance is specified for medium-voltage and high-voltage oil circuit breakers in acceptance testing at clause 7.6.2.B.4 of ANSI/NETA ATS-2025.Value: medium-voltage and high-voltage oil circuit breakers.
- tests.dynamic-contact-resistance.equipment.breaker.maintenance: Dynamic Contact Resistance is specified for medium-voltage and high-voltage oil circuit breakers in maintenance testing at clause 7.6.2.B of ANSI/NETA MTS-2023.Value: medium-voltage and high-voltage oil circuit breakers.
- tests.dynamic-contact-resistance.governed-by.ansi-neta-ats: Dynamic Contact Resistance is addressed in ANSI/NETA ATS-2025.
- tests.dynamic-contact-resistance.governed-by.ansi-neta-mts: Dynamic Contact Resistance is addressed in ANSI/NETA MTS-2023.
- tests.dynamic-contact-resistance.title: The test method is named Dynamic Contact Resistance.Value: Dynamic Contact Resistance.
Dynamic Winding Resistance
- tests.dynamic-winding-resistance.equipment.regulator.acceptance: Dynamic Winding Resistance is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.6 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.dynamic-winding-resistance.equipment.regulator.maintenance: Dynamic Winding Resistance is specified for load tap changers in maintenance testing at clause 7.12.3.B.5 of ANSI/NETA MTS-2023.Value: load tap changers.
- tests.dynamic-winding-resistance.equipment.transformer-fluid.acceptance: Dynamic Winding Resistance is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.9 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.dynamic-winding-resistance.equipment.transformer-fluid.maintenance: Dynamic Winding Resistance is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.9 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.dynamic-winding-resistance.governed-by.ansi-neta-ats: Dynamic Winding Resistance is addressed in ANSI/NETA ATS-2025.
- tests.dynamic-winding-resistance.governed-by.ansi-neta-mts: Dynamic Winding Resistance is addressed in ANSI/NETA MTS-2023.
- tests.dynamic-winding-resistance.title: The test method is named Dynamic Winding Resistance.Value: Dynamic Winding Resistance.
EMF Survey
- tests.emf-survey.governed-by.ansi-neta-ats: EMF Survey is addressed in ANSI/NETA ATS-2025.
- tests.emf-survey.governed-by.ansi-neta-mts: EMF Survey is addressed in ANSI/NETA MTS-2023.
- tests.emf-survey.title: The test method is named EMF Survey.Value: EMF Survey.
Energization Checks
- tests.energization-checks.equipment.ats-transfer.commissioning: Energization Checks is specified for automatic transfer switches in commissioning testing at clause 8.3.A of ANSI/NETA ECS-2024.Value: automatic transfer switches.
- tests.energization-checks.equipment.commissioning-system.commissioning: Energization Checks is specified for low-voltage systems in commissioning testing at clause 7.1.A of ANSI/NETA ECS-2024.Value: low-voltage systems.
- tests.energization-checks.equipment.solar.commissioning: Energization Checks is specified for solar photovoltaic systems in commissioning testing at clause 8.1.A of ANSI/NETA ECS-2024.Value: solar photovoltaic systems.
- tests.energization-checks.equipment.ups.commissioning: Energization Checks is specified for uninterruptible power supply systems in commissioning testing at clause 8.2.A of ANSI/NETA ECS-2024.Value: uninterruptible power supply systems.
- tests.energization-checks.governed-by.ansi-neta-ecs: Energization Checks is addressed in ANSI/NETA ECS-2024.
- tests.energization-checks.title: The test method is named Energization Checks.Value: Energization Checks.
Engine Generator Load and Performance
- tests.engine-generator-load-and-performance.equipment.generator.acceptance: Engine Generator Load and Performance is specified for engine-generator emergency systems in acceptance testing at clause 7.22.1.B.6 of ANSI/NETA ATS-2025.Value: engine-generator emergency systems.
- tests.engine-generator-load-and-performance.equipment.generator.maintenance: Engine Generator Load and Performance is specified for engine-generator emergency systems in maintenance testing at clause 7.22.1.B.5 of ANSI/NETA MTS-2023.Value: engine-generator emergency systems.
- tests.engine-generator-load-and-performance.governed-by.ansi-neta-ats: Engine Generator Load and Performance is addressed in ANSI/NETA ATS-2025.
- tests.engine-generator-load-and-performance.governed-by.ansi-neta-mts: Engine Generator Load and Performance is addressed in ANSI/NETA MTS-2023.
- tests.engine-generator-load-and-performance.title: The test method is named Engine Generator Load and Performance.Value: Engine Generator Load and Performance.
Engine Generator Safety Shutdowns
- tests.engine-generator-safety-shutdowns.equipment.generator.acceptance: Engine Generator Safety Shutdowns is specified for engine-generator emergency systems in acceptance testing at clause 7.22.1 of ANSI/NETA ATS-2025.Value: engine-generator emergency systems.
- tests.engine-generator-safety-shutdowns.equipment.generator.maintenance: Engine Generator Safety Shutdowns is specified for engine-generator emergency systems in maintenance testing at clause 7.22.1.B.3 of ANSI/NETA MTS-2023.Value: engine-generator emergency systems.
- tests.engine-generator-safety-shutdowns.governed-by.ansi-neta-ats: Engine Generator Safety Shutdowns is addressed in ANSI/NETA ATS-2025.
- tests.engine-generator-safety-shutdowns.governed-by.ansi-neta-mts: Engine Generator Safety Shutdowns is addressed in ANSI/NETA MTS-2023.
- tests.engine-generator-safety-shutdowns.title: The test method is named Engine Generator Safety Shutdowns.Value: Engine Generator Safety Shutdowns.
Fiber Optic Attenuation and Power
- tests.fiber-optic-attenuation-and-power.equipment.cable.acceptance: Fiber Optic Attenuation and Power is specified for fiber-optic cables in acceptance testing at clause 7.25.B.3 of ANSI/NETA ATS-2025.Value: fiber-optic cables.
- tests.fiber-optic-attenuation-and-power.equipment.cable.maintenance: Fiber Optic Attenuation and Power is specified for fiber-optic cables in maintenance testing at clause 7.25.B.3 of ANSI/NETA MTS-2023.Value: fiber-optic cables.
- tests.fiber-optic-attenuation-and-power.governed-by.ansi-neta-ats: Fiber Optic Attenuation and Power is addressed in ANSI/NETA ATS-2025.
- tests.fiber-optic-attenuation-and-power.governed-by.ansi-neta-mts: Fiber Optic Attenuation and Power is addressed in ANSI/NETA MTS-2023.
- tests.fiber-optic-attenuation-and-power.title: The test method is named Fiber Optic Attenuation and Power.Value: Fiber Optic Attenuation and Power.
Fiber Optic OTDR Testing
- tests.fiber-optic-otdr-testing.equipment.cable.acceptance: Fiber Optic OTDR Testing is specified for fiber-optic cables in acceptance testing at clause 7.25.B.1 of ANSI/NETA ATS-2025.Value: fiber-optic cables.
- tests.fiber-optic-otdr-testing.equipment.cable.maintenance: Fiber Optic OTDR Testing is specified for fiber-optic cables in maintenance testing at clause 7.25.B.1 of ANSI/NETA MTS-2023.Value: fiber-optic cables.
- tests.fiber-optic-otdr-testing.governed-by.ansi-neta-ats: Fiber Optic OTDR Testing is addressed in ANSI/NETA ATS-2025.
- tests.fiber-optic-otdr-testing.governed-by.ansi-neta-mts: Fiber Optic OTDR Testing is addressed in ANSI/NETA MTS-2023.
- tests.fiber-optic-otdr-testing.title: The test method is named Fiber Optic OTDR Testing.Value: Fiber Optic OTDR Testing.
Field Pole Voltage Drop
- tests.field-pole-voltage-drop.equipment.motor.acceptance: Field Pole Voltage Drop is specified for synchronous motors and generators in acceptance testing at clause 7.15.2.B.15 of ANSI/NETA ATS-2025.Value: synchronous motors and generators.
- tests.field-pole-voltage-drop.equipment.motor.maintenance: Field Pole Voltage Drop is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.field-pole-voltage-drop.governed-by.ansi-neta-ats: Field Pole Voltage Drop is addressed in ANSI/NETA ATS-2025.
- tests.field-pole-voltage-drop.governed-by.ansi-neta-mts: Field Pole Voltage Drop is addressed in ANSI/NETA MTS-2023.
- tests.field-pole-voltage-drop.title: The test method is named Field Pole Voltage Drop.Value: Field Pole Voltage Drop.
Fuse Resistance
- tests.fuse-resistance.equipment.drive.acceptance: Fuse Resistance is specified for adjustable-speed drive systems in acceptance testing at clause 7.17.B.9 of ANSI/NETA ATS-2025.Value: adjustable-speed drive systems.
- tests.fuse-resistance.equipment.motor.acceptance: Fuse Resistance is specified for medium-voltage motor starters in acceptance testing at clause 7.16.1.2.B.8 of ANSI/NETA ATS-2025.Value: medium-voltage motor starters.
- tests.fuse-resistance.equipment.motor.maintenance: Fuse Resistance is specified for medium-voltage motor starters in maintenance testing at clause 7.16.1.2.B.9 of ANSI/NETA MTS-2023.Value: medium-voltage motor starters.
- tests.fuse-resistance.equipment.network-protector.acceptance: Fuse Resistance is specified for low-voltage network protectors in acceptance testing at clause 7.8.B.6 of ANSI/NETA ATS-2025.Value: low-voltage network protectors.
- tests.fuse-resistance.equipment.network-protector.maintenance: Fuse Resistance is specified for low-voltage network protectors in maintenance testing at clause 7.8.B.6 of ANSI/NETA MTS-2023.Value: low-voltage network protectors.
- tests.fuse-resistance.equipment.switch.acceptance: Fuse Resistance is specified for low-voltage air switches in acceptance testing at clause 7.5.1.1.B.4 of ANSI/NETA ATS-2025.Value: low-voltage air switches.
- tests.fuse-resistance.equipment.switch.maintenance: Fuse Resistance is specified for low-voltage air switches in maintenance testing at clause 7.5.1.1.B of ANSI/NETA MTS-2023.Value: low-voltage air switches.
- tests.fuse-resistance.governed-by.ansi-neta-ats: Fuse Resistance is addressed in ANSI/NETA ATS-2025.
- tests.fuse-resistance.governed-by.ansi-neta-mts: Fuse Resistance is addressed in ANSI/NETA MTS-2023.
- tests.fuse-resistance.title: The test method is named Fuse Resistance.Value: Fuse Resistance.
Gas Blanket Oxygen Content
- tests.gas-blanket-oxygen-content.equipment.reactor.acceptance: Gas Blanket Oxygen Content is specified for liquid-filled shunt and current-limiting reactors in acceptance testing at clause 7.20.3.2.B.6 of ANSI/NETA ATS-2025.Value: liquid-filled shunt and current-limiting reactors.
- tests.gas-blanket-oxygen-content.equipment.reactor.maintenance: Gas Blanket Oxygen Content is specified for liquid-filled shunt and current-limiting reactors in maintenance testing at clause 7.20.3.2.B of ANSI/NETA MTS-2023.Value: liquid-filled shunt and current-limiting reactors.
- tests.gas-blanket-oxygen-content.equipment.regulator.acceptance: Gas Blanket Oxygen Content is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.9 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.gas-blanket-oxygen-content.equipment.regulator.maintenance: Gas Blanket Oxygen Content is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.7 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.gas-blanket-oxygen-content.equipment.transformer-fluid.acceptance: Gas Blanket Oxygen Content is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.12 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.gas-blanket-oxygen-content.equipment.transformer-fluid.maintenance: Gas Blanket Oxygen Content is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.12 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.gas-blanket-oxygen-content.governed-by.ansi-neta-ats: Gas Blanket Oxygen Content is addressed in ANSI/NETA ATS-2025.
- tests.gas-blanket-oxygen-content.governed-by.ansi-neta-mts: Gas Blanket Oxygen Content is addressed in ANSI/NETA MTS-2023.
- tests.gas-blanket-oxygen-content.title: The test method is named Gas Blanket Oxygen Content.Value: Gas Blanket Oxygen Content.
Ground Electrode Resistance
- tests.ground-electrode-resistance.equipment.ground.acceptance: Ground Electrode Resistance is specified for grounding systems in acceptance testing at clause 7.13.B.2 of ANSI/NETA ATS-2025.Value: grounding systems.
- tests.ground-electrode-resistance.equipment.ground.maintenance: Ground Electrode Resistance is specified for grounding systems in maintenance testing at clause 7.13.B of ANSI/NETA MTS-2023.Value: grounding systems.
- tests.ground-electrode-resistance.equipment.solar.acceptance: Ground Electrode Resistance is specified for solar photovoltaic systems in acceptance testing at clause 7.29.B.9 of ANSI/NETA ATS-2025.Value: solar photovoltaic systems.
- tests.ground-electrode-resistance.equipment.surge.acceptance: Ground Electrode Resistance is specified for low-voltage surge protective devices in acceptance testing at clause 7.19.1.B.2 of ANSI/NETA ATS-2025.Value: low-voltage surge protective devices.
- tests.ground-electrode-resistance.equipment.surge.maintenance: Ground Electrode Resistance is specified for low-voltage surge protective devices in maintenance testing at clause 7.19.1.B.3 of ANSI/NETA MTS-2023.Value: low-voltage surge protective devices.
- tests.ground-electrode-resistance.equipment.switchgear.acceptance: Ground Electrode Resistance is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.6 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.ground-electrode-resistance.governed-by.ansi-neta-ats: Ground Electrode Resistance is addressed in ANSI/NETA ATS-2025.
- tests.ground-electrode-resistance.governed-by.ansi-neta-mts: Ground Electrode Resistance is addressed in ANSI/NETA MTS-2023.
- tests.ground-electrode-resistance.title: The test method is named Ground Electrode Resistance.Value: Ground Electrode Resistance.
Ground Fault Protection Performance
- tests.ground-fault-protection-performance.equipment.breaker.acceptance: Ground Fault Protection Performance is specified for low-voltage molded-case circuit breakers in acceptance testing at clause 7.6.1.1.1.B.5 of ANSI/NETA ATS-2025.Value: low-voltage molded-case circuit breakers.
- tests.ground-fault-protection-performance.equipment.breaker.maintenance: Ground Fault Protection Performance is specified for low-voltage power circuit breakers in maintenance testing at clause 7.6.1.2.B.7 of ANSI/NETA MTS-2023.Value: low-voltage power circuit breakers.
- tests.ground-fault-protection-performance.equipment.relay.acceptance: Ground Fault Protection Performance is specified for low-voltage ground-fault protection systems in acceptance testing at clause 7.14.B.4 of ANSI/NETA ATS-2025.Value: low-voltage ground-fault protection systems.
- tests.ground-fault-protection-performance.equipment.relay.maintenance: Ground Fault Protection Performance is specified for low-voltage ground-fault protection systems in maintenance testing at clause 7.14.B of ANSI/NETA MTS-2023.Value: low-voltage ground-fault protection systems.
- tests.ground-fault-protection-performance.equipment.switch.acceptance: Ground Fault Protection Performance is specified for low-voltage air switches in acceptance testing at clause 7.5.1.1.B.6 of ANSI/NETA ATS-2025.Value: low-voltage air switches.
- tests.ground-fault-protection-performance.equipment.switch.maintenance: Ground Fault Protection Performance is specified for low-voltage air switches in maintenance testing at clause 7.5.1.1.B of ANSI/NETA MTS-2023.Value: low-voltage air switches.
- tests.ground-fault-protection-performance.governed-by.ansi-neta-ats: Ground Fault Protection Performance is addressed in ANSI/NETA ATS-2025.
- tests.ground-fault-protection-performance.governed-by.ansi-neta-mts: Ground Fault Protection Performance is addressed in ANSI/NETA MTS-2023.
- tests.ground-fault-protection-performance.title: The test method is named Ground Fault Protection Performance.Value: Ground Fault Protection Performance.
Grounding Point to Point Continuity
- tests.grounding-point-to-point-continuity.equipment.drive.acceptance: Grounding Point to Point Continuity is specified for adjustable-speed drive systems in acceptance testing at clause 7.17.B.6 of ANSI/NETA ATS-2025.Value: adjustable-speed drive systems.
- tests.grounding-point-to-point-continuity.equipment.drive.maintenance: Grounding Point to Point Continuity is specified for adjustable-speed drive systems in maintenance testing at clause 7.17.B.6 of ANSI/NETA MTS-2023.Value: adjustable-speed drive systems.
- tests.grounding-point-to-point-continuity.equipment.ground.acceptance: Grounding Point to Point Continuity is specified for grounding systems in acceptance testing at clause 7.13.B.3 of ANSI/NETA ATS-2025.Value: grounding systems.
- tests.grounding-point-to-point-continuity.equipment.ground.maintenance: Grounding Point to Point Continuity is specified for grounding systems in maintenance testing at clause 7.13.B of ANSI/NETA MTS-2023.Value: grounding systems.
- tests.grounding-point-to-point-continuity.governed-by.ansi-neta-ats: Grounding Point to Point Continuity is addressed in ANSI/NETA ATS-2025.
- tests.grounding-point-to-point-continuity.governed-by.ansi-neta-mts: Grounding Point to Point Continuity is addressed in ANSI/NETA MTS-2023.
- tests.grounding-point-to-point-continuity.title: The test method is named Grounding Point to Point Continuity.Value: Grounding Point to Point Continuity.
Infrared Thermographic Survey
- tests.infrared-thermographic-survey.equipment.thermographic.acceptance: Infrared Thermographic Survey is specified for equipment surveyed by infrared thermography in acceptance testing at clause 9 of ANSI/NETA ATS-2025.Value: equipment surveyed by infrared thermography.
- tests.infrared-thermographic-survey.equipment.thermographic.commissioning: Infrared Thermographic Survey is specified for equipment surveyed by infrared thermography in commissioning testing at clause 9 of ANSI/NETA ECS-2024.Value: equipment surveyed by infrared thermography.
- tests.infrared-thermographic-survey.governed-by.ansi-neta-ats: Infrared Thermographic Survey is addressed in ANSI/NETA ATS-2025.
- tests.infrared-thermographic-survey.governed-by.ansi-neta-ecs: Infrared Thermographic Survey is addressed in ANSI/NETA ECS-2024.
- tests.infrared-thermographic-survey.title: The test method is named Infrared Thermographic Survey.Value: Infrared Thermographic Survey.
Instrument Transformer Burden
- tests.instrument-transformer-burden.equipment.instrument.acceptance: Instrument Transformer Burden is specified for current transformers in acceptance testing at clause 7.10.1.B.5 of ANSI/NETA ATS-2025.Value: current transformers.
- tests.instrument-transformer-burden.equipment.instrument.maintenance: Instrument Transformer Burden is specified for current transformers in maintenance testing at clause 7.10.1.B.6 of ANSI/NETA MTS-2023.Value: current transformers.
- tests.instrument-transformer-burden.governed-by.ansi-neta-ats: Instrument Transformer Burden is addressed in ANSI/NETA ATS-2025.
- tests.instrument-transformer-burden.governed-by.ansi-neta-mts: Instrument Transformer Burden is addressed in ANSI/NETA MTS-2023.
- tests.instrument-transformer-burden.governed-by.ieee-c57-13: Instrument Transformer Burden is addressed in IEEE C57.13-2016.
- tests.instrument-transformer-burden.governed-by.ieee-c57-13-1: Instrument Transformer Burden is addressed in IEEE C57.13.1-2017.
- tests.instrument-transformer-burden.title: The test method is named Instrument Transformer Burden.Value: Instrument Transformer Burden.
Instrument Transformer Ratio and Phase Angle
- tests.instrument-transformer-ratio-and-phase-angle.equipment.instrument.acceptance: Instrument Transformer Ratio and Phase Angle is specified for current transformers in acceptance testing at clause 7.10.1.B.3 of ANSI/NETA ATS-2025.Value: current transformers.
- tests.instrument-transformer-ratio-and-phase-angle.equipment.instrument.maintenance: Instrument Transformer Ratio and Phase Angle is specified for current transformers in maintenance testing at clause 7.10.1.B.4 of ANSI/NETA MTS-2023.Value: current transformers.
- tests.instrument-transformer-ratio-and-phase-angle.equipment.network-protector.acceptance: Instrument Transformer Ratio and Phase Angle is specified for low-voltage network protectors in acceptance testing at clause 7.8.B.5 of ANSI/NETA ATS-2025.Value: low-voltage network protectors.
- tests.instrument-transformer-ratio-and-phase-angle.equipment.network-protector.maintenance: Instrument Transformer Ratio and Phase Angle is specified for low-voltage network protectors in maintenance testing at clause 7.8.B.5 of ANSI/NETA MTS-2023.Value: low-voltage network protectors.
- tests.instrument-transformer-ratio-and-phase-angle.governed-by.ansi-neta-ats: Instrument Transformer Ratio and Phase Angle is addressed in ANSI/NETA ATS-2025.
- tests.instrument-transformer-ratio-and-phase-angle.governed-by.ansi-neta-mts: Instrument Transformer Ratio and Phase Angle is addressed in ANSI/NETA MTS-2023.
- tests.instrument-transformer-ratio-and-phase-angle.governed-by.ieee-c57-13: Instrument Transformer Ratio and Phase Angle is addressed in IEEE C57.13-2016.
- tests.instrument-transformer-ratio-and-phase-angle.governed-by.ieee-c57-13-1: Instrument Transformer Ratio and Phase Angle is addressed in IEEE C57.13.1-2017.
- tests.instrument-transformer-ratio-and-phase-angle.governed-by.ieee-c57-13-6: Instrument Transformer Ratio and Phase Angle is addressed in IEEE C57.13.6-2005.
- tests.instrument-transformer-ratio-and-phase-angle.title: The test method is named Instrument Transformer Ratio and Phase Angle.Value: Instrument Transformer Ratio and Phase Angle.
Instrument Transformer Secondary Grounding
- tests.instrument-transformer-secondary-grounding.equipment.instrument.acceptance: Instrument Transformer Secondary Grounding is specified for current transformers in acceptance testing at clause 7.10.1.B.9 of ANSI/NETA ATS-2025.Value: current transformers.
- tests.instrument-transformer-secondary-grounding.equipment.instrument.maintenance: Instrument Transformer Secondary Grounding is specified for current transformers in maintenance testing at clause 7.10.1.B.10 of ANSI/NETA MTS-2023.Value: current transformers.
- tests.instrument-transformer-secondary-grounding.equipment.surge.acceptance: Instrument Transformer Secondary Grounding is specified for medium-voltage and high-voltage surge arresters in acceptance testing at clause 7.19.2.B.3 of ANSI/NETA ATS-2025.Value: medium-voltage and high-voltage surge arresters.
- tests.instrument-transformer-secondary-grounding.equipment.surge.maintenance: Instrument Transformer Secondary Grounding is specified for medium-voltage and high-voltage surge arresters in maintenance testing at clause 7.19.2.B of ANSI/NETA MTS-2023.Value: medium-voltage and high-voltage surge arresters.
- tests.instrument-transformer-secondary-grounding.governed-by.ansi-neta-ats: Instrument Transformer Secondary Grounding is addressed in ANSI/NETA ATS-2025.
- tests.instrument-transformer-secondary-grounding.governed-by.ansi-neta-mts: Instrument Transformer Secondary Grounding is addressed in ANSI/NETA MTS-2023.
- tests.instrument-transformer-secondary-grounding.title: The test method is named Instrument Transformer Secondary Grounding.Value: Instrument Transformer Secondary Grounding.
Insulated Bearing Insulation Resistance
- tests.insulated-bearing-insulation-resistance.equipment.motor.acceptance: Insulated Bearing Insulation Resistance is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.8 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.insulated-bearing-insulation-resistance.equipment.motor.maintenance: Insulated Bearing Insulation Resistance is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.insulated-bearing-insulation-resistance.governed-by.ansi-neta-ats: Insulated Bearing Insulation Resistance is addressed in ANSI/NETA ATS-2025.
- tests.insulated-bearing-insulation-resistance.governed-by.ansi-neta-mts: Insulated Bearing Insulation Resistance is addressed in ANSI/NETA MTS-2023.
- tests.insulated-bearing-insulation-resistance.title: The test method is named Insulated Bearing Insulation Resistance.Value: Insulated Bearing Insulation Resistance.
Insulating Liquid Acid Number
- tests.insulating-liquid-acid-number.title: The test method is named Insulating Liquid Acid Number.Value: Insulating Liquid Acid Number.
Insulating Liquid Color
- tests.insulating-liquid-color.title: The test method is named Insulating Liquid Color.Value: Insulating Liquid Color.
Insulating Liquid Dielectric Breakdown
- tests.insulating-liquid-dielectric-breakdown.governed-by.ansi-neta-ats: Insulating Liquid Dielectric Breakdown is addressed in ANSI/NETA ATS-2025.
- tests.insulating-liquid-dielectric-breakdown.title: The test method is named Insulating Liquid Dielectric Breakdown.Value: Insulating Liquid Dielectric Breakdown.
Insulating Liquid Interfacial Tension
- tests.insulating-liquid-interfacial-tension.title: The test method is named Insulating Liquid Interfacial Tension.Value: Insulating Liquid Interfacial Tension.
Insulating Liquid Power Factor
- tests.insulating-liquid-power-factor.title: The test method is named Insulating Liquid Power Factor.Value: Insulating Liquid Power Factor.
Insulating Liquid Quality Tests
- tests.insulating-liquid-quality-tests.equipment.breaker.acceptance: Insulating Liquid Quality Tests is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.5 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.insulating-liquid-quality-tests.equipment.breaker.maintenance: Insulating Liquid Quality Tests is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.B.5 of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.insulating-liquid-quality-tests.equipment.reactor.acceptance: Insulating Liquid Quality Tests is specified for liquid-filled shunt and current-limiting reactors in acceptance testing at clause 7.20.3.2.B.7 of ANSI/NETA ATS-2025.Value: liquid-filled shunt and current-limiting reactors.
- tests.insulating-liquid-quality-tests.equipment.reactor.maintenance: Insulating Liquid Quality Tests is specified for liquid-filled shunt and current-limiting reactors in maintenance testing at clause 7.20.3.2.B of ANSI/NETA MTS-2023.Value: liquid-filled shunt and current-limiting reactors.
- tests.insulating-liquid-quality-tests.equipment.regulator.acceptance: Insulating Liquid Quality Tests is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.14 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.insulating-liquid-quality-tests.equipment.regulator.maintenance: Insulating Liquid Quality Tests is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.12 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.insulating-liquid-quality-tests.equipment.sectionalizer.acceptance: Insulating Liquid Quality Tests is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.4 of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.insulating-liquid-quality-tests.equipment.sectionalizer.maintenance: Insulating Liquid Quality Tests is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.4 of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.insulating-liquid-quality-tests.equipment.switch.acceptance: Insulating Liquid Quality Tests is specified for medium-voltage oil switches in acceptance testing at clause 7.5.2.B.6 of ANSI/NETA ATS-2025.Value: medium-voltage oil switches.
- tests.insulating-liquid-quality-tests.equipment.switch.maintenance: Insulating Liquid Quality Tests is specified for medium-voltage oil switches in maintenance testing at clause 7.5.2.B of ANSI/NETA MTS-2023.Value: medium-voltage oil switches.
- tests.insulating-liquid-quality-tests.equipment.transformer-fluid.acceptance: Insulating Liquid Quality Tests is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.14 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.insulating-liquid-quality-tests.equipment.transformer-fluid.maintenance: Insulating Liquid Quality Tests is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.14 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.insulating-liquid-quality-tests.governed-by.ansi-neta-ats: Insulating Liquid Quality Tests is addressed in ANSI/NETA ATS-2025.
- tests.insulating-liquid-quality-tests.governed-by.ansi-neta-mts: Insulating Liquid Quality Tests is addressed in ANSI/NETA MTS-2023.
- tests.insulating-liquid-quality-tests.title: The test method is named Insulating Liquid Quality Tests.Value: Insulating Liquid Quality Tests.
Insulating Liquid Sampling
- tests.insulating-liquid-sampling.equipment.breaker.acceptance: Insulating Liquid Sampling is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.5 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.insulating-liquid-sampling.equipment.breaker.maintenance: Insulating Liquid Sampling is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.B.5 of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.insulating-liquid-sampling.equipment.reactor.acceptance: Insulating Liquid Sampling is specified for liquid-filled shunt and current-limiting reactors in acceptance testing at clause 7.20.3.2.B.7 of ANSI/NETA ATS-2025.Value: liquid-filled shunt and current-limiting reactors.
- tests.insulating-liquid-sampling.equipment.reactor.maintenance: Insulating Liquid Sampling is specified for liquid-filled shunt and current-limiting reactors in maintenance testing at clause 7.20.3.2.B of ANSI/NETA MTS-2023.Value: liquid-filled shunt and current-limiting reactors.
- tests.insulating-liquid-sampling.equipment.regulator.acceptance: Insulating Liquid Sampling is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.13 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.insulating-liquid-sampling.equipment.regulator.maintenance: Insulating Liquid Sampling is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.11 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.insulating-liquid-sampling.equipment.sectionalizer.acceptance: Insulating Liquid Sampling is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.4 of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.insulating-liquid-sampling.equipment.sectionalizer.maintenance: Insulating Liquid Sampling is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.4 of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.insulating-liquid-sampling.equipment.switch.acceptance: Insulating Liquid Sampling is specified for medium-voltage oil switches in acceptance testing at clause 7.5.2.B.6 of ANSI/NETA ATS-2025.Value: medium-voltage oil switches.
- tests.insulating-liquid-sampling.equipment.switch.maintenance: Insulating Liquid Sampling is specified for medium-voltage oil switches in maintenance testing at clause 7.5.2.B of ANSI/NETA MTS-2023.Value: medium-voltage oil switches.
- tests.insulating-liquid-sampling.equipment.transformer-fluid.acceptance: Insulating Liquid Sampling is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.14 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.insulating-liquid-sampling.equipment.transformer-fluid.maintenance: Insulating Liquid Sampling is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.14 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.insulating-liquid-sampling.governed-by.ansi-neta-ats: Insulating Liquid Sampling is addressed in ANSI/NETA ATS-2025.
- tests.insulating-liquid-sampling.governed-by.ansi-neta-mts: Insulating Liquid Sampling is addressed in ANSI/NETA MTS-2023.
- tests.insulating-liquid-sampling.title: The test method is named Insulating Liquid Sampling.Value: Insulating Liquid Sampling.
Insulating Liquid Visual Examination
- tests.insulating-liquid-visual-examination.title: The test method is named Insulating Liquid Visual Examination.Value: Insulating Liquid Visual Examination.
Insulating Liquid Water Content
- tests.insulating-liquid-water-content.title: The test method is named Insulating Liquid Water Content.Value: Insulating Liquid Water Content.
Insulation Power Factor Dissipation Factor
- tests.insulation-power-factor-dissipation-factor.equipment.breaker.acceptance: Insulation Power Factor Dissipation Factor is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.7 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.insulation-power-factor-dissipation-factor.equipment.breaker.maintenance: Insulation Power Factor Dissipation Factor is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.B.7 of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.insulation-power-factor-dissipation-factor.equipment.busway.acceptance: Insulation Power Factor Dissipation Factor is specified for outdoor bus structures in acceptance testing at clause 7.21.B.4 of ANSI/NETA ATS-2025.Value: outdoor bus structures.
- tests.insulation-power-factor-dissipation-factor.equipment.busway.maintenance: Insulation Power Factor Dissipation Factor is specified for outdoor bus structures in maintenance testing at clause 7.21.B.4 of ANSI/NETA MTS-2023.Value: outdoor bus structures.
- tests.insulation-power-factor-dissipation-factor.equipment.instrument.acceptance: Insulation Power Factor Dissipation Factor is specified for current transformers in acceptance testing at clause 7.10.1.B.8 of ANSI/NETA ATS-2025.Value: current transformers.
- tests.insulation-power-factor-dissipation-factor.equipment.instrument.maintenance: Insulation Power Factor Dissipation Factor is specified for current transformers in maintenance testing at clause 7.10.1.B.9 of ANSI/NETA MTS-2023.Value: current transformers.
- tests.insulation-power-factor-dissipation-factor.equipment.motor.acceptance: Insulation Power Factor Dissipation Factor is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.5 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.insulation-power-factor-dissipation-factor.equipment.motor.maintenance: Insulation Power Factor Dissipation Factor is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.insulation-power-factor-dissipation-factor.equipment.reactor.acceptance: Insulation Power Factor Dissipation Factor is specified for dry-type shunt and current-limiting reactors in acceptance testing at clause 7.20.3.1.B.5 of ANSI/NETA ATS-2025.Value: dry-type shunt and current-limiting reactors.
- tests.insulation-power-factor-dissipation-factor.equipment.reactor.maintenance: Insulation Power Factor Dissipation Factor is specified for liquid-filled shunt and current-limiting reactors in maintenance testing at clause 7.20.3.2.B of ANSI/NETA MTS-2023.Value: liquid-filled shunt and current-limiting reactors.
- tests.insulation-power-factor-dissipation-factor.equipment.regulator.acceptance: Insulation Power Factor Dissipation Factor is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.3 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.insulation-power-factor-dissipation-factor.equipment.regulator.maintenance: Insulation Power Factor Dissipation Factor is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.3 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.insulation-power-factor-dissipation-factor.equipment.sectionalizer.acceptance: Insulation Power Factor Dissipation Factor is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.9 of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.insulation-power-factor-dissipation-factor.equipment.sectionalizer.maintenance: Insulation Power Factor Dissipation Factor is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.9 of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.insulation-power-factor-dissipation-factor.equipment.switch.acceptance: Insulation Power Factor Dissipation Factor is specified for open medium-voltage and high-voltage air switches in acceptance testing at clause 7.5.1.3.B.7 of ANSI/NETA ATS-2025.Value: open medium-voltage and high-voltage air switches.
- tests.insulation-power-factor-dissipation-factor.equipment.transformer-fluid.acceptance: Insulation Power Factor Dissipation Factor is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.4 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.insulation-power-factor-dissipation-factor.equipment.transformer-fluid.maintenance: Insulation Power Factor Dissipation Factor is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.4 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.insulation-power-factor-dissipation-factor.equipment.transformer.acceptance: Insulation Power Factor Dissipation Factor is specified for large air-cooled dry-type transformers in acceptance testing at clause 7.2.1.2.B.3 of ANSI/NETA ATS-2025.Value: large air-cooled dry-type transformers.
- tests.insulation-power-factor-dissipation-factor.equipment.transformer.maintenance: Insulation Power Factor Dissipation Factor is specified for large air-cooled dry-type transformers in maintenance testing at clause 7.2.1.2.B.3 of ANSI/NETA MTS-2023.Value: large air-cooled dry-type transformers.
- tests.insulation-power-factor-dissipation-factor.governed-by.ansi-neta-ats: Insulation Power Factor Dissipation Factor is addressed in ANSI/NETA ATS-2025.
- tests.insulation-power-factor-dissipation-factor.governed-by.ansi-neta-mts: Insulation Power Factor Dissipation Factor is addressed in ANSI/NETA MTS-2023.
- tests.insulation-power-factor-dissipation-factor.title: The test method is named Insulation Power Factor Dissipation Factor.Value: Insulation Power Factor Dissipation Factor.
Insulation Resistance
- tests.insulation-resistance.ats-conversion: ANSI/NETA ATS-2025 Table 100.14 provides insulation resistance conversion factors for referring readings to a standard temperature.
- tests.insulation-resistance.ats-table-general: ANSI/NETA ATS-2025 Table 100.1 gives insulation resistance test values for electrical apparatus and systems other than rotating machinery.
- tests.insulation-resistance.ats-table-rotating: ANSI/NETA ATS-2025 Table 100.11 gives insulation resistance test values for rotating machinery, stated for a one-minute reading at a reference temperature.
- tests.insulation-resistance.ats-table-transformer: ANSI/NETA ATS-2025 Table 100.5 addresses transformer insulation resistance in acceptance testing.
- tests.insulation-resistance.constant-dc: IEEE 43-2013 describes the test as normally made at a constant direct voltage of negative polarity, a choice it links to the electroendosmosis effect.
- tests.insulation-resistance.definition: IEEE 43-2013 treats insulation resistance as the quotient of a direct voltage applied across the insulation and the current that the voltage drives through it, read at a stated time after the voltage is applied.
- tests.insulation-resistance.dew-point: IEEE 43-2013 notes that when a winding is at or below the dew point a film of moisture can form on it and lower both the insulation resistance and the polarization index.
- tests.insulation-resistance.discharge: IEEE 43-2013 requires the winding to be discharged before the test and, afterward, grounded through a current-limiting resistor for a period that it relates to how long the voltage was applied.
- tests.insulation-resistance.discharge-practice: IEEE 43-2013 calls for the winding to be discharged before the test and, afterward, grounded through a current-limiting resistor for a period that it relates to how long the voltage was applied.
- tests.insulation-resistance.equipment.ats-transfer.acceptance: Insulation Resistance is specified for automatic transfer switches in emergency systems in acceptance testing at clause 7.22.3.B.2 of ANSI/NETA ATS-2025.Value: automatic transfer switches in emergency systems.
- tests.insulation-resistance.equipment.ats-transfer.maintenance: Insulation Resistance is specified for automatic transfer switches in emergency systems in maintenance testing at clause 7.22.3.B.2 of ANSI/NETA MTS-2023.Value: automatic transfer switches in emergency systems.
- tests.insulation-resistance.equipment.breaker.acceptance: Insulation Resistance is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.2 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.insulation-resistance.equipment.breaker.maintenance: Insulation Resistance is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.B.2 of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.insulation-resistance.equipment.busway.acceptance: Insulation Resistance is specified for outdoor bus structures in acceptance testing at clause 7.21.B.2 of ANSI/NETA ATS-2025.Value: outdoor bus structures.
- tests.insulation-resistance.equipment.busway.maintenance: Insulation Resistance is specified for outdoor bus structures in maintenance testing at clause 7.21.B.2 of ANSI/NETA MTS-2023.Value: outdoor bus structures.
- tests.insulation-resistance.equipment.cable.acceptance: Insulation Resistance is specified for low-voltage cables in acceptance testing at clause 7.3.2.B.1 of ANSI/NETA ATS-2025.Value: low-voltage cables.
- tests.insulation-resistance.equipment.cable.maintenance: Insulation Resistance is specified for low-voltage cables in maintenance testing at clause 7.3.2.B of ANSI/NETA MTS-2023.Value: low-voltage cables.
- tests.insulation-resistance.equipment.capacitor.acceptance: Insulation Resistance is specified for capacitors in acceptance testing at clause 7.20.1.B.2 of ANSI/NETA ATS-2025.Value: capacitors.
- tests.insulation-resistance.equipment.capacitor.maintenance: Insulation Resistance is specified for capacitors in maintenance testing at clause 7.20.1.B.2 of ANSI/NETA MTS-2023.Value: capacitors.
- tests.insulation-resistance.equipment.drive.acceptance: Insulation Resistance is specified for adjustable-speed drive systems in acceptance testing at clause 7.17.B.4 of ANSI/NETA ATS-2025.Value: adjustable-speed drive systems.
- tests.insulation-resistance.equipment.drive.maintenance: Insulation Resistance is specified for adjustable-speed drive systems in maintenance testing at clause 7.17.B.4 of ANSI/NETA MTS-2023.Value: adjustable-speed drive systems.
- tests.insulation-resistance.equipment.generator.acceptance: Insulation Resistance is specified for engine-generator emergency systems in acceptance testing at clause 7.22.1.B.1 of ANSI/NETA ATS-2025.Value: engine-generator emergency systems.
- tests.insulation-resistance.equipment.generator.maintenance: Insulation Resistance is specified for engine-generator emergency systems in maintenance testing at clause 7.22.1.B.1 of ANSI/NETA MTS-2023.Value: engine-generator emergency systems.
- tests.insulation-resistance.equipment.instrument.acceptance: Insulation Resistance is specified for current transformers in acceptance testing at clause 7.10.1.B.1 of ANSI/NETA ATS-2025.Value: current transformers.
- tests.insulation-resistance.equipment.instrument.maintenance: Insulation Resistance is specified for current transformers in maintenance testing at clause 7.10.1.B.2 of ANSI/NETA MTS-2023.Value: current transformers.
- tests.insulation-resistance.equipment.motor.acceptance: Insulation Resistance is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.2 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.insulation-resistance.equipment.motor.maintenance: Insulation Resistance is specified for AC induction motors and generators in maintenance testing at clause 7.15.1.B.2 of ANSI/NETA MTS-2023.Value: AC induction motors and generators.
- tests.insulation-resistance.equipment.network-protector.acceptance: Insulation Resistance is specified for low-voltage network protectors in acceptance testing at clause 7.8.B.2 of ANSI/NETA ATS-2025.Value: low-voltage network protectors.
- tests.insulation-resistance.equipment.network-protector.maintenance: Insulation Resistance is specified for low-voltage network protectors in maintenance testing at clause 7.8.B.2 of ANSI/NETA MTS-2023.Value: low-voltage network protectors.
- tests.insulation-resistance.equipment.reactor.acceptance: Insulation Resistance is specified for dry-type shunt and current-limiting reactors in acceptance testing at clause 7.20.3.1.B.2 of ANSI/NETA ATS-2025.Value: dry-type shunt and current-limiting reactors.
- tests.insulation-resistance.equipment.reactor.maintenance: Insulation Resistance is specified for dry-type shunt and current-limiting reactors in maintenance testing at clause 7.20.3.1.B.2 of ANSI/NETA MTS-2023.Value: dry-type shunt and current-limiting reactors.
- tests.insulation-resistance.equipment.regulator.acceptance: Insulation Resistance is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.2 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.insulation-resistance.equipment.regulator.maintenance: Insulation Resistance is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.2 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.insulation-resistance.equipment.relay.acceptance: Insulation Resistance is specified for low-voltage ground-fault protection systems in acceptance testing at clause 7.14.B.2 of ANSI/NETA ATS-2025.Value: low-voltage ground-fault protection systems.
- tests.insulation-resistance.equipment.relay.maintenance: Insulation Resistance is specified for low-voltage ground-fault protection systems in maintenance testing at clause 7.14.B of ANSI/NETA MTS-2023.Value: low-voltage ground-fault protection systems.
- tests.insulation-resistance.equipment.resistor.acceptance: Insulation Resistance is specified for resistors in acceptance testing at clause 7.20.4.B.2 of ANSI/NETA ATS-2025.Value: resistors.
- tests.insulation-resistance.equipment.resistor.maintenance: Insulation Resistance is specified for resistors in maintenance testing at clause 7.20.4.B.2 of ANSI/NETA MTS-2023.Value: resistors.
- tests.insulation-resistance.equipment.sectionalizer.acceptance: Insulation Resistance is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.2 of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.insulation-resistance.equipment.sectionalizer.maintenance: Insulation Resistance is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.2 of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.insulation-resistance.equipment.solar.acceptance: Insulation Resistance is specified for solar photovoltaic systems in acceptance testing at clause 7.29.B.3 of ANSI/NETA ATS-2025.Value: solar photovoltaic systems.
- tests.insulation-resistance.equipment.surge.acceptance: Insulation Resistance is specified for medium-voltage and high-voltage surge arresters in acceptance testing at clause 7.19.2.B.2 of ANSI/NETA ATS-2025.Value: medium-voltage and high-voltage surge arresters.
- tests.insulation-resistance.equipment.surge.maintenance: Insulation Resistance is specified for low-voltage surge protective devices in maintenance testing at clause 7.19.1.B.2 of ANSI/NETA MTS-2023.Value: low-voltage surge protective devices.
- tests.insulation-resistance.equipment.switch.acceptance: Insulation Resistance is specified for low-voltage air switches in acceptance testing at clause 7.5.1.1.B.3 of ANSI/NETA ATS-2025.Value: low-voltage air switches.
- tests.insulation-resistance.equipment.switch.maintenance: Insulation Resistance is specified for low-voltage air switches in maintenance testing at clause 7.5.1.1.B of ANSI/NETA MTS-2023.Value: low-voltage air switches.
- tests.insulation-resistance.equipment.switchgear.acceptance: Insulation Resistance is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.2 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.insulation-resistance.equipment.transformer-fluid.acceptance: Insulation Resistance is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.2 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.insulation-resistance.equipment.transformer-fluid.maintenance: Insulation Resistance is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.2 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.insulation-resistance.equipment.transformer.acceptance: Insulation Resistance is specified for small low-voltage air-cooled dry-type transformers in acceptance testing at clause 7.2.1.1.B.2 of ANSI/NETA ATS-2025.Value: small low-voltage air-cooled dry-type transformers.
- tests.insulation-resistance.equipment.transformer.maintenance: Insulation Resistance is specified for small low-voltage air-cooled dry-type transformers in maintenance testing at clause 7.2.1.1.B.2 of ANSI/NETA MTS-2023.Value: small low-voltage air-cooled dry-type transformers.
- tests.insulation-resistance.external-equipment: IEEE 43-2013 has cables, surge arresters, capacitors, voltage transformers and similar external equipment disconnected from the winding and grounded before the test, with any item left connected noted in the record.
- tests.insulation-resistance.governed-by.ansi-neta-ats: Insulation Resistance is addressed in ANSI/NETA ATS-2025.
- tests.insulation-resistance.governed-by.ansi-neta-mts: Insulation Resistance is addressed in ANSI/NETA MTS-2023.
- tests.insulation-resistance.governed-by.ieee-43: Insulation Resistance is addressed in IEEE 43-2013.
- tests.insulation-resistance.governed-by.ieee-c57-13-1: Insulation Resistance is addressed in IEEE C57.13.1-2017.
- tests.insulation-resistance.governed-by.ieee-c57-15: Insulation Resistance is addressed in IEEE/IEC C57.15-2017.
- tests.insulation-resistance.governed-by.ieee-c57-18-10: Insulation Resistance is addressed in IEEE C57.18.10-2021.
- tests.insulation-resistance.limitations: IEEE 43-2013 notes that insulation resistance does not measure dielectric strength and that a test at standstill can miss internal voids and looseness that only rotation reveals.
- tests.insulation-resistance.megohm-unit: IEEE 43-2013 expresses insulation resistance in megohms.
- tests.insulation-resistance.minimum-values-shape: Clause 12.3 of IEEE 43-2013 recommends minimum one-minute insulation resistance values that depend on the type and construction of the winding and apply to the whole winding after correction to the reference temperature.
- tests.insulation-resistance.mts-tables: ANSI/NETA MTS-2023 carries maintenance counterparts of the acceptance tables, including Table 100.1 for apparatus other than rotating machinery and Table 100.5 for transformer insulation resistance in maintenance testing.
- tests.insulation-resistance.one-minute-reading: Under IEEE 43-2013 the reference insulation resistance reading is the one taken when the test voltage has been applied for one minute.Value: 1 min.
- tests.insulation-resistance.osha-deenergize: Under 29 CFR 1910.333(a)(1), live parts to which an employee may be exposed are to be deenergized before the employee works on or near them, unless the employer shows that deenergizing creates added hazards or is infeasible.
- tests.insulation-resistance.osha-insulated: 29 CFR 1910.399 defines insulated as separated from other conducting surfaces by a dielectric, including an air space, that offers a high resistance to the passage of current.
- tests.insulation-resistance.osha-verify: Under 29 CFR 1910.333(b)(2)(iv)(B), a qualified person uses test equipment to verify that the circuit elements and electrical parts to be worked on are deenergized before they are treated as such.
- tests.insulation-resistance.phase-connection: Where the winding allows it, IEEE 43-2013 favors testing each phase on its own with the other phases grounded to the core, and notes that a test of all phases together examines only the insulation to ground.
- tests.insulation-resistance.purpose-ieee43: IEEE 43-2013 states that it sets out to define the insulation resistance and polarization index tests, identify the factors that change the readings, recommend uniform test conditions and give a basis for interpreting the results.
- tests.insulation-resistance.records: IEEE 43-2013 lists what is recorded with each test, among them the winding temperature, the temperature, humidity and dew point of the surrounding air, how long the machine has been out of service, the voltage applied and how the winding was connected.
- tests.insulation-resistance.scope-machines: IEEE 43-2013 covers the armature and field windings of rotating machines, among them synchronous machines, induction machines, direct-current machines and synchronous condensers, and leaves fractional-horsepower machines out of its scope.
- tests.insulation-resistance.small-current: IEEE 43-2013 notes that in insulation with a very high resistance the measured current is below a microampere.
- tests.insulation-resistance.surface-moisture: Surface contamination, and insulating materials that take up moisture, lower the insulation resistance, and IEEE 43-2013 notes that cleaning and drying can bring it back up.
- tests.insulation-resistance.temperature: Insulation resistance varies strongly with winding temperature, and IEEE 43-2013 gives a method for referring readings taken at different temperatures to one reference temperature.
- tests.insulation-resistance.test-voltage-selection: IEEE 43-2013 ties the recommended direct test voltage to the rated voltage of the winding being tested.
- tests.insulation-resistance.title: The test method is named Insulation Resistance.Value: Insulation Resistance.
- tests.insulation-resistance.trend-indicators: IEEE 43-2013 reads a sharp fall in insulation resistance between successive tests as a sign of contamination, absorbed moisture or cracked insulation.
- tests.insulation-resistance.trending-conditions: IEEE 43-2013 compares readings over time only when the tests were made at similar winding temperature, test voltage, duration and humidity, with the readings brought to a common temperature.
- tests.insulation-resistance.voltage-application: IEEE 43-2013 brings the test voltage to its full value as quickly as practical and keeps it constant for the whole measurement.
- tests.insulation-resistance.voltage-dependence: IEEE 43-2013 observes that dry insulation in good condition shows nearly the same insulation resistance as the test voltage is raised, while a marked fall with rising voltage points to a defect.
Leakage Reactance
- tests.leakage-reactance.equipment.regulator.acceptance: Leakage Reactance is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.7 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.leakage-reactance.equipment.transformer-fluid.acceptance: Leakage Reactance is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.10 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.leakage-reactance.equipment.transformer-fluid.maintenance: Leakage Reactance is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.10 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.leakage-reactance.governed-by.ansi-neta-ats: Leakage Reactance is addressed in ANSI/NETA ATS-2025.
- tests.leakage-reactance.governed-by.ansi-neta-mts: Leakage Reactance is addressed in ANSI/NETA MTS-2023.
- tests.leakage-reactance.governed-by.ieee-c57-15: Leakage Reactance is addressed in IEEE/IEC C57.15-2017.
- tests.leakage-reactance.title: The test method is named Leakage Reactance.Value: Leakage Reactance.
Meter Accuracy Verification
- tests.meter-accuracy-verification.equipment.battery.acceptance: Meter Accuracy Verification is specified for direct-current system chargers in acceptance testing at clause 7.18.2.B.5 of ANSI/NETA ATS-2025.Value: direct-current system chargers.
- tests.meter-accuracy-verification.equipment.battery.maintenance: Meter Accuracy Verification is specified for direct-current system chargers in maintenance testing at clause 7.18.2.B of ANSI/NETA MTS-2023.Value: direct-current system chargers.
- tests.meter-accuracy-verification.equipment.instrument.acceptance: Meter Accuracy Verification is specified for electromechanical and solid-state metering devices in acceptance testing at clause 7.11.1.B.1 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state metering devices.
- tests.meter-accuracy-verification.equipment.instrument.maintenance: Meter Accuracy Verification is specified for electromechanical and solid-state metering devices in maintenance testing at clause 7.11.1.B.1 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state metering devices.
- tests.meter-accuracy-verification.equipment.relay.acceptance: Meter Accuracy Verification is specified for microprocessor-based protective relays in acceptance testing at clause 7.9.2.B.2 of ANSI/NETA ATS-2025.Value: microprocessor-based protective relays.
- tests.meter-accuracy-verification.equipment.relay.maintenance: Meter Accuracy Verification is specified for microprocessor-based protective relays in maintenance testing at clause 7.9.2.B.2 of ANSI/NETA MTS-2023.Value: microprocessor-based protective relays.
- tests.meter-accuracy-verification.equipment.switchgear.acceptance: Meter Accuracy Verification is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.7 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.meter-accuracy-verification.governed-by.ansi-neta-ats: Meter Accuracy Verification is addressed in ANSI/NETA ATS-2025.
- tests.meter-accuracy-verification.governed-by.ansi-neta-mts: Meter Accuracy Verification is addressed in ANSI/NETA MTS-2023.
- tests.meter-accuracy-verification.title: The test method is named Meter Accuracy Verification.Value: Meter Accuracy Verification.
Motor Current Signature Analysis
- tests.motor-current-signature-analysis.equipment.motor.acceptance: Motor Current Signature Analysis is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.15 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.motor-current-signature-analysis.equipment.motor.maintenance: Motor Current Signature Analysis is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.motor-current-signature-analysis.governed-by.ansi-neta-ats: Motor Current Signature Analysis is addressed in ANSI/NETA ATS-2025.
- tests.motor-current-signature-analysis.governed-by.ansi-neta-mts: Motor Current Signature Analysis is addressed in ANSI/NETA MTS-2023.
- tests.motor-current-signature-analysis.title: The test method is named Motor Current Signature Analysis.Value: Motor Current Signature Analysis.
Motor Overload Relay Trip
- tests.motor-overload-relay-trip.equipment.drive.acceptance: Motor Overload Relay Trip is specified for adjustable-speed drive systems in acceptance testing at clause 7.17.B.2 of ANSI/NETA ATS-2025.Value: adjustable-speed drive systems.
- tests.motor-overload-relay-trip.equipment.drive.maintenance: Motor Overload Relay Trip is specified for adjustable-speed drive systems in maintenance testing at clause 7.17.B.2 of ANSI/NETA MTS-2023.Value: adjustable-speed drive systems.
- tests.motor-overload-relay-trip.governed-by.ansi-neta-ats: Motor Overload Relay Trip is addressed in ANSI/NETA ATS-2025.
- tests.motor-overload-relay-trip.governed-by.ansi-neta-mts: Motor Overload Relay Trip is addressed in ANSI/NETA MTS-2023.
- tests.motor-overload-relay-trip.title: The test method is named Motor Overload Relay Trip.Value: Motor Overload Relay Trip.
Motor Run Test Under Load
- tests.motor-run-test-under-load.equipment.motor.acceptance: Motor Run Test Under Load is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.14 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.motor-run-test-under-load.equipment.motor.maintenance: Motor Run Test Under Load is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.motor-run-test-under-load.governed-by.ansi-neta-ats: Motor Run Test Under Load is addressed in ANSI/NETA ATS-2025.
- tests.motor-run-test-under-load.governed-by.ansi-neta-mts: Motor Run Test Under Load is addressed in ANSI/NETA MTS-2023.
- tests.motor-run-test-under-load.title: The test method is named Motor Run Test Under Load.Value: Motor Run Test Under Load.
Motor Vibration Analysis
- tests.motor-vibration-analysis.equipment.generator.acceptance: Motor Vibration Analysis is specified for engine-generator emergency systems in acceptance testing at clause 7.22.1.B.5 of ANSI/NETA ATS-2025.Value: engine-generator emergency systems.
- tests.motor-vibration-analysis.equipment.generator.maintenance: Motor Vibration Analysis is specified for engine-generator emergency systems in maintenance testing at clause 7.22.1.B.4 of ANSI/NETA MTS-2023.Value: engine-generator emergency systems.
- tests.motor-vibration-analysis.equipment.motor.acceptance: Motor Vibration Analysis is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.13 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.motor-vibration-analysis.equipment.motor.maintenance: Motor Vibration Analysis is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.motor-vibration-analysis.governed-by.ansi-neta-ats: Motor Vibration Analysis is addressed in ANSI/NETA ATS-2025.
- tests.motor-vibration-analysis.governed-by.ansi-neta-mts: Motor Vibration Analysis is addressed in ANSI/NETA MTS-2023.
- tests.motor-vibration-analysis.title: The test method is named Motor Vibration Analysis.Value: Motor Vibration Analysis.
Network Protector Mechanism Tests
- tests.network-protector-mechanism-tests.equipment.network-protector.acceptance: Network Protector Mechanism Tests is specified for low-voltage network protectors in acceptance testing at clause 7.8.B.7 of ANSI/NETA ATS-2025.Value: low-voltage network protectors.
- tests.network-protector-mechanism-tests.equipment.network-protector.maintenance: Network Protector Mechanism Tests is specified for low-voltage network protectors in maintenance testing at clause 7.8.B.7 of ANSI/NETA MTS-2023.Value: low-voltage network protectors.
- tests.network-protector-mechanism-tests.equipment.sectionalizer.acceptance: Network Protector Mechanism Tests is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.8 of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.network-protector-mechanism-tests.equipment.sectionalizer.maintenance: Network Protector Mechanism Tests is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.8 of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.network-protector-mechanism-tests.governed-by.ansi-neta-ats: Network Protector Mechanism Tests is addressed in ANSI/NETA ATS-2025.
- tests.network-protector-mechanism-tests.governed-by.ansi-neta-mts: Network Protector Mechanism Tests is addressed in ANSI/NETA MTS-2023.
- tests.network-protector-mechanism-tests.title: The test method is named Network Protector Mechanism Tests.Value: Network Protector Mechanism Tests.
Partial Discharge Offline
- tests.partial-discharge-offline.equipment.cable.acceptance: Partial Discharge Offline is specified for shielded medium-voltage and high-voltage cables in acceptance testing at clause 7.3.3.B.8 of ANSI/NETA ATS-2025.Value: shielded medium-voltage and high-voltage cables.
- tests.partial-discharge-offline.equipment.cable.maintenance: Partial Discharge Offline is specified for shielded medium-voltage and high-voltage cables in maintenance testing at clause 7.3.3.B.9 of ANSI/NETA MTS-2023.Value: shielded medium-voltage and high-voltage cables.
- tests.partial-discharge-offline.equipment.motor.acceptance: Partial Discharge Offline is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.16 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.partial-discharge-offline.equipment.motor.maintenance: Partial Discharge Offline is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.partial-discharge-offline.governed-by.ansi-neta-ats: Partial Discharge Offline is addressed in ANSI/NETA ATS-2025.
- tests.partial-discharge-offline.governed-by.ansi-neta-mts: Partial Discharge Offline is addressed in ANSI/NETA MTS-2023.
- tests.partial-discharge-offline.title: The test method is named Partial Discharge Offline.Value: Partial Discharge Offline.
Partial Discharge Online
- tests.partial-discharge-online.equipment.busway.acceptance: Partial Discharge Online is specified for metal-enclosed busways in acceptance testing at clause 7.4.B.7 of ANSI/NETA ATS-2025.Value: metal-enclosed busways.
- tests.partial-discharge-online.equipment.busway.maintenance: Partial Discharge Online is specified for metal-enclosed busways in maintenance testing at clause 7.4.B.7 of ANSI/NETA MTS-2023.Value: metal-enclosed busways.
- tests.partial-discharge-online.equipment.cable.acceptance: Partial Discharge Online is specified for shielded medium-voltage and high-voltage cables in acceptance testing at clause 7.3.3.B.7 of ANSI/NETA ATS-2025.Value: shielded medium-voltage and high-voltage cables.
- tests.partial-discharge-online.equipment.cable.maintenance: Partial Discharge Online is specified for shielded medium-voltage and high-voltage cables in maintenance testing at clause 7.3.3.B.8 of ANSI/NETA MTS-2023.Value: shielded medium-voltage and high-voltage cables.
- tests.partial-discharge-online.equipment.partialdischarge.acceptance: Partial Discharge Online is specified for equipment surveyed for online partial discharge in acceptance testing at clause 11 of ANSI/NETA ATS-2025.Value: equipment surveyed for online partial discharge.
- tests.partial-discharge-online.equipment.reactor.maintenance: Partial Discharge Online is specified for dry-type shunt and current-limiting reactors in maintenance testing at clause 7.20.3.1.B.5 of ANSI/NETA MTS-2023.Value: dry-type shunt and current-limiting reactors.
- tests.partial-discharge-online.equipment.switch.acceptance: Partial Discharge Online is specified for metal-enclosed medium-voltage air switches in acceptance testing at clause 7.5.1.2.B.7 of ANSI/NETA ATS-2025.Value: metal-enclosed medium-voltage air switches.
- tests.partial-discharge-online.equipment.switch.maintenance: Partial Discharge Online is specified for metal-enclosed medium-voltage air switches in maintenance testing at clause 7.5.1.2.B of ANSI/NETA MTS-2023.Value: metal-enclosed medium-voltage air switches.
- tests.partial-discharge-online.equipment.switchgear.acceptance: Partial Discharge Online is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.15 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.partial-discharge-online.equipment.transformer.acceptance: Partial Discharge Online is specified for large air-cooled dry-type transformers in acceptance testing at clause 7.2.1.2.B.12 of ANSI/NETA ATS-2025.Value: large air-cooled dry-type transformers.
- tests.partial-discharge-online.equipment.transformer.maintenance: Partial Discharge Online is specified for large air-cooled dry-type transformers in maintenance testing at clause 7.2.1.2.B.12 of ANSI/NETA MTS-2023.Value: large air-cooled dry-type transformers.
- tests.partial-discharge-online.governed-by.ansi-neta-ats: Partial Discharge Online is addressed in ANSI/NETA ATS-2025.
- tests.partial-discharge-online.governed-by.ansi-neta-mts: Partial Discharge Online is addressed in ANSI/NETA MTS-2023.
- tests.partial-discharge-online.title: The test method is named Partial Discharge Online.Value: Partial Discharge Online.
Phase Rotation and Phasing
- tests.phase-rotation-and-phasing.equipment.ats-transfer.acceptance: Phase Rotation and Phasing is specified for automatic transfer switches in emergency systems in acceptance testing at clause 7.22.3.B.7 of ANSI/NETA ATS-2025.Value: automatic transfer switches in emergency systems.
- tests.phase-rotation-and-phasing.equipment.busway.acceptance: Phase Rotation and Phasing is specified for metal-enclosed busways in acceptance testing at clause 7.4.B.5 of ANSI/NETA ATS-2025.Value: metal-enclosed busways.
- tests.phase-rotation-and-phasing.equipment.generator.acceptance: Phase Rotation and Phasing is specified for engine-generator emergency systems in acceptance testing at clause 7.22.1.B.3 of ANSI/NETA ATS-2025.Value: engine-generator emergency systems.
- tests.phase-rotation-and-phasing.equipment.network-protector.acceptance: Phase Rotation and Phasing is specified for low-voltage network protectors in acceptance testing at clause 7.8.B.12 of ANSI/NETA ATS-2025.Value: low-voltage network protectors.
- tests.phase-rotation-and-phasing.equipment.switchgear.acceptance: Phase Rotation and Phasing is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.13 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.phase-rotation-and-phasing.equipment.ups.acceptance: Phase Rotation and Phasing is specified for uninterruptible power systems in acceptance testing at clause 7.22.2.B.6 of ANSI/NETA ATS-2025.Value: uninterruptible power systems.
- tests.phase-rotation-and-phasing.equipment.ups.maintenance: Phase Rotation and Phasing is specified for uninterruptible power systems in maintenance testing at clause 7.22.2.B.6 of ANSI/NETA MTS-2023.Value: uninterruptible power systems.
- tests.phase-rotation-and-phasing.governed-by.ansi-neta-ats: Phase Rotation and Phasing is addressed in ANSI/NETA ATS-2025.
- tests.phase-rotation-and-phasing.governed-by.ansi-neta-mts: Phase Rotation and Phasing is addressed in ANSI/NETA MTS-2023.
- tests.phase-rotation-and-phasing.title: The test method is named Phase Rotation and Phasing.Value: Phase Rotation and Phasing.
Polarity Test
- tests.polarity-test.equipment.battery.acceptance: Polarity Test is specified for battery energy storage systems in acceptance testing at clause 7.28.B.5 of ANSI/NETA ATS-2025.Value: battery energy storage systems.
- tests.polarity-test.equipment.instrument.acceptance: Polarity Test is specified for current transformers in acceptance testing at clause 7.10.1.B.2 of ANSI/NETA ATS-2025.Value: current transformers.
- tests.polarity-test.equipment.instrument.maintenance: Polarity Test is specified for current transformers in maintenance testing at clause 7.10.1.B.3 of ANSI/NETA MTS-2023.Value: current transformers.
- tests.polarity-test.equipment.motor.acceptance: Polarity Test is specified for DC motors and generators in acceptance testing at clause 7.15.3.B.7 of ANSI/NETA ATS-2025.Value: DC motors and generators.
- tests.polarity-test.equipment.relay.acceptance: Polarity Test is specified for low-voltage ground-fault protection systems in acceptance testing at clause 7.14.B.5 of ANSI/NETA ATS-2025.Value: low-voltage ground-fault protection systems.
- tests.polarity-test.equipment.relay.maintenance: Polarity Test is specified for low-voltage ground-fault protection systems in maintenance testing at clause 7.14.B of ANSI/NETA MTS-2023.Value: low-voltage ground-fault protection systems.
- tests.polarity-test.equipment.solar.acceptance: Polarity Test is specified for solar photovoltaic systems in acceptance testing at clause 7.29.B.1 of ANSI/NETA ATS-2025.Value: solar photovoltaic systems.
- tests.polarity-test.governed-by.ansi-neta-ats: Polarity Test is addressed in ANSI/NETA ATS-2025.
- tests.polarity-test.governed-by.ansi-neta-mts: Polarity Test is addressed in ANSI/NETA MTS-2023.
- tests.polarity-test.governed-by.ieee-c57-13: Polarity Test is addressed in IEEE C57.13-2016.
- tests.polarity-test.governed-by.ieee-c57-13-1: Polarity Test is addressed in IEEE C57.13.1-2017.
- tests.polarity-test.title: The test method is named Polarity Test.Value: Polarity Test.
Polarization Index and Dielectric Absorption
- tests.polarization-index-and-dielectric-absorption.absorption-current: IEEE 43-2013 links the usefulness of the polarization index to the absorption current, the part of the measured current that dies away while the voltage is held, so the index loses its meaning where that current disappears within seconds.
- tests.polarization-index-and-dielectric-absorption.annex-variants: Annex A of IEEE 43-2013 describes variants of the polarization index built on shorter reading times and states that no agreed pass or fail criteria exist for them.
- tests.polarization-index-and-dielectric-absorption.ats-dar: ANSI/NETA ATS-2025 uses a dielectric absorption ratio for rotating machinery, a measure that IEEE 43-2013 describes only as an informative variant.
- tests.polarization-index-and-dielectric-absorption.ats-rotating: ANSI/NETA ATS-2025 section 7.15.1 evaluates polarization index results for AC induction motors and generators in its own text, and its criteria do not coincide in every case with the minimums recommended in IEEE 43-2013.
- tests.polarization-index-and-dielectric-absorption.both-minimums: IEEE 43-2013 expects a machine to clear both its polarization index and its one-minute insulation resistance recommendations before it is returned to operation or given an overvoltage test.
- tests.polarization-index-and-dielectric-absorption.dar-thirty-second: One variant in Annex A of IEEE 43-2013 divides the one-minute insulation resistance by a reading taken thirty seconds after the voltage is applied.Value: 30 s.
- tests.polarization-index-and-dielectric-absorption.drying: IEEE 43-2013 notes that the polarization index can indicate when the drying of a winding may be stopped.
- tests.polarization-index-and-dielectric-absorption.equipment.reactor.acceptance: Polarization Index and Dielectric Absorption is specified for liquid-filled shunt and current-limiting reactors in acceptance testing at clause 7.20.3.2.B.2 of ANSI/NETA ATS-2025.Value: liquid-filled shunt and current-limiting reactors.
- tests.polarization-index-and-dielectric-absorption.equipment.reactor.maintenance: Polarization Index and Dielectric Absorption is specified for liquid-filled shunt and current-limiting reactors in maintenance testing at clause 7.20.3.2.B of ANSI/NETA MTS-2023.Value: liquid-filled shunt and current-limiting reactors.
- tests.polarization-index-and-dielectric-absorption.equipment.regulator.maintenance: Polarization Index and Dielectric Absorption is specified for induction voltage regulators in maintenance testing at clause 7.12.1.2.B.2 of ANSI/NETA MTS-2023.Value: induction voltage regulators.
- tests.polarization-index-and-dielectric-absorption.governed-by.ansi-neta-ats: Polarization Index and Dielectric Absorption is addressed in ANSI/NETA ATS-2025.
- tests.polarization-index-and-dielectric-absorption.governed-by.ansi-neta-mts: Polarization Index and Dielectric Absorption is addressed in ANSI/NETA MTS-2023.
- tests.polarization-index-and-dielectric-absorption.high-ir-disregard: When the one-minute insulation resistance at the reference temperature is very high, the measured current is so small that IEEE 43-2013 allows the polarization index to be disregarded.
- tests.polarization-index-and-dielectric-absorption.intermediate-readings: IEEE 43-2013 notes that readings at several intervals during the test are commonly recorded so that resistance can be plotted against time.
- tests.polarization-index-and-dielectric-absorption.minimum-shape: Clause 12.2 of IEEE 43-2013 recommends minimum polarization index values that depend on the thermal class of the insulation.
- tests.polarization-index-and-dielectric-absorption.no-temperature-correction: IEEE 43-2013 applies no temperature correction to the polarization index, and it calls for a repeat test at a lower temperature when a hot winding that cooled during the test gives a high result.
- tests.polarization-index-and-dielectric-absorption.not-applicable: IEEE 43-2013 does not apply the polarization index to non-insulated field windings, such as squirrel-cage rotor windings, or to direct-current armatures with exposed commutator copper.
- tests.polarization-index-and-dielectric-absorption.pi-definition: IEEE 43-2013 defines the polarization index as the insulation resistance read after ten minutes of applied voltage divided by the insulation resistance read after one minute.
- tests.polarization-index-and-dielectric-absorption.small-machines: IEEE 43-2013 regards the polarization index as not meaningful for small random-wound machines, because their absorption current dies away within a few seconds.
- tests.polarization-index-and-dielectric-absorption.stress-control: IEEE 43-2013 notes that a continuous stress-control coating over the whole end-winding region can pull the polarization index toward unity.
- tests.polarization-index-and-dielectric-absorption.ten-minute: The later of the two readings that make up the polarization index under IEEE 43-2013 is taken ten minutes after the test voltage is applied.Value: 10 min.
- tests.polarization-index-and-dielectric-absorption.title: The test method is named Polarization Index and Dielectric Absorption.Value: Polarization Index and Dielectric Absorption.
- tests.polarization-index-and-dielectric-absorption.trend-fall: IEEE 43-2013 reads a sharp fall in the polarization index between tests, like a sharp fall in the one-minute insulation resistance, as a sign of contamination, moisture or cracked insulation.
Power Factor Tip Up
- tests.power-factor-tip-up.equipment.motor.acceptance: Power Factor Tip Up is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.6 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.power-factor-tip-up.equipment.motor.maintenance: Power Factor Tip Up is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.power-factor-tip-up.equipment.transformer.acceptance: Power Factor Tip Up is specified for large air-cooled dry-type transformers in acceptance testing at clause 7.2.1.2.B.4 of ANSI/NETA ATS-2025.Value: large air-cooled dry-type transformers.
- tests.power-factor-tip-up.equipment.transformer.maintenance: Power Factor Tip Up is specified for large air-cooled dry-type transformers in maintenance testing at clause 7.2.1.2.B.4 of ANSI/NETA MTS-2023.Value: large air-cooled dry-type transformers.
- tests.power-factor-tip-up.governed-by.ansi-neta-ats: Power Factor Tip Up is addressed in ANSI/NETA ATS-2025.
- tests.power-factor-tip-up.governed-by.ansi-neta-mts: Power Factor Tip Up is addressed in ANSI/NETA MTS-2023.
- tests.power-factor-tip-up.title: The test method is named Power Factor Tip Up.Value: Power Factor Tip Up.
Power Quality and Harmonic Survey
- tests.power-quality-and-harmonic-survey.equipment.battery.acceptance: Power Quality and Harmonic Survey is specified for battery energy storage systems in acceptance testing at clause 7.28.B.6 of ANSI/NETA ATS-2025.Value: battery energy storage systems.
- tests.power-quality-and-harmonic-survey.governed-by.ansi-neta-ats: Power Quality and Harmonic Survey is addressed in ANSI/NETA ATS-2025.
- tests.power-quality-and-harmonic-survey.governed-by.ieee-519: Power Quality and Harmonic Survey is addressed in IEEE 519-2022.
- tests.power-quality-and-harmonic-survey.title: The test method is named Power Quality and Harmonic Survey.Value: Power Quality and Harmonic Survey.
Primary Current Injection Trip Test
- tests.primary-current-injection-trip-test.equipment.breaker.acceptance: Primary Current Injection Trip Test is specified for low-voltage molded-case circuit breakers in acceptance testing at clause 7.6.1.1.1.B.3 of ANSI/NETA ATS-2025.Value: low-voltage molded-case circuit breakers.
- tests.primary-current-injection-trip-test.equipment.breaker.maintenance: Primary Current Injection Trip Test is specified for low-voltage power circuit breakers in maintenance testing at clause 7.6.1.2.B.5 of ANSI/NETA MTS-2023.Value: low-voltage power circuit breakers.
- tests.primary-current-injection-trip-test.governed-by.ansi-neta-ats: Primary Current Injection Trip Test is addressed in ANSI/NETA ATS-2025.
- tests.primary-current-injection-trip-test.governed-by.ansi-neta-mts: Primary Current Injection Trip Test is addressed in ANSI/NETA MTS-2023.
- tests.primary-current-injection-trip-test.title: The test method is named Primary Current Injection Trip Test.Value: Primary Current Injection Trip Test.
Protective Relay Element Tests
- tests.protective-relay-element-tests.equipment.drive.acceptance: Protective Relay Element Tests is specified for adjustable-speed drive systems in acceptance testing at clause 7.17.B.5 of ANSI/NETA ATS-2025.Value: adjustable-speed drive systems.
- tests.protective-relay-element-tests.equipment.drive.maintenance: Protective Relay Element Tests is specified for adjustable-speed drive systems in maintenance testing at clause 7.17.B.5 of ANSI/NETA MTS-2023.Value: adjustable-speed drive systems.
- tests.protective-relay-element-tests.equipment.generator.acceptance: Protective Relay Element Tests is specified for engine-generator emergency systems in acceptance testing at clause 7.22.1.B.2 of ANSI/NETA ATS-2025.Value: engine-generator emergency systems.
- tests.protective-relay-element-tests.equipment.generator.maintenance: Protective Relay Element Tests is specified for engine-generator emergency systems in maintenance testing at clause 7.22.1.B.2 of ANSI/NETA MTS-2023.Value: engine-generator emergency systems.
- tests.protective-relay-element-tests.equipment.motor.acceptance: Protective Relay Element Tests is specified for low-voltage motor starters in acceptance testing at clause 7.16.1.1.B.3 of ANSI/NETA ATS-2025.Value: low-voltage motor starters.
- tests.protective-relay-element-tests.equipment.motor.maintenance: Protective Relay Element Tests is specified for low-voltage motor starters in maintenance testing at clause 7.16.1.1.B.4 of ANSI/NETA MTS-2023.Value: low-voltage motor starters.
- tests.protective-relay-element-tests.equipment.network-protector.acceptance: Protective Relay Element Tests is specified for low-voltage network protectors in acceptance testing at clause 7.8.B.10 of ANSI/NETA ATS-2025.Value: low-voltage network protectors.
- tests.protective-relay-element-tests.equipment.network-protector.maintenance: Protective Relay Element Tests is specified for low-voltage network protectors in maintenance testing at clause 7.8.B.10 of ANSI/NETA MTS-2023.Value: low-voltage network protectors.
- tests.protective-relay-element-tests.equipment.relay.acceptance: Protective Relay Element Tests is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.2 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.protective-relay-element-tests.equipment.relay.maintenance: Protective Relay Element Tests is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.2 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.protective-relay-element-tests.governed-by.ansi-neta-ats: Protective Relay Element Tests is addressed in ANSI/NETA ATS-2025.
- tests.protective-relay-element-tests.governed-by.ansi-neta-mts: Protective Relay Element Tests is addressed in ANSI/NETA MTS-2023.
- tests.protective-relay-element-tests.governed-by.faa-ac-150-5345-10h: Protective Relay Element Tests is addressed in FAA AC 150/5345-10H.
- tests.protective-relay-element-tests.governed-by.ieee-946: Protective Relay Element Tests is addressed in IEEE 946-2020.
- tests.protective-relay-element-tests.title: The test method is named Protective Relay Element Tests.Value: Protective Relay Element Tests.
PV I-V Curve Tracing
- tests.pv-iv-curve-tracing.equipment.solar.acceptance: PV I-V Curve Tracing is specified for solar photovoltaic systems in acceptance testing at clause 7.29.B.7 of ANSI/NETA ATS-2025.Value: solar photovoltaic systems.
- tests.pv-iv-curve-tracing.governed-by.ansi-neta-ats: PV I-V Curve Tracing is addressed in ANSI/NETA ATS-2025.
- tests.pv-iv-curve-tracing.title: The test method is named PV I-V Curve Tracing.Value: PV I-V Curve Tracing.
PV String Voc and Isc
- tests.pv-string-voc-and-isc.equipment.solar.acceptance: PV String Voc and Isc is specified for solar photovoltaic systems in acceptance testing at clause 7.29.B.2 of ANSI/NETA ATS-2025.Value: solar photovoltaic systems.
- tests.pv-string-voc-and-isc.governed-by.ansi-neta-ats: PV String Voc and Isc is addressed in ANSI/NETA ATS-2025.
- tests.pv-string-voc-and-isc.title: The test method is named PV String Voc and Isc.Value: PV String Voc and Isc.
PV Wet Insulation Resistance
- tests.pv-wet-insulation-resistance.equipment.solar.acceptance: PV Wet Insulation Resistance is specified for solar photovoltaic systems in acceptance testing at clause 7.29.B.4 of ANSI/NETA ATS-2025.Value: solar photovoltaic systems.
- tests.pv-wet-insulation-resistance.governed-by.ansi-neta-ats: PV Wet Insulation Resistance is addressed in ANSI/NETA ATS-2025.
- tests.pv-wet-insulation-resistance.title: The test method is named PV Wet Insulation Resistance.Value: PV Wet Insulation Resistance.
Recloser and Sectionalizer Operation
- tests.recloser-and-sectionalizer-operation.equipment.sectionalizer.acceptance: Recloser and Sectionalizer Operation is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.6 of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.recloser-and-sectionalizer-operation.equipment.sectionalizer.maintenance: Recloser and Sectionalizer Operation is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.6 of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.recloser-and-sectionalizer-operation.governed-by.ansi-neta-ats: Recloser and Sectionalizer Operation is addressed in ANSI/NETA ATS-2025.
- tests.recloser-and-sectionalizer-operation.governed-by.ansi-neta-mts: Recloser and Sectionalizer Operation is addressed in ANSI/NETA MTS-2023.
- tests.recloser-and-sectionalizer-operation.title: The test method is named Recloser and Sectionalizer Operation.Value: Recloser and Sectionalizer Operation.
Rectifier Converter Performance
- tests.rectifier-converter-performance.governed-by.ieee-946: Rectifier Converter Performance is addressed in IEEE 946-2020.
- tests.rectifier-converter-performance.governed-by.ieee-c57-12-00: Rectifier Converter Performance is addressed in IEEE C57.12.00-2021.
- tests.rectifier-converter-performance.governed-by.ieee-c57-12-01: Rectifier Converter Performance is addressed in IEEE C57.12.01-2020.
- tests.rectifier-converter-performance.governed-by.ieee-c57-18-10: Rectifier Converter Performance is addressed in IEEE C57.18.10-2021.
- tests.rectifier-converter-performance.title: The test method is named Rectifier Converter Performance.Value: Rectifier Converter Performance.
Relay 21 Distance Test
- tests.relay-21-distance-test.equipment.relay.acceptance: Relay 21 Distance Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.2 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-21-distance-test.equipment.relay.maintenance: Relay 21 Distance Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.2 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-21-distance-test.governed-by.ansi-neta-ats: Relay 21 Distance Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-21-distance-test.governed-by.ansi-neta-mts: Relay 21 Distance Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-21-distance-test.title: The test method is named Relay 21 Distance Test.Value: Relay 21 Distance Test.
Relay 25 Sync Check Test
- tests.relay-25-sync-check-test.equipment.relay.acceptance: Relay 25 Sync Check Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.4 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-25-sync-check-test.equipment.relay.maintenance: Relay 25 Sync Check Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.4 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-25-sync-check-test.governed-by.ansi-neta-ats: Relay 25 Sync Check Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-25-sync-check-test.governed-by.ansi-neta-mts: Relay 25 Sync Check Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-25-sync-check-test.title: The test method is named Relay 25 Sync Check Test.Value: Relay 25 Sync Check Test.
Relay 27 Undervoltage Test
- tests.relay-27-undervoltage-test.equipment.relay.acceptance: Relay 27 Undervoltage Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.5 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-27-undervoltage-test.equipment.relay.maintenance: Relay 27 Undervoltage Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.5 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-27-undervoltage-test.governed-by.ansi-neta-ats: Relay 27 Undervoltage Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-27-undervoltage-test.governed-by.ansi-neta-mts: Relay 27 Undervoltage Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-27-undervoltage-test.title: The test method is named Relay 27 Undervoltage Test.Value: Relay 27 Undervoltage Test.
Relay 32 Directional Power Test
- tests.relay-32-directional-power-test.equipment.relay.acceptance: Relay 32 Directional Power Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.6 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-32-directional-power-test.equipment.relay.maintenance: Relay 32 Directional Power Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.6 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-32-directional-power-test.governed-by.ansi-neta-ats: Relay 32 Directional Power Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-32-directional-power-test.governed-by.ansi-neta-mts: Relay 32 Directional Power Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-32-directional-power-test.title: The test method is named Relay 32 Directional Power Test.Value: Relay 32 Directional Power Test.
Relay 40 Loss of Field Test
- tests.relay-40-loss-of-field-test.equipment.relay.acceptance: Relay 40 Loss of Field Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.7 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-40-loss-of-field-test.equipment.relay.maintenance: Relay 40 Loss of Field Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.7 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-40-loss-of-field-test.governed-by.ansi-neta-ats: Relay 40 Loss of Field Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-40-loss-of-field-test.governed-by.ansi-neta-mts: Relay 40 Loss of Field Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-40-loss-of-field-test.title: The test method is named Relay 40 Loss of Field Test.Value: Relay 40 Loss of Field Test.
Relay 46 Current Balance Test
- tests.relay-46-current-balance-test.equipment.relay.acceptance: Relay 46 Current Balance Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.8 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-46-current-balance-test.equipment.relay.maintenance: Relay 46 Current Balance Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.8 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-46-current-balance-test.governed-by.ansi-neta-ats: Relay 46 Current Balance Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-46-current-balance-test.governed-by.ansi-neta-mts: Relay 46 Current Balance Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-46-current-balance-test.title: The test method is named Relay 46 Current Balance Test.Value: Relay 46 Current Balance Test.
Relay 46n Negative Sequence Test
- tests.relay-46n-negative-sequence-test.equipment.relay.acceptance: Relay 46n Negative Sequence Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.9 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-46n-negative-sequence-test.equipment.relay.maintenance: Relay 46n Negative Sequence Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.9 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-46n-negative-sequence-test.governed-by.ansi-neta-ats: Relay 46n Negative Sequence Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-46n-negative-sequence-test.governed-by.ansi-neta-mts: Relay 46n Negative Sequence Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-46n-negative-sequence-test.title: The test method is named Relay 46n Negative Sequence Test.Value: Relay 46n Negative Sequence Test.
Relay 47 Phase Sequence Test
- tests.relay-47-phase-sequence-test.equipment.relay.acceptance: Relay 47 Phase Sequence Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.10 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-47-phase-sequence-test.equipment.relay.maintenance: Relay 47 Phase Sequence Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.10 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-47-phase-sequence-test.governed-by.ansi-neta-ats: Relay 47 Phase Sequence Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-47-phase-sequence-test.governed-by.ansi-neta-mts: Relay 47 Phase Sequence Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-47-phase-sequence-test.title: The test method is named Relay 47 Phase Sequence Test.Value: Relay 47 Phase Sequence Test.
Relay 49r Thermal Replica Test
- tests.relay-49r-thermal-replica-test.equipment.relay.acceptance: Relay 49r Thermal Replica Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.11 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-49r-thermal-replica-test.equipment.relay.maintenance: Relay 49r Thermal Replica Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.11 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-49r-thermal-replica-test.governed-by.ansi-neta-ats: Relay 49r Thermal Replica Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-49r-thermal-replica-test.governed-by.ansi-neta-mts: Relay 49r Thermal Replica Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-49r-thermal-replica-test.title: The test method is named Relay 49r Thermal Replica Test.Value: Relay 49r Thermal Replica Test.
Relay 49t Temperature Test
- tests.relay-49t-temperature-test.equipment.relay.acceptance: Relay 49t Temperature Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.12 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-49t-temperature-test.equipment.relay.maintenance: Relay 49t Temperature Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.12 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-49t-temperature-test.governed-by.ansi-neta-ats: Relay 49t Temperature Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-49t-temperature-test.governed-by.ansi-neta-mts: Relay 49t Temperature Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-49t-temperature-test.title: The test method is named Relay 49t Temperature Test.Value: Relay 49t Temperature Test.
Relay 50 Instantaneous Overcurrent Test
- tests.relay-50-instantaneous-overcurrent-test.equipment.relay.acceptance: Relay 50 Instantaneous Overcurrent Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.13 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-50-instantaneous-overcurrent-test.equipment.relay.maintenance: Relay 50 Instantaneous Overcurrent Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.13 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-50-instantaneous-overcurrent-test.governed-by.ansi-neta-ats: Relay 50 Instantaneous Overcurrent Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-50-instantaneous-overcurrent-test.governed-by.ansi-neta-mts: Relay 50 Instantaneous Overcurrent Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-50-instantaneous-overcurrent-test.title: The test method is named Relay 50 Instantaneous Overcurrent Test.Value: Relay 50 Instantaneous Overcurrent Test.
Relay 50bf Breaker Failure Test
- tests.relay-50bf-breaker-failure-test.equipment.relay.acceptance: Relay 50bf Breaker Failure Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.14 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-50bf-breaker-failure-test.equipment.relay.maintenance: Relay 50bf Breaker Failure Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.14 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-50bf-breaker-failure-test.governed-by.ansi-neta-ats: Relay 50bf Breaker Failure Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-50bf-breaker-failure-test.governed-by.ansi-neta-mts: Relay 50bf Breaker Failure Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-50bf-breaker-failure-test.title: The test method is named Relay 50bf Breaker Failure Test.Value: Relay 50bf Breaker Failure Test.
Relay 51 Time Overcurrent Test
- tests.relay-51-time-overcurrent-test.equipment.relay.acceptance: Relay 51 Time Overcurrent Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.15 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-51-time-overcurrent-test.equipment.relay.maintenance: Relay 51 Time Overcurrent Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.15 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-51-time-overcurrent-test.governed-by.ansi-neta-ats: Relay 51 Time Overcurrent Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-51-time-overcurrent-test.governed-by.ansi-neta-mts: Relay 51 Time Overcurrent Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-51-time-overcurrent-test.title: The test method is named Relay 51 Time Overcurrent Test.Value: Relay 51 Time Overcurrent Test.
Relay 55 Power Factor Test
- tests.relay-55-power-factor-test.equipment.relay.acceptance: Relay 55 Power Factor Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.16 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-55-power-factor-test.equipment.relay.maintenance: Relay 55 Power Factor Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.16 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-55-power-factor-test.governed-by.ansi-neta-ats: Relay 55 Power Factor Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-55-power-factor-test.governed-by.ansi-neta-mts: Relay 55 Power Factor Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-55-power-factor-test.title: The test method is named Relay 55 Power Factor Test.Value: Relay 55 Power Factor Test.
Relay 59 Overvoltage Test
- tests.relay-59-overvoltage-test.equipment.relay.acceptance: Relay 59 Overvoltage Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.17 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-59-overvoltage-test.equipment.relay.maintenance: Relay 59 Overvoltage Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.17 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-59-overvoltage-test.governed-by.ansi-neta-ats: Relay 59 Overvoltage Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-59-overvoltage-test.governed-by.ansi-neta-mts: Relay 59 Overvoltage Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-59-overvoltage-test.title: The test method is named Relay 59 Overvoltage Test.Value: Relay 59 Overvoltage Test.
Relay 60 Voltage Balance Test
- tests.relay-60-voltage-balance-test.equipment.relay.acceptance: Relay 60 Voltage Balance Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.18 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-60-voltage-balance-test.equipment.relay.maintenance: Relay 60 Voltage Balance Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.18 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-60-voltage-balance-test.governed-by.ansi-neta-ats: Relay 60 Voltage Balance Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-60-voltage-balance-test.governed-by.ansi-neta-mts: Relay 60 Voltage Balance Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-60-voltage-balance-test.title: The test method is named Relay 60 Voltage Balance Test.Value: Relay 60 Voltage Balance Test.
Relay 63 Sudden Pressure Test
- tests.relay-63-sudden-pressure-test.equipment.relay.acceptance: Relay 63 Sudden Pressure Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.19 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-63-sudden-pressure-test.equipment.relay.maintenance: Relay 63 Sudden Pressure Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.19 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-63-sudden-pressure-test.governed-by.ansi-neta-ats: Relay 63 Sudden Pressure Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-63-sudden-pressure-test.governed-by.ansi-neta-mts: Relay 63 Sudden Pressure Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-63-sudden-pressure-test.title: The test method is named Relay 63 Sudden Pressure Test.Value: Relay 63 Sudden Pressure Test.
Relay 64 Ground Detector Test
- tests.relay-64-ground-detector-test.equipment.relay.acceptance: Relay 64 Ground Detector Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.20 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-64-ground-detector-test.equipment.relay.maintenance: Relay 64 Ground Detector Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.20 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-64-ground-detector-test.governed-by.ansi-neta-ats: Relay 64 Ground Detector Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-64-ground-detector-test.governed-by.ansi-neta-mts: Relay 64 Ground Detector Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-64-ground-detector-test.title: The test method is named Relay 64 Ground Detector Test.Value: Relay 64 Ground Detector Test.
Relay 67 Directional Overcurrent Test
- tests.relay-67-directional-overcurrent-test.equipment.relay.acceptance: Relay 67 Directional Overcurrent Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.21 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-67-directional-overcurrent-test.equipment.relay.maintenance: Relay 67 Directional Overcurrent Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.21 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-67-directional-overcurrent-test.governed-by.ansi-neta-ats: Relay 67 Directional Overcurrent Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-67-directional-overcurrent-test.governed-by.ansi-neta-mts: Relay 67 Directional Overcurrent Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-67-directional-overcurrent-test.title: The test method is named Relay 67 Directional Overcurrent Test.Value: Relay 67 Directional Overcurrent Test.
Relay 79 Reclosing Test
- tests.relay-79-reclosing-test.equipment.relay.acceptance: Relay 79 Reclosing Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.22 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-79-reclosing-test.equipment.relay.maintenance: Relay 79 Reclosing Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.22 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-79-reclosing-test.governed-by.ansi-neta-ats: Relay 79 Reclosing Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-79-reclosing-test.governed-by.ansi-neta-mts: Relay 79 Reclosing Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-79-reclosing-test.title: The test method is named Relay 79 Reclosing Test.Value: Relay 79 Reclosing Test.
Relay 81 Frequency Test
- tests.relay-81-frequency-test.equipment.relay.acceptance: Relay 81 Frequency Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.23 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-81-frequency-test.equipment.relay.maintenance: Relay 81 Frequency Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.23 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-81-frequency-test.governed-by.ansi-neta-ats: Relay 81 Frequency Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-81-frequency-test.governed-by.ansi-neta-mts: Relay 81 Frequency Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-81-frequency-test.title: The test method is named Relay 81 Frequency Test.Value: Relay 81 Frequency Test.
Relay 85 Pilot Wire Monitor Test
- tests.relay-85-pilot-wire-monitor-test.equipment.relay.acceptance: Relay 85 Pilot Wire Monitor Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.24 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-85-pilot-wire-monitor-test.equipment.relay.maintenance: Relay 85 Pilot Wire Monitor Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.24 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-85-pilot-wire-monitor-test.governed-by.ansi-neta-ats: Relay 85 Pilot Wire Monitor Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-85-pilot-wire-monitor-test.governed-by.ansi-neta-mts: Relay 85 Pilot Wire Monitor Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-85-pilot-wire-monitor-test.title: The test method is named Relay 85 Pilot Wire Monitor Test.Value: Relay 85 Pilot Wire Monitor Test.
Relay 87 Differential Test
- tests.relay-87-differential-test.equipment.relay.acceptance: Relay 87 Differential Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.25 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-87-differential-test.equipment.relay.maintenance: Relay 87 Differential Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.25 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-87-differential-test.governed-by.ansi-neta-ats: Relay 87 Differential Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-87-differential-test.governed-by.ansi-neta-mts: Relay 87 Differential Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-87-differential-test.title: The test method is named Relay 87 Differential Test.Value: Relay 87 Differential Test.
Relay Time-Delay Timing Test
- tests.relay-2-62-timing-test.equipment.relay.acceptance: Relay Time-Delay Timing Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.1 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-2-62-timing-test.equipment.relay.maintenance: Relay Time-Delay Timing Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.1 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-2-62-timing-test.governed-by.ansi-neta-ats: Relay Time-Delay Timing Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-2-62-timing-test.governed-by.ansi-neta-mts: Relay Time-Delay Timing Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-2-62-timing-test.title: The test method is named Relay Time-Delay Timing Test.Value: Relay Time-Delay Timing Test.
Relay Volts per Hertz Test
- tests.relay-24-volts-per-hertz-test.equipment.relay.acceptance: Relay Volts per Hertz Test is specified for electromechanical and solid-state protective relays in acceptance testing at clause 7.9.1.B.3.3 of ANSI/NETA ATS-2025.Value: electromechanical and solid-state protective relays.
- tests.relay-24-volts-per-hertz-test.equipment.relay.maintenance: Relay Volts per Hertz Test is specified for electromechanical and solid-state protective relays in maintenance testing at clause 7.9.1.B.3.3 of ANSI/NETA MTS-2023.Value: electromechanical and solid-state protective relays.
- tests.relay-24-volts-per-hertz-test.governed-by.ansi-neta-ats: Relay Volts per Hertz Test is addressed in ANSI/NETA ATS-2025.
- tests.relay-24-volts-per-hertz-test.governed-by.ansi-neta-mts: Relay Volts per Hertz Test is addressed in ANSI/NETA MTS-2023.
- tests.relay-24-volts-per-hertz-test.title: The test method is named Relay Volts per Hertz Test.Value: Relay Volts per Hertz Test.
Resistor and Coil Resistance
- tests.resistor-and-coil-resistance.equipment.breaker.acceptance: Resistor and Coil Resistance is specified for medium-voltage air circuit breakers in acceptance testing at clause 7.6.1.3.B.9 of ANSI/NETA ATS-2025.Value: medium-voltage air circuit breakers.
- tests.resistor-and-coil-resistance.equipment.breaker.maintenance: Resistor and Coil Resistance is specified for medium-voltage air circuit breakers in maintenance testing at clause 7.6.1.3.B.10 of ANSI/NETA MTS-2023.Value: medium-voltage air circuit breakers.
- tests.resistor-and-coil-resistance.equipment.cable.acceptance: Resistor and Coil Resistance is specified for low-voltage cables in acceptance testing at clause 7.3.2.B.3 of ANSI/NETA ATS-2025.Value: low-voltage cables.
- tests.resistor-and-coil-resistance.equipment.cable.maintenance: Resistor and Coil Resistance is specified for low-voltage cables in maintenance testing at clause 7.3.2.B of ANSI/NETA MTS-2023.Value: low-voltage cables.
- tests.resistor-and-coil-resistance.equipment.motor.acceptance: Resistor and Coil Resistance is specified for medium-voltage motor starters in acceptance testing at clause 7.16.1.2.B.7 of ANSI/NETA ATS-2025.Value: medium-voltage motor starters.
- tests.resistor-and-coil-resistance.equipment.motor.maintenance: Resistor and Coil Resistance is specified for medium-voltage motor starters in maintenance testing at clause 7.16.1.2.B.8 of ANSI/NETA MTS-2023.Value: medium-voltage motor starters.
- tests.resistor-and-coil-resistance.equipment.resistor.acceptance: Resistor and Coil Resistance is specified for resistors in acceptance testing at clause 7.20.4.B.3 of ANSI/NETA ATS-2025.Value: resistors.
- tests.resistor-and-coil-resistance.equipment.resistor.maintenance: Resistor and Coil Resistance is specified for resistors in maintenance testing at clause 7.20.4.B.5 of ANSI/NETA MTS-2023.Value: resistors.
- tests.resistor-and-coil-resistance.equipment.transformer-fluid.acceptance: Resistor and Coil Resistance is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.18 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.resistor-and-coil-resistance.equipment.transformer-fluid.maintenance: Resistor and Coil Resistance is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.18 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.resistor-and-coil-resistance.governed-by.ansi-neta-ats: Resistor and Coil Resistance is addressed in ANSI/NETA ATS-2025.
- tests.resistor-and-coil-resistance.governed-by.ansi-neta-mts: Resistor and Coil Resistance is addressed in ANSI/NETA MTS-2023.
- tests.resistor-and-coil-resistance.title: The test method is named Resistor and Coil Resistance.Value: Resistor and Coil Resistance.
RTD Circuit Verification
- tests.rtd-circuit-verification.equipment.motor.acceptance: RTD Circuit Verification is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.11 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.rtd-circuit-verification.equipment.motor.maintenance: RTD Circuit Verification is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.rtd-circuit-verification.governed-by.ansi-neta-ats: RTD Circuit Verification is addressed in ANSI/NETA ATS-2025.
- tests.rtd-circuit-verification.governed-by.ansi-neta-mts: RTD Circuit Verification is addressed in ANSI/NETA MTS-2023.
- tests.rtd-circuit-verification.title: The test method is named RTD Circuit Verification.Value: RTD Circuit Verification.
SCADA and Communication Verification
- tests.scada-and-communication-verification.equipment.commissioning-system.maintenance: SCADA and Communication Verification is specified for complete electrical systems in maintenance testing at clause 8 of ANSI/NETA MTS-2023.Value: complete electrical systems.
- tests.scada-and-communication-verification.equipment.relay.acceptance: SCADA and Communication Verification is specified for microprocessor-based protective relays in acceptance testing at clause 7.9.2.B.10 of ANSI/NETA ATS-2025.Value: microprocessor-based protective relays.
- tests.scada-and-communication-verification.equipment.relay.maintenance: SCADA and Communication Verification is specified for microprocessor-based protective relays in maintenance testing at clause 7.9.2.B.5.8 of ANSI/NETA MTS-2023.Value: microprocessor-based protective relays.
- tests.scada-and-communication-verification.equipment.solar.acceptance: SCADA and Communication Verification is specified for solar photovoltaic systems in acceptance testing at clause 7.29.B.10 of ANSI/NETA ATS-2025.Value: solar photovoltaic systems.
- tests.scada-and-communication-verification.governed-by.ansi-neta-ats: SCADA and Communication Verification is addressed in ANSI/NETA ATS-2025.
- tests.scada-and-communication-verification.governed-by.ansi-neta-mts: SCADA and Communication Verification is addressed in ANSI/NETA MTS-2023.
- tests.scada-and-communication-verification.title: The test method is named SCADA and Communication Verification.Value: SCADA and Communication Verification.
SF6 Gas Quality
- tests.sf6-gas-quality.equipment.switch.acceptance: SF6 Gas Quality is specified for medium-voltage sulfur hexafluoride switches in acceptance testing at clause 7.5.4.B.4 of ANSI/NETA ATS-2025.Value: medium-voltage sulfur hexafluoride switches.
- tests.sf6-gas-quality.equipment.switch.maintenance: SF6 Gas Quality is specified for medium-voltage sulfur hexafluoride switches in maintenance testing at clause 7.5.4.B of ANSI/NETA MTS-2023.Value: medium-voltage sulfur hexafluoride switches.
- tests.sf6-gas-quality.governed-by.ansi-neta-ats: SF6 Gas Quality is addressed in ANSI/NETA ATS-2025.
- tests.sf6-gas-quality.governed-by.ansi-neta-mts: SF6 Gas Quality is addressed in ANSI/NETA MTS-2023.
- tests.sf6-gas-quality.title: The test method is named SF6 Gas Quality.Value: SF6 Gas Quality.
Surge Arrester and SPD Tests
- tests.surge-arrester-and-spd-tests.equipment.motor.acceptance: Surge Arrester and SPD Tests is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.9 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.surge-arrester-and-spd-tests.equipment.motor.maintenance: Surge Arrester and SPD Tests is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.surge-arrester-and-spd-tests.equipment.surge.acceptance: Surge Arrester and SPD Tests is specified for medium-voltage and high-voltage surge arresters in acceptance testing at clause 7.19.2.B.4 of ANSI/NETA ATS-2025.Value: medium-voltage and high-voltage surge arresters.
- tests.surge-arrester-and-spd-tests.equipment.surge.maintenance: Surge Arrester and SPD Tests is specified for medium-voltage and high-voltage surge arresters in maintenance testing at clause 7.19.2.B of ANSI/NETA MTS-2023.Value: medium-voltage and high-voltage surge arresters.
- tests.surge-arrester-and-spd-tests.equipment.switchgear.acceptance: Surge Arrester and SPD Tests is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.14 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.surge-arrester-and-spd-tests.equipment.transformer-fluid.acceptance: Surge Arrester and SPD Tests is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.17 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.surge-arrester-and-spd-tests.equipment.transformer-fluid.maintenance: Surge Arrester and SPD Tests is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.17 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.surge-arrester-and-spd-tests.equipment.transformer.acceptance: Surge Arrester and SPD Tests is specified for large air-cooled dry-type transformers in acceptance testing at clause 7.2.1.2.B.11 of ANSI/NETA ATS-2025.Value: large air-cooled dry-type transformers.
- tests.surge-arrester-and-spd-tests.equipment.transformer.maintenance: Surge Arrester and SPD Tests is specified for large air-cooled dry-type transformers in maintenance testing at clause 7.2.1.2.B.11 of ANSI/NETA MTS-2023.Value: large air-cooled dry-type transformers.
- tests.surge-arrester-and-spd-tests.governed-by.ansi-neta-ats: Surge Arrester and SPD Tests is addressed in ANSI/NETA ATS-2025.
- tests.surge-arrester-and-spd-tests.governed-by.ansi-neta-mts: Surge Arrester and SPD Tests is addressed in ANSI/NETA MTS-2023.
- tests.surge-arrester-and-spd-tests.title: The test method is named Surge Arrester and SPD Tests.Value: Surge Arrester and SPD Tests.
Surge Comparison Test
- tests.surge-comparison-test.equipment.motor.acceptance: Surge Comparison Test is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.7 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.surge-comparison-test.equipment.motor.maintenance: Surge Comparison Test is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.surge-comparison-test.governed-by.ansi-neta-ats: Surge Comparison Test is addressed in ANSI/NETA ATS-2025.
- tests.surge-comparison-test.governed-by.ansi-neta-mts: Surge Comparison Test is addressed in ANSI/NETA MTS-2023.
- tests.surge-comparison-test.title: The test method is named Surge Comparison Test.Value: Surge Comparison Test.
Sweep Frequency Response Analysis
- tests.sweep-frequency-response-analysis.equipment.transformer-fluid.acceptance: Sweep Frequency Response Analysis is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.7 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.sweep-frequency-response-analysis.equipment.transformer-fluid.maintenance: Sweep Frequency Response Analysis is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.7 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.sweep-frequency-response-analysis.governed-by.ansi-neta-ats: Sweep Frequency Response Analysis is addressed in ANSI/NETA ATS-2025.
- tests.sweep-frequency-response-analysis.governed-by.ansi-neta-mts: Sweep Frequency Response Analysis is addressed in ANSI/NETA MTS-2023.
- tests.sweep-frequency-response-analysis.title: The test method is named Sweep Frequency Response Analysis.Value: Sweep Frequency Response Analysis.
Synchronous Machine Field Application
- tests.synchronous-machine-field-application.equipment.motor.acceptance: Synchronous Machine Field Application is specified for synchronous motors and generators in acceptance testing at clause 7.15.2.B.18 of ANSI/NETA ATS-2025.Value: synchronous motors and generators.
- tests.synchronous-machine-field-application.equipment.motor.maintenance: Synchronous Machine Field Application is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.synchronous-machine-field-application.governed-by.ansi-neta-ats: Synchronous Machine Field Application is addressed in ANSI/NETA ATS-2025.
- tests.synchronous-machine-field-application.governed-by.ansi-neta-mts: Synchronous Machine Field Application is addressed in ANSI/NETA MTS-2023.
- tests.synchronous-machine-field-application.title: The test method is named Synchronous Machine Field Application.Value: Synchronous Machine Field Application.
System Function Testing
- tests.system-function-testing.equipment.commissioning-system.acceptance: System Function Testing is specified for complete electrical systems in acceptance testing at clause 8 of ANSI/NETA ATS-2025.Value: complete electrical systems.
- tests.system-function-testing.equipment.commissioning-system.maintenance: System Function Testing is specified for complete electrical systems in maintenance testing at clause 8 of ANSI/NETA MTS-2023.Value: complete electrical systems.
- tests.system-function-testing.equipment.evcharging.acceptance: System Function Testing is specified for electric vehicle charging systems in acceptance testing at clause 7.26.B.1 of ANSI/NETA ATS-2025.Value: electric vehicle charging systems.
- tests.system-function-testing.equipment.evcharging.maintenance: System Function Testing is specified for electric vehicle charging systems in maintenance testing at clause 7.26.B.2 of ANSI/NETA MTS-2023.Value: electric vehicle charging systems.
- tests.system-function-testing.equipment.switchgear.acceptance: System Function Testing is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.B.11 of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.system-function-testing.governed-by.ansi-neta-ats: System Function Testing is addressed in ANSI/NETA ATS-2025.
- tests.system-function-testing.governed-by.ansi-neta-mts: System Function Testing is addressed in ANSI/NETA MTS-2023.
- tests.system-function-testing.title: The test method is named System Function Testing.Value: System Function Testing.
Time Domain Reflectometry
- tests.time-domain-reflectometry.equipment.cable.acceptance: Time Domain Reflectometry is specified for shielded medium-voltage and high-voltage cables in acceptance testing at clause 7.3.3.B.3 of ANSI/NETA ATS-2025.Value: shielded medium-voltage and high-voltage cables.
- tests.time-domain-reflectometry.governed-by.ansi-neta-ats: Time Domain Reflectometry is addressed in ANSI/NETA ATS-2025.
- tests.time-domain-reflectometry.title: The test method is named Time Domain Reflectometry.Value: Time Domain Reflectometry.
Transformer Core Insulation Resistance
- tests.transformer-core-insulation-resistance.equipment.transformer-fluid.acceptance: Transformer Core Insulation Resistance is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.11 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.transformer-core-insulation-resistance.equipment.transformer-fluid.maintenance: Transformer Core Insulation Resistance is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.11 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.transformer-core-insulation-resistance.equipment.transformer.acceptance: Transformer Core Insulation Resistance is specified for large air-cooled dry-type transformers in acceptance testing at clause 7.2.1.2.B.8 of ANSI/NETA ATS-2025.Value: large air-cooled dry-type transformers.
- tests.transformer-core-insulation-resistance.equipment.transformer.maintenance: Transformer Core Insulation Resistance is specified for large air-cooled dry-type transformers in maintenance testing at clause 7.2.1.2.B.8 of ANSI/NETA MTS-2023.Value: large air-cooled dry-type transformers.
- tests.transformer-core-insulation-resistance.governed-by.ansi-neta-ats: Transformer Core Insulation Resistance is addressed in ANSI/NETA ATS-2025.
- tests.transformer-core-insulation-resistance.governed-by.ansi-neta-mts: Transformer Core Insulation Resistance is addressed in ANSI/NETA MTS-2023.
- tests.transformer-core-insulation-resistance.title: The test method is named Transformer Core Insulation Resistance.Value: Transformer Core Insulation Resistance.
Transformer Excitation Current
- tests.transformer-excitation-current.equipment.regulator.acceptance: Transformer Excitation Current is specified for load tap changers in acceptance testing at clause 7.12.3.B.12 of ANSI/NETA ATS-2025.Value: load tap changers.
- tests.transformer-excitation-current.equipment.regulator.maintenance: Transformer Excitation Current is specified for load tap changers in maintenance testing at clause 7.12.3.B.12 of ANSI/NETA MTS-2023.Value: load tap changers.
- tests.transformer-excitation-current.equipment.transformer-fluid.acceptance: Transformer Excitation Current is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.6 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.transformer-excitation-current.equipment.transformer-fluid.maintenance: Transformer Excitation Current is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.6 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.transformer-excitation-current.equipment.transformer.acceptance: Transformer Excitation Current is specified for large air-cooled dry-type transformers in acceptance testing at clause 7.2.1.2.B.6 of ANSI/NETA ATS-2025.Value: large air-cooled dry-type transformers.
- tests.transformer-excitation-current.equipment.transformer.maintenance: Transformer Excitation Current is specified for large air-cooled dry-type transformers in maintenance testing at clause 7.2.1.2.B.6 of ANSI/NETA MTS-2023.Value: large air-cooled dry-type transformers.
- tests.transformer-excitation-current.governed-by.ansi-neta-ats: Transformer Excitation Current is addressed in ANSI/NETA ATS-2025.
- tests.transformer-excitation-current.governed-by.ansi-neta-mts: Transformer Excitation Current is addressed in ANSI/NETA MTS-2023.
- tests.transformer-excitation-current.title: The test method is named Transformer Excitation Current.Value: Transformer Excitation Current.
Transformer Turns Ratio
- tests.transformer-turns-ratio.equipment.instrument.acceptance: Transformer Turns Ratio is specified for voltage transformers in acceptance testing at clause 7.10.2.B.3 of ANSI/NETA ATS-2025.Value: voltage transformers.
- tests.transformer-turns-ratio.equipment.instrument.maintenance: Transformer Turns Ratio is specified for voltage transformers in maintenance testing at clause 7.10.2.B.4 of ANSI/NETA MTS-2023.Value: voltage transformers.
- tests.transformer-turns-ratio.equipment.regulator.acceptance: Transformer Turns Ratio is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.10 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.transformer-turns-ratio.equipment.regulator.maintenance: Transformer Turns Ratio is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.8 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.transformer-turns-ratio.equipment.transformer-fluid.acceptance: Transformer Turns Ratio is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.3 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.transformer-turns-ratio.equipment.transformer-fluid.maintenance: Transformer Turns Ratio is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.3 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.transformer-turns-ratio.equipment.transformer.acceptance: Transformer Turns Ratio is specified for small low-voltage air-cooled dry-type transformers in acceptance testing at clause 7.2.1.1.B.3 of ANSI/NETA ATS-2025.Value: small low-voltage air-cooled dry-type transformers.
- tests.transformer-turns-ratio.equipment.transformer.maintenance: Transformer Turns Ratio is specified for small low-voltage air-cooled dry-type transformers in maintenance testing at clause 7.2.1.1.B.3 of ANSI/NETA MTS-2023.Value: small low-voltage air-cooled dry-type transformers.
- tests.transformer-turns-ratio.governed-by.ansi-neta-ats: Transformer Turns Ratio is addressed in ANSI/NETA ATS-2025.
- tests.transformer-turns-ratio.governed-by.ansi-neta-mts: Transformer Turns Ratio is addressed in ANSI/NETA MTS-2023.
- tests.transformer-turns-ratio.governed-by.ieee-c57-12-00: Transformer Turns Ratio is addressed in IEEE C57.12.00-2021.
- tests.transformer-turns-ratio.governed-by.ieee-c57-12-01: Transformer Turns Ratio is addressed in IEEE C57.12.01-2020.
- tests.transformer-turns-ratio.governed-by.ieee-c57-18-10: Transformer Turns Ratio is addressed in IEEE C57.18.10-2021.
- tests.transformer-turns-ratio.title: The test method is named Transformer Turns Ratio.Value: Transformer Turns Ratio.
Trip and Close Coil Minimum Pickup
- tests.trip-and-close-coil-minimum-pickup.equipment.breaker.acceptance: Trip and Close Coil Minimum Pickup is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.6 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.trip-and-close-coil-minimum-pickup.equipment.breaker.maintenance: Trip and Close Coil Minimum Pickup is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.B.6 of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.trip-and-close-coil-minimum-pickup.governed-by.ansi-neta-ats: Trip and Close Coil Minimum Pickup is addressed in ANSI/NETA ATS-2025.
- tests.trip-and-close-coil-minimum-pickup.governed-by.ansi-neta-mts: Trip and Close Coil Minimum Pickup is addressed in ANSI/NETA MTS-2023.
- tests.trip-and-close-coil-minimum-pickup.title: The test method is named Trip and Close Coil Minimum Pickup.Value: Trip and Close Coil Minimum Pickup.
Trip Unit Secondary Injection
- tests.trip-unit-secondary-injection.equipment.breaker.acceptance: Trip Unit Secondary Injection is specified for low-voltage molded-case circuit breakers in acceptance testing at clause 7.6.1.1.1.B.7 of ANSI/NETA ATS-2025.Value: low-voltage molded-case circuit breakers.
- tests.trip-unit-secondary-injection.equipment.breaker.maintenance: Trip Unit Secondary Injection is specified for low-voltage power circuit breakers in maintenance testing at clause 7.6.1.2.B.9 of ANSI/NETA MTS-2023.Value: low-voltage power circuit breakers.
- tests.trip-unit-secondary-injection.governed-by.ansi-neta-ats: Trip Unit Secondary Injection is addressed in ANSI/NETA ATS-2025.
- tests.trip-unit-secondary-injection.governed-by.ansi-neta-mts: Trip Unit Secondary Injection is addressed in ANSI/NETA MTS-2023.
- tests.trip-unit-secondary-injection.title: The test method is named Trip Unit Secondary Injection.Value: Trip Unit Secondary Injection.
UPS Functional and Transfer Tests
- tests.ups-functional-and-transfer-tests.equipment.battery.acceptance: UPS Functional and Transfer Tests is specified for direct-current system chargers in acceptance testing at clause 7.18.2.B.7 of ANSI/NETA ATS-2025.Value: direct-current system chargers.
- tests.ups-functional-and-transfer-tests.equipment.battery.maintenance: UPS Functional and Transfer Tests is specified for direct-current system chargers in maintenance testing at clause 7.18.2.B of ANSI/NETA MTS-2023.Value: direct-current system chargers.
- tests.ups-functional-and-transfer-tests.equipment.surge.acceptance: UPS Functional and Transfer Tests is specified for low-voltage surge protective devices in acceptance testing at clause 7.19.1.B.1 of ANSI/NETA ATS-2025.Value: low-voltage surge protective devices.
- tests.ups-functional-and-transfer-tests.equipment.surge.maintenance: UPS Functional and Transfer Tests is specified for low-voltage surge protective devices in maintenance testing at clause 7.19.1.A.8 of ANSI/NETA MTS-2023.Value: low-voltage surge protective devices.
- tests.ups-functional-and-transfer-tests.equipment.ups.acceptance: UPS Functional and Transfer Tests is specified for uninterruptible power systems in acceptance testing at clause 7.22.2.B.2 of ANSI/NETA ATS-2025.Value: uninterruptible power systems.
- tests.ups-functional-and-transfer-tests.equipment.ups.maintenance: UPS Functional and Transfer Tests is specified for uninterruptible power systems in maintenance testing at clause 7.22.2.B.2 of ANSI/NETA MTS-2023.Value: uninterruptible power systems.
- tests.ups-functional-and-transfer-tests.governed-by.ansi-neta-ats: UPS Functional and Transfer Tests is addressed in ANSI/NETA ATS-2025.
- tests.ups-functional-and-transfer-tests.governed-by.ansi-neta-mts: UPS Functional and Transfer Tests is addressed in ANSI/NETA MTS-2023.
- tests.ups-functional-and-transfer-tests.title: The test method is named UPS Functional and Transfer Tests.Value: UPS Functional and Transfer Tests.
Vacuum Interrupter Integrity
- tests.vacuum-interrupter-integrity.equipment.breaker.acceptance: Vacuum Interrupter Integrity is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.10 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.vacuum-interrupter-integrity.equipment.breaker.maintenance: Vacuum Interrupter Integrity is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.B.9 of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.vacuum-interrupter-integrity.equipment.motor.acceptance: Vacuum Interrupter Integrity is specified for medium-voltage motor starters in acceptance testing at clause 7.16.1.2.B.5 of ANSI/NETA ATS-2025.Value: medium-voltage motor starters.
- tests.vacuum-interrupter-integrity.equipment.motor.maintenance: Vacuum Interrupter Integrity is specified for medium-voltage motor starters in maintenance testing at clause 7.16.1.2.B.6 of ANSI/NETA MTS-2023.Value: medium-voltage motor starters.
- tests.vacuum-interrupter-integrity.equipment.regulator.acceptance: Vacuum Interrupter Integrity is specified for load tap changers in acceptance testing at clause 7.12.3.B.11 of ANSI/NETA ATS-2025.Value: load tap changers.
- tests.vacuum-interrupter-integrity.equipment.regulator.maintenance: Vacuum Interrupter Integrity is specified for load tap changers in maintenance testing at clause 7.12.3.B.10 of ANSI/NETA MTS-2023.Value: load tap changers.
- tests.vacuum-interrupter-integrity.equipment.switch.acceptance: Vacuum Interrupter Integrity is specified for medium-voltage vacuum switches in acceptance testing at clause 7.5.3.B.5 of ANSI/NETA ATS-2025.Value: medium-voltage vacuum switches.
- tests.vacuum-interrupter-integrity.equipment.switch.maintenance: Vacuum Interrupter Integrity is specified for medium-voltage sulfur hexafluoride switches in maintenance testing at clause 7.5.4.B of ANSI/NETA MTS-2023.Value: medium-voltage sulfur hexafluoride switches.
- tests.vacuum-interrupter-integrity.governed-by.ansi-neta-ats: Vacuum Interrupter Integrity is addressed in ANSI/NETA ATS-2025.
- tests.vacuum-interrupter-integrity.governed-by.ansi-neta-mts: Vacuum Interrupter Integrity is addressed in ANSI/NETA MTS-2023.
- tests.vacuum-interrupter-integrity.title: The test method is named Vacuum Interrupter Integrity.Value: Vacuum Interrupter Integrity.
Vacuum Interrupter MAC Test
- tests.vacuum-interrupter-mac-test.equipment.breaker.acceptance: Vacuum Interrupter MAC Test is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.B.9 of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.vacuum-interrupter-mac-test.equipment.motor.acceptance: Vacuum Interrupter MAC Test is specified for medium-voltage motor starters in acceptance testing at clause 7.16.1.2.B.3 of ANSI/NETA ATS-2025.Value: medium-voltage motor starters.
- tests.vacuum-interrupter-mac-test.equipment.motor.maintenance: Vacuum Interrupter MAC Test is specified for medium-voltage motor starters in maintenance testing at clause 7.16.1.2.B.4 of ANSI/NETA MTS-2023.Value: medium-voltage motor starters.
- tests.vacuum-interrupter-mac-test.equipment.regulator.acceptance: Vacuum Interrupter MAC Test is specified for load tap changers in acceptance testing at clause 7.12.3.B.10 of ANSI/NETA ATS-2025.Value: load tap changers.
- tests.vacuum-interrupter-mac-test.equipment.regulator.maintenance: Vacuum Interrupter MAC Test is specified for load tap changers in maintenance testing at clause 7.12.3.B.9 of ANSI/NETA MTS-2023.Value: load tap changers.
- tests.vacuum-interrupter-mac-test.equipment.switch.acceptance: Vacuum Interrupter MAC Test is specified for medium-voltage vacuum switches in acceptance testing at clause 7.5.3.B.4 of ANSI/NETA ATS-2025.Value: medium-voltage vacuum switches.
- tests.vacuum-interrupter-mac-test.governed-by.ansi-neta-ats: Vacuum Interrupter MAC Test is addressed in ANSI/NETA ATS-2025.
- tests.vacuum-interrupter-mac-test.governed-by.ansi-neta-mts: Vacuum Interrupter MAC Test is addressed in ANSI/NETA MTS-2023.
- tests.vacuum-interrupter-mac-test.title: The test method is named Vacuum Interrupter MAC Test.Value: Vacuum Interrupter MAC Test.
Visual and Mechanical Inspection
- tests.visual-and-mechanical-inspection.equipment.ats-transfer.acceptance: Visual and Mechanical Inspection is specified for automatic transfer switches in emergency systems in acceptance testing at clause 7.22.3.A of ANSI/NETA ATS-2025.Value: automatic transfer switches in emergency systems.
- tests.visual-and-mechanical-inspection.equipment.ats-transfer.maintenance: Visual and Mechanical Inspection is specified for automatic transfer switches in emergency systems in maintenance testing at clause 7.22.3.A of ANSI/NETA MTS-2023.Value: automatic transfer switches in emergency systems.
- tests.visual-and-mechanical-inspection.equipment.automation.acceptance: Visual and Mechanical Inspection is specified for automation and communication systems in acceptance testing at clause 7.23.A of ANSI/NETA ATS-2025.Value: automation and communication systems.
- tests.visual-and-mechanical-inspection.equipment.automation.maintenance: Visual and Mechanical Inspection is specified for automation and communication systems in maintenance testing at clause 7.23.A of ANSI/NETA MTS-2023.Value: automation and communication systems.
- tests.visual-and-mechanical-inspection.equipment.battery.acceptance: Visual and Mechanical Inspection is specified for flooded lead-acid batteries in acceptance testing at clause 7.18.1.1.A of ANSI/NETA ATS-2025.Value: flooded lead-acid batteries.
- tests.visual-and-mechanical-inspection.equipment.battery.maintenance: Visual and Mechanical Inspection is specified for flooded lead-acid batteries in maintenance testing at clause 7.18.1.1.A of ANSI/NETA MTS-2023.Value: flooded lead-acid batteries.
- tests.visual-and-mechanical-inspection.equipment.breaker.acceptance: Visual and Mechanical Inspection is specified for oil and vacuum automatic circuit reclosers in acceptance testing at clause 7.24.1.A of ANSI/NETA ATS-2025.Value: oil and vacuum automatic circuit reclosers.
- tests.visual-and-mechanical-inspection.equipment.breaker.maintenance: Visual and Mechanical Inspection is specified for oil and vacuum automatic circuit reclosers in maintenance testing at clause 7.24.1.A of ANSI/NETA MTS-2023.Value: oil and vacuum automatic circuit reclosers.
- tests.visual-and-mechanical-inspection.equipment.busway.acceptance: Visual and Mechanical Inspection is specified for outdoor bus structures in acceptance testing at clause 7.21.A of ANSI/NETA ATS-2025.Value: outdoor bus structures.
- tests.visual-and-mechanical-inspection.equipment.busway.maintenance: Visual and Mechanical Inspection is specified for outdoor bus structures in maintenance testing at clause 7.21.A of ANSI/NETA MTS-2023.Value: outdoor bus structures.
- tests.visual-and-mechanical-inspection.equipment.cable.acceptance: Visual and Mechanical Inspection is specified for fiber-optic cables in acceptance testing at clause 7.25.A of ANSI/NETA ATS-2025.Value: fiber-optic cables.
- tests.visual-and-mechanical-inspection.equipment.cable.maintenance: Visual and Mechanical Inspection is specified for fiber-optic cables in maintenance testing at clause 7.25.A of ANSI/NETA MTS-2023.Value: fiber-optic cables.
- tests.visual-and-mechanical-inspection.equipment.capacitor.acceptance: Visual and Mechanical Inspection is specified for capacitors in acceptance testing at clause 7.20.1.A of ANSI/NETA ATS-2025.Value: capacitors.
- tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance: Visual and Mechanical Inspection is specified for capacitors in maintenance testing at clause 7.20.1.A of ANSI/NETA MTS-2023.Value: capacitors.
- tests.visual-and-mechanical-inspection.equipment.drive.acceptance: Visual and Mechanical Inspection is specified for adjustable-speed drive systems in acceptance testing at clause 7.17.A of ANSI/NETA ATS-2025.Value: adjustable-speed drive systems.
- tests.visual-and-mechanical-inspection.equipment.drive.maintenance: Visual and Mechanical Inspection is specified for adjustable-speed drive systems in maintenance testing at clause 7.17.A of ANSI/NETA MTS-2023.Value: adjustable-speed drive systems.
- tests.visual-and-mechanical-inspection.equipment.evcharging.acceptance: Visual and Mechanical Inspection is specified for electric vehicle charging systems in acceptance testing at clause 7.26.A of ANSI/NETA ATS-2025.Value: electric vehicle charging systems.
- tests.visual-and-mechanical-inspection.equipment.evcharging.maintenance: Visual and Mechanical Inspection is specified for electric vehicle charging systems in maintenance testing at clause 7.26.A of ANSI/NETA MTS-2023.Value: electric vehicle charging systems.
- tests.visual-and-mechanical-inspection.equipment.generator.acceptance: Visual and Mechanical Inspection is specified for engine-generator emergency systems in acceptance testing at clause 7.22.1.A of ANSI/NETA ATS-2025.Value: engine-generator emergency systems.
- tests.visual-and-mechanical-inspection.equipment.generator.maintenance: Visual and Mechanical Inspection is specified for engine-generator emergency systems in maintenance testing at clause 7.22.1.A of ANSI/NETA MTS-2023.Value: engine-generator emergency systems.
- tests.visual-and-mechanical-inspection.equipment.ground.acceptance: Visual and Mechanical Inspection is specified for grounding systems in acceptance testing at clause 7.13.A of ANSI/NETA ATS-2025.Value: grounding systems.
- tests.visual-and-mechanical-inspection.equipment.ground.maintenance: Visual and Mechanical Inspection is specified for grounding systems in maintenance testing at clause 7.13.A of ANSI/NETA MTS-2023.Value: grounding systems.
- tests.visual-and-mechanical-inspection.equipment.instrument.acceptance: Visual and Mechanical Inspection is specified for current transformers in acceptance testing at clause 7.10.1.A of ANSI/NETA ATS-2025.Value: current transformers.
- tests.visual-and-mechanical-inspection.equipment.instrument.maintenance: Visual and Mechanical Inspection is specified for current transformers in maintenance testing at clause 7.10.1.A of ANSI/NETA MTS-2023.Value: current transformers.
- tests.visual-and-mechanical-inspection.equipment.motor.acceptance: Visual and Mechanical Inspection is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.A of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.visual-and-mechanical-inspection.equipment.motor.maintenance: Visual and Mechanical Inspection is specified for AC induction motors and generators in maintenance testing at clause 7.15.1.A of ANSI/NETA MTS-2023.Value: AC induction motors and generators.
- tests.visual-and-mechanical-inspection.equipment.network-protector.acceptance: Visual and Mechanical Inspection is specified for low-voltage network protectors in acceptance testing at clause 7.8.A of ANSI/NETA ATS-2025.Value: low-voltage network protectors.
- tests.visual-and-mechanical-inspection.equipment.network-protector.maintenance: Visual and Mechanical Inspection is specified for low-voltage network protectors in maintenance testing at clause 7.8.A of ANSI/NETA MTS-2023.Value: low-voltage network protectors.
- tests.visual-and-mechanical-inspection.equipment.partialdischarge.maintenance: Visual and Mechanical Inspection is specified for equipment surveyed for online partial discharge in maintenance testing at clause 11 of ANSI/NETA MTS-2023.Value: equipment surveyed for online partial discharge.
- tests.visual-and-mechanical-inspection.equipment.reactor.acceptance: Visual and Mechanical Inspection is specified for dry-type shunt and current-limiting reactors in acceptance testing at clause 7.20.3.1.A of ANSI/NETA ATS-2025.Value: dry-type shunt and current-limiting reactors.
- tests.visual-and-mechanical-inspection.equipment.reactor.maintenance: Visual and Mechanical Inspection is specified for dry-type shunt and current-limiting reactors in maintenance testing at clause 7.20.3.1.A of ANSI/NETA MTS-2023.Value: dry-type shunt and current-limiting reactors.
- tests.visual-and-mechanical-inspection.equipment.regulator.acceptance: Visual and Mechanical Inspection is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.A of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.visual-and-mechanical-inspection.equipment.regulator.maintenance: Visual and Mechanical Inspection is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.A of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.visual-and-mechanical-inspection.equipment.relay.acceptance: Visual and Mechanical Inspection is specified for low-voltage ground-fault protection systems in acceptance testing at clause 7.14.A of ANSI/NETA ATS-2025.Value: low-voltage ground-fault protection systems.
- tests.visual-and-mechanical-inspection.equipment.relay.maintenance: Visual and Mechanical Inspection is specified for low-voltage ground-fault protection systems in maintenance testing at clause 7.14.A of ANSI/NETA MTS-2023.Value: low-voltage ground-fault protection systems.
- tests.visual-and-mechanical-inspection.equipment.resistor.acceptance: Visual and Mechanical Inspection is specified for resistors in acceptance testing at clause 7.20.4.A of ANSI/NETA ATS-2025.Value: resistors.
- tests.visual-and-mechanical-inspection.equipment.resistor.maintenance: Visual and Mechanical Inspection is specified for resistors in maintenance testing at clause 7.20.4.A of ANSI/NETA MTS-2023.Value: resistors.
- tests.visual-and-mechanical-inspection.equipment.sectionalizer.acceptance: Visual and Mechanical Inspection is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.A of ANSI/NETA ATS-2025.Value: oil automatic line sectionalizers.
- tests.visual-and-mechanical-inspection.equipment.sectionalizer.maintenance: Visual and Mechanical Inspection is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.A of ANSI/NETA MTS-2023.Value: oil automatic line sectionalizers.
- tests.visual-and-mechanical-inspection.equipment.solar.acceptance: Visual and Mechanical Inspection is specified for solar photovoltaic systems in acceptance testing at clause 7.29.A of ANSI/NETA ATS-2025.Value: solar photovoltaic systems.
- tests.visual-and-mechanical-inspection.equipment.surge.acceptance: Visual and Mechanical Inspection is specified for low-voltage surge protective devices in acceptance testing at clause 7.19.1.A of ANSI/NETA ATS-2025.Value: low-voltage surge protective devices.
- tests.visual-and-mechanical-inspection.equipment.surge.maintenance: Visual and Mechanical Inspection is specified for low-voltage surge protective devices in maintenance testing at clause 7.19.1.A of ANSI/NETA MTS-2023.Value: low-voltage surge protective devices.
- tests.visual-and-mechanical-inspection.equipment.switch.acceptance: Visual and Mechanical Inspection is specified for low-voltage air switches in acceptance testing at clause 7.5.1.1.A of ANSI/NETA ATS-2025.Value: low-voltage air switches.
- tests.visual-and-mechanical-inspection.equipment.switch.maintenance: Visual and Mechanical Inspection is specified for low-voltage air switches in maintenance testing at clause 7.5.1.1.A of ANSI/NETA MTS-2023.Value: low-voltage air switches.
- tests.visual-and-mechanical-inspection.equipment.switchgear.acceptance: Visual and Mechanical Inspection is specified for switchgear and switchboard assemblies in acceptance testing at clause 7.1.1.A of ANSI/NETA ATS-2025.Value: switchgear and switchboard assemblies.
- tests.visual-and-mechanical-inspection.equipment.transformer-fluid.acceptance: Visual and Mechanical Inspection is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.A of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.visual-and-mechanical-inspection.equipment.transformer-fluid.maintenance: Visual and Mechanical Inspection is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.A of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.visual-and-mechanical-inspection.equipment.transformer.acceptance: Visual and Mechanical Inspection is specified for small low-voltage air-cooled dry-type transformers in acceptance testing at clause 7.2.1.1.A of ANSI/NETA ATS-2025.Value: small low-voltage air-cooled dry-type transformers.
- tests.visual-and-mechanical-inspection.equipment.transformer.maintenance: Visual and Mechanical Inspection is specified for small low-voltage air-cooled dry-type transformers in maintenance testing at clause 7.2.1.1.A of ANSI/NETA MTS-2023.Value: small low-voltage air-cooled dry-type transformers.
- tests.visual-and-mechanical-inspection.equipment.ups.acceptance: Visual and Mechanical Inspection is specified for uninterruptible power systems in acceptance testing at clause 7.22.2.A of ANSI/NETA ATS-2025.Value: uninterruptible power systems.
- tests.visual-and-mechanical-inspection.equipment.ups.maintenance: Visual and Mechanical Inspection is specified for uninterruptible power systems in maintenance testing at clause 7.22.2.A of ANSI/NETA MTS-2023.Value: uninterruptible power systems.
- tests.visual-and-mechanical-inspection.governed-by.ansi-c12-1: Visual and Mechanical Inspection is addressed in ANSI C12.1-2026.
- tests.visual-and-mechanical-inspection.governed-by.ansi-neta-ats: Visual and Mechanical Inspection is addressed in ANSI/NETA ATS-2025.
- tests.visual-and-mechanical-inspection.governed-by.ansi-neta-ecs: Visual and Mechanical Inspection is addressed in ANSI/NETA ECS-2024.
- tests.visual-and-mechanical-inspection.governed-by.ansi-neta-mts: Visual and Mechanical Inspection is addressed in ANSI/NETA MTS-2023.
- tests.visual-and-mechanical-inspection.governed-by.faa-ac-150-5345-10h: Visual and Mechanical Inspection is addressed in FAA AC 150/5345-10H.
- tests.visual-and-mechanical-inspection.governed-by.ieee-946: Visual and Mechanical Inspection is addressed in IEEE 946-2020.
- tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13: Visual and Mechanical Inspection is addressed in IEEE C57.13-2016.
- tests.visual-and-mechanical-inspection.governed-by.ieee-c57-18-10: Visual and Mechanical Inspection is addressed in IEEE C57.18.10-2021.
- tests.visual-and-mechanical-inspection.title: The test method is named Visual and Mechanical Inspection.Value: Visual and Mechanical Inspection.
Winding Resistance
- tests.winding-resistance.equipment.motor.acceptance: Winding Resistance is specified for AC induction motors and generators in acceptance testing at clause 7.15.1.B.4 of ANSI/NETA ATS-2025.Value: AC induction motors and generators.
- tests.winding-resistance.equipment.motor.maintenance: Winding Resistance is specified for synchronous motors and generators in maintenance testing at clause 7.15.2.B of ANSI/NETA MTS-2023.Value: synchronous motors and generators.
- tests.winding-resistance.equipment.reactor.acceptance: Winding Resistance is specified for dry-type shunt and current-limiting reactors in acceptance testing at clause 7.20.3.1.B.3 of ANSI/NETA ATS-2025.Value: dry-type shunt and current-limiting reactors.
- tests.winding-resistance.equipment.reactor.maintenance: Winding Resistance is specified for dry-type shunt and current-limiting reactors in maintenance testing at clause 7.20.3.1.B.3 of ANSI/NETA MTS-2023.Value: dry-type shunt and current-limiting reactors.
- tests.winding-resistance.equipment.regulator.acceptance: Winding Resistance is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.5 of ANSI/NETA ATS-2025.Value: step voltage regulators.
- tests.winding-resistance.equipment.regulator.maintenance: Winding Resistance is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.5 of ANSI/NETA MTS-2023.Value: step voltage regulators.
- tests.winding-resistance.equipment.transformer-fluid.acceptance: Winding Resistance is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.8 of ANSI/NETA ATS-2025.Value: liquid-filled transformers.
- tests.winding-resistance.equipment.transformer-fluid.maintenance: Winding Resistance is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.8 of ANSI/NETA MTS-2023.Value: liquid-filled transformers.
- tests.winding-resistance.equipment.transformer.acceptance: Winding Resistance is specified for large air-cooled dry-type transformers in acceptance testing at clause 7.2.1.2.B.7 of ANSI/NETA ATS-2025.Value: large air-cooled dry-type transformers.
- tests.winding-resistance.equipment.transformer.maintenance: Winding Resistance is specified for large air-cooled dry-type transformers in maintenance testing at clause 7.2.1.2.B.7 of ANSI/NETA MTS-2023.Value: large air-cooled dry-type transformers.
- tests.winding-resistance.governed-by.ansi-neta-ats: Winding Resistance is addressed in ANSI/NETA ATS-2025.
- tests.winding-resistance.governed-by.ansi-neta-mts: Winding Resistance is addressed in ANSI/NETA MTS-2023.
- tests.winding-resistance.governed-by.ieee-c57-13: Winding Resistance is addressed in IEEE C57.13-2016.
- tests.winding-resistance.governed-by.ieee-c57-13-1: Winding Resistance is addressed in IEEE C57.13.1-2017.
- tests.winding-resistance.governed-by.ieee-c57-15: Winding Resistance is addressed in IEEE/IEC C57.15-2017.
- tests.winding-resistance.title: The test method is named Winding Resistance.Value: Winding Resistance.
Zone Selective Interlocking
- tests.zone-selective-interlocking.equipment.relay.acceptance: Zone Selective Interlocking is specified for low-voltage ground-fault protection systems in acceptance testing at clause 7.14.B.8 of ANSI/NETA ATS-2025.Value: low-voltage ground-fault protection systems.
- tests.zone-selective-interlocking.equipment.relay.maintenance: Zone Selective Interlocking is specified for low-voltage ground-fault protection systems in maintenance testing at clause 7.14.B of ANSI/NETA MTS-2023.Value: low-voltage ground-fault protection systems.
- tests.zone-selective-interlocking.governed-by.ansi-neta-ats: Zone Selective Interlocking is addressed in ANSI/NETA ATS-2025.
- tests.zone-selective-interlocking.governed-by.ansi-neta-mts: Zone Selective Interlocking is addressed in ANSI/NETA MTS-2023.
- tests.zone-selective-interlocking.title: The test method is named Zone Selective Interlocking.Value: Zone Selective Interlocking.
Standards
ANSI C12.1-2026
- std.ansi-c12-1.edition.2026: ANSI C12.1-2026 is the 2026 edition of the ANSI code for electricity metering, listed on the ANSI webstore with NEMA as the content provider.Value: 2026.
- std.ansi-c12-1.scope: The code sets performance criteria for new AC watthour meters, demand meters and related devices, acceptable in-service performance levels for revenue meters, and recommended measurements, installation requirements and test schedules.
ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications
- std.ansi-neta-ats.designation: ANSI/NETA ATS-2025 is the designation of the document titled ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications.Value: ANSI/NETA ATS-2025.
- std.ansi-neta-ats.edition.2025: ANSI/NETA ATS-2025 is the 2025 edition of the NETA standard for acceptance testing specifications.Value: 2025.
- std.ansi-neta-ats.scope: The standard sets out field tests and inspections for judging whether electrical power equipment and systems are suitable for initial energization, so that they are operational, within applicable tolerances and installed to the design.
- std.ansi-neta-ats.status: The NETA standards development page lists the 2025 edition as the current edition of ANSI/NETA ATS.Value: current edition.
- std.ansi-neta-ats.title: The NETA shop lists the title of ANSI/NETA ATS-2025 as ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications.Value: ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications.
ANSI/NETA ECS-2024 Standard for Electrical Commissioning Specifications
- std.ansi-neta-ecs.designation: ANSI/NETA ECS-2024 is the designation of the document titled ANSI/NETA ECS-2024 Standard for Electrical Commissioning Specifications.Value: ANSI/NETA ECS-2024.
- std.ansi-neta-ecs.edition.2024: ANSI/NETA ECS-2024 is the 2024 edition of the NETA standard for electrical commissioning specifications.Value: 2024.
- std.ansi-neta-ecs.status: The NETA standards development page lists the 2024 edition as the current edition of ANSI/NETA ECS.Value: current edition.
- std.ansi-neta-ecs.title: The NETA shop lists the title of ANSI/NETA ECS-2024 as ANSI/NETA ECS-2024 Standard for Electrical Commissioning Specifications.Value: ANSI/NETA ECS-2024 Standard for Electrical Commissioning Specifications.
ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications
- std.ansi-neta-mts.designation: ANSI/NETA MTS-2023 is the designation of the document titled ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications.Value: ANSI/NETA MTS-2023.
- std.ansi-neta-mts.edition.2023: ANSI/NETA MTS-2023 is the 2023 edition of the NETA standard for maintenance testing specifications.Value: 2023.
- std.ansi-neta-mts.scope: The standard specifies maintenance tests for electrical power equipment and systems so that they operate reliably and safely within industry and manufacturer tolerances.
- std.ansi-neta-mts.status: The NETA standards development page lists the 2023 edition as the current edition of ANSI/NETA MTS.Value: current edition.
- std.ansi-neta-mts.title: The NETA shop lists the title of ANSI/NETA MTS-2023 as ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications.Value: ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications.
FAA AC 150/5345-10H
- std.faa-ac-150-5345-10h.edition.h: The H revision of the FAA advisory circular on constant current regulators and regulator monitors for airport lighting circuits was issued on the date stated in the datum value.Value: H.
- std.faa-ac-150-5345-10h.scope: The circular contains a specification for constant current regulators and for a monitor used with airport lighting circuits, and it cancels the earlier revision G.
IEEE Guide for Field Testing of Relaying Current Transformers
- std.ieee-c57-13-1.designation: IEEE C57.13.1-2017 is the designation of the document titled IEEE Guide for Field Testing of Relaying Current Transformers.Value: IEEE C57.13.1-2017.
- std.ieee-c57-13-1.edition.2017: IEEE C57.13.1-2017 is the 2017 edition of the IEEE document titled IEEE Guide for Field Testing of Relaying Current Transformers, published on 2018-10-31.Value: 2017.
- std.ieee-c57-13-1.scope: The guide describes field test methods for confirming that relaying current transformers are wired correctly, carry their marked ratio and polarity, and remain able to perform as designed when new and after time in service.
- std.ieee-c57-13-1.status: The IEEE catalog lists IEEE C57.13.1-2017 with the status Active Standard.Value: Active Standard.
- std.ieee-c57-13-1.title: The publisher catalog gives the full title of IEEE C57.13.1-2017 as IEEE Guide for Field Testing of Relaying Current Transformers.Value: IEEE Guide for Field Testing of Relaying Current Transformers.
IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications
- std.ieee-450.designation: IEEE 450-2020 is the designation of the document titled IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications.Value: IEEE 450-2020.
- std.ieee-450.edition.2020: IEEE 450-2020 is the 2020 edition of the IEEE document titled IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications, published on 2021-03-05.Value: 2020.
- std.ieee-450.scope: The recommended practice gives maintenance routines, test schedules and test procedures for permanently installed vented lead-acid batteries in float-charged standby service, along with guidance on when to replace them.
- std.ieee-450.status: The IEEE catalog lists IEEE 450-2020 with the status Active Standard.Value: Active Standard.
- std.ieee-450.title: The publisher catalog gives the full title of IEEE 450-2020 as IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications.Value: IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications.
IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery
- std.ieee-43.approved: The 2013 edition of IEEE 43 was approved on 2013-12-11.Value: 2013.
- std.ieee-43.designation: IEEE 43-2013 is the designation of the document titled IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery.Value: IEEE 43-2013.
- std.ieee-43.edition.2013: IEEE 43-2013 is the 2013 edition of the IEEE document titled IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery, published on 2014-03-06.Value: 2013.
- std.ieee-43.revision-of: IEEE 43-2013 is a revision of IEEE 43-2000.Value: 2013.
- std.ieee-43.scope: The recommended practice describes direct-voltage procedures for measuring the insulation resistance and polarization index of stator and rotor windings and explains how to interpret the results.
- std.ieee-43.sponsor: IEEE 43-2013 was sponsored by the Electric Machinery Committee of the IEEE Power and Energy Society.
- std.ieee-43.status: The IEEE catalog lists IEEE 43-2013 with the status Inactive-Reserved Standard, with an inactivation date of 2024-03-21.Value: Inactive-Reserved Standard.
- std.ieee-43.structure.annex-a: Annex A of IEEE 43-2013 is informative and describes variants of the polarization index.
- std.ieee-43.structure.conditions: Clause 7 of IEEE 43-2013 covers the conditions recorded at the time of test, and clause 8 covers the winding connections used for the test.
- std.ieee-43.structure.factors: Clause 6 of IEEE 43-2013 covers the factors that affect insulation resistance readings, among them surface condition, moisture, temperature and test voltage.
- std.ieee-43.structure.instruments: Clause 9 of IEEE 43-2013 describes the instruments and methods for measuring insulation resistance.
- std.ieee-43.structure.interpretation: Clause 11 of IEEE 43-2013 covers the interpretation of test results, and clause 12 gives recommended minimum values.
- std.ieee-43.structure.procedure: Clause 5 of IEEE 43-2013 sets out the insulation resistance and polarization index test procedures and the choice of test voltage.
- std.ieee-43.structure.safety: Clause 4 of IEEE 43-2013 deals with safety during insulation resistance testing.
- std.ieee-43.structure.voltage-application: Clause 10 of IEEE 43-2013 covers how the test voltage is applied and held, including allowance for the drop across a protective resistor.
- std.ieee-43.title: The publisher catalog gives the full title of IEEE 43-2013 as IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery.Value: IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery.
IEEE Recommended Practice for the Design of DC Power Systems for Stationary Applications
- std.ieee-946.designation: IEEE 946-2020 is the designation of the document titled IEEE Recommended Practice for the Design of DC Power Systems for Stationary Applications.Value: IEEE 946-2020.
- std.ieee-946.edition.2020: IEEE 946-2020 is the 2020 edition of the IEEE document titled IEEE Recommended Practice for the Design of DC Power Systems for Stationary Applications, published on 2020-09-23.Value: 2020.
- std.ieee-946.scope: The recommended practice covers the design of direct-current power systems built around lead-acid or nickel-cadmium batteries, static chargers and distribution equipment for generation, substation and telecommunication uses.
- std.ieee-946.status: The IEEE catalog lists IEEE 946-2020 with the status Active Standard.Value: Active Standard.
- std.ieee-946.title: The publisher catalog gives the full title of IEEE 946-2020 as IEEE Recommended Practice for the Design of DC Power Systems for Stationary Applications.Value: IEEE Recommended Practice for the Design of DC Power Systems for Stationary Applications.
IEEE Standard for General Requirements for Dry-Type Distribution and Power Transformers
- std.ieee-c57-12-01.designation: IEEE C57.12.01-2020 is the designation of the document titled IEEE Standard for General Requirements for Dry-Type Distribution and Power Transformers.Value: IEEE C57.12.01-2020.
- std.ieee-c57-12-01.edition.2020: IEEE C57.12.01-2020 is the 2020 edition of the IEEE document titled IEEE Standard for General Requirements for Dry-Type Distribution and Power Transformers, published on 2020-11-24.Value: 2020.
- std.ieee-c57-12-01.scope: The standard covers the electrical, mechanical and safety requirements of dry-type distribution and power transformers and autotransformers in ventilated, non-ventilated and sealed constructions, where the highest-voltage winding is above the low-voltage class stated in the datum value.Value: 601 V.
- std.ieee-c57-12-01.status: The IEEE catalog lists IEEE C57.12.01-2020 with the status Active Standard.Value: Active Standard.
- std.ieee-c57-12-01.title: The publisher catalog gives the full title of IEEE C57.12.01-2020 as IEEE Standard for General Requirements for Dry-Type Distribution and Power Transformers.Value: IEEE Standard for General Requirements for Dry-Type Distribution and Power Transformers.
IEEE Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers
- std.ieee-c57-12-00.designation: IEEE C57.12.00-2021 is the designation of the document titled IEEE Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers.Value: IEEE C57.12.00-2021.
- std.ieee-c57-12-00.edition.2021: IEEE C57.12.00-2021 is the 2021 edition of the IEEE document titled IEEE Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers, published on 2022-01-21.Value: 2021.
- std.ieee-c57-12-00.scope: The standard sets general electrical and mechanical requirements for liquid-immersed distribution, power, autotransformer and regulating transformers whose highest-voltage winding is above the low-voltage class stated in the datum value, and it lists the transformer types it excludes.Value: 601 V.
- std.ieee-c57-12-00.status: The IEEE catalog lists IEEE C57.12.00-2021 with the status Active Standard.Value: Active Standard.
- std.ieee-c57-12-00.title: The publisher catalog gives the full title of IEEE C57.12.00-2021 as IEEE Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers.Value: IEEE Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers.
IEEE Standard for Harmonic Control in Electric Power Systems
- std.ieee-519.designation: IEEE 519-2022 is the designation of the document titled IEEE Standard for Harmonic Control in Electric Power Systems.Value: IEEE 519-2022.
- std.ieee-519.edition.2022: IEEE 519-2022 is the 2022 edition of the IEEE document titled IEEE Standard for Harmonic Control in Electric Power Systems, published on 2022-08-05.Value: 2022.
- std.ieee-519.scope: The standard sets design goals for power systems that serve both linear and nonlinear loads, defines the point of common coupling as the interface where those goals apply, and addresses steady-state waveform distortion.
- std.ieee-519.status: The IEEE catalog lists IEEE 519-2022 with the status Active Standard.Value: Active Standard.
- std.ieee-519.title: The publisher catalog gives the full title of IEEE 519-2022 as IEEE Standard for Harmonic Control in Electric Power Systems.Value: IEEE Standard for Harmonic Control in Electric Power Systems.
IEEE Standard for High Accuracy Instrument Transformers
- std.ieee-c57-13-6.designation: IEEE C57.13.6-2005 is the designation of the document titled IEEE Standard for High Accuracy Instrument Transformers.Value: IEEE C57.13.6-2005.
- std.ieee-c57-13-6.edition.2005: IEEE C57.13.6-2005 is the 2005 edition of the IEEE document titled IEEE Standard for High Accuracy Instrument Transformers, published on 2005-12-09.Value: 2005.
- std.ieee-c57-13-6.inactivated: The IEEE catalog lists the inactivation of IEEE C57.13.6-2005 on the date stated in the datum value.Value: 2021-03-25.
- std.ieee-c57-13-6.reaffirmed: The IEEE catalog lists the reaffirmation of IEEE C57.13.6-2005 on the date stated in the datum value.Value: 2010-06-17.
- std.ieee-c57-13-6.scope: The standard adds one 0.15 voltage transformer accuracy class, two 0.15 current transformer accuracy classes, two current transformer burdens and two routine accuracy test methods for current transformers.
- std.ieee-c57-13-6.status: The IEEE catalog lists IEEE C57.13.6-2005 with the status Inactive-Reserved Standard.Value: Inactive-Reserved Standard.
- std.ieee-c57-13-6.title: The publisher catalog gives the full title of IEEE C57.13.6-2005 as IEEE Standard for High Accuracy Instrument Transformers.Value: IEEE Standard for High Accuracy Instrument Transformers.
IEEE Standard Practices and Requirements for Semiconductor Power Rectifier Transformers
- std.ieee-c57-18-10.designation: IEEE C57.18.10-2021 is the designation of the document titled IEEE Standard Practices and Requirements for Semiconductor Power Rectifier Transformers.Value: IEEE C57.18.10-2021.
- std.ieee-c57-18-10.edition.2021: IEEE C57.18.10-2021 is the 2021 edition of the IEEE document titled IEEE Standard Practices and Requirements for Semiconductor Power Rectifier Transformers, published on 2022-03-29.Value: 2021.
- std.ieee-c57-18-10.scope: The standard covers practices and requirements for single-phase and three-phase transformers serving dedicated semiconductor rectifier loads at or above the minimum rating stated in the datum value, including service conditions and routine tests.Value: 100 kW.
- std.ieee-c57-18-10.status: The IEEE catalog lists IEEE C57.18.10-2021 with the status Active Standard.Value: Active Standard.
- std.ieee-c57-18-10.title: The publisher catalog gives the full title of IEEE C57.18.10-2021 as IEEE Standard Practices and Requirements for Semiconductor Power Rectifier Transformers.Value: IEEE Standard Practices and Requirements for Semiconductor Power Rectifier Transformers.
IEEE Standard Requirements for Instrument Transformers
- std.ieee-c57-13.designation: IEEE C57.13-2016 is the designation of the document titled IEEE Standard Requirements for Instrument Transformers.Value: IEEE C57.13-2016.
- std.ieee-c57-13.edition.2016: IEEE C57.13-2016 is the 2016 edition of the IEEE document titled IEEE Standard Requirements for Instrument Transformers, published on 2016-06-29.Value: 2016.
- std.ieee-c57-13.scope: The standard sets electrical, dimensional, mechanical and certain safety requirements for current transformers and inductively coupled voltage transformers used for measurement and for controlling AC generation, transmission and distribution equipment, and it covers metering accuracy classes and test procedures.
- std.ieee-c57-13.status: The IEEE catalog lists IEEE C57.13-2016 with the status Active Standard.Value: Active Standard.
- std.ieee-c57-13.title: The publisher catalog gives the full title of IEEE C57.13-2016 as IEEE Standard Requirements for Instrument Transformers.Value: IEEE Standard Requirements for Instrument Transformers.
IEEE Standard Test Code for Dry-Type Distribution and Power Transformers
- std.ieee-c57-12-91.designation: IEEE C57.12.91-2020 is the designation of the document titled IEEE Standard Test Code for Dry-Type Distribution and Power Transformers.Value: IEEE C57.12.91-2020.
- std.ieee-c57-12-91.edition.2020: IEEE C57.12.91-2020 is the 2020 edition of the IEEE document titled IEEE Standard Test Code for Dry-Type Distribution and Power Transformers, published on 2021-01-28.Value: 2020.
- std.ieee-c57-12-91.scope: The test code describes test procedures for dry-type distribution and power transformers, and it leaves performance requirements and pass criteria to other standards or to user specifications.
- std.ieee-c57-12-91.status: The IEEE catalog lists IEEE C57.12.91-2020 with the status Superseded Standard, superseded by C57.12.91-2026.Value: Superseded Standard.
- std.ieee-c57-12-91.title: The publisher catalog gives the full title of IEEE C57.12.91-2020 as IEEE Standard Test Code for Dry-Type Distribution and Power Transformers.Value: IEEE Standard Test Code for Dry-Type Distribution and Power Transformers.
IEEE/IEC International Standard: Power transformers, Part 21: Standard requirements, terminology, and test code for step-voltage regulators
- std.ieee-c57-15.designation: IEEE/IEC C57.15-2017 is the designation of the document titled IEEE/IEC International Standard: Power transformers, Part 21: Standard requirements, terminology, and test code for step-voltage regulators.Value: IEEE/IEC C57.15-2017.
- std.ieee-c57-15.edition.2017: IEEE/IEC C57.15-2017 is the 2017 edition of the IEEE/IEC international standard on requirements, terminology and test code for step-voltage regulators, published on the date stated in the datum value.Value: 2017.
- std.ieee-c57-15.scope: The standard covers electrical, mechanical and test requirements for liquid-immersed single-phase and three-phase step-voltage regulators for distribution and substation use, including their controls, within stated kVA and voltage ceilings.
- std.ieee-c57-15.status: The IEEE catalog lists IEEE/IEC C57.15-2017 with the status Active Standard.Value: Active Standard.
- std.ieee-c57-15.title: The publisher catalog gives the full title of IEEE/IEC C57.15-2017 as IEEE/IEC International Standard: Power transformers, Part 21: Standard requirements, terminology, and test code for step-voltage regulators.Value: IEEE/IEC International Standard: Power transformers, Part 21: Standard requirements, terminology, and test code for step-voltage regulators.
NFPA 70, National Electrical Code (NEC)
- std.nfpa-70.designation: NFPA 70 is the designation of National Electrical Code (NEC), which the publisher catalog lists in its 2026 edition.Value: NFPA 70.
- std.nfpa-70.edition.2026: The NFPA store lists a 2026 edition of NFPA 70, the National Electrical Code.Value: 2026.
- std.nfpa-70.title: The NFPA store lists NFPA 70 under the title National Electrical Code (NEC).Value: NFPA 70, National Electrical Code (NEC).
Utility-Type Battery Chargers
- std.nema-pe-5.designation: NEMA PE 5-1997 (R2003) is the designation of the document titled Utility-Type Battery Chargers.Value: NEMA PE 5-1997 (R2003).
- std.nema-pe-5.edition.1997: The NEMA standards catalog lists NEMA PE 5 in its 1997 edition reaffirmed in 2003.Value: 1997 (R2003).
- std.nema-pe-5.scope: The standard provides definitions, minimum requirements and test methods for filtered and unfiltered constant-potential battery chargers of the utility type.
- std.nema-pe-5.status: The NEMA standards catalog lists NEMA PE 5-1997 (R2003) as active.Value: active.
- std.nema-pe-5.title: The NEMA standards catalog gives the title of NEMA PE 5 as Utility-Type Battery Chargers.Value: Utility-Type Battery Chargers.
Equipment classes
Liquid-filled transformers
- equip.liquid-filled-transformers.ats-section: Section 7.2.2 of ANSI/NETA ATS-2025 covers the acceptance testing of liquid-filled transformers.
- equip.liquid-filled-transformers.ats-tables: Section 7.2.2 of ANSI/NETA ATS-2025 refers to Table 100.3 for dissipation factor or power factor, to Table 100.4 for insulating fluid limits and to Table 100.5 for transformer insulation resistance.
- equip.liquid-filled-transformers.definition: A liquid-filled transformer is a transformer whose core and windings are immersed in an insulating liquid that serves both as electrical insulation and as a cooling medium.
- equip.liquid-filled-transformers.mts-section: Section 7.2.2 of ANSI/NETA MTS-2023 covers the maintenance testing of liquid-filled transformers.
Low-voltage circuit breakers
- equip.low-voltage-circuit-breakers.acc.contact-resistance: ANSI/NETA ATS-2025 calls for contact or pole resistance measurements on molded-case, insulated-case and low-voltage power circuit breakers at acceptance.
- equip.low-voltage-circuit-breakers.acc.control-functional: ANSI/NETA ATS-2025 calls for verification of control and functional operation on insulated-case and low-voltage power circuit breakers at acceptance.
- equip.low-voltage-circuit-breakers.acc.ground-fault: ANSI/NETA ATS-2025 calls for tests of ground-fault protection functions on molded-case, insulated-case and low-voltage power circuit breakers at acceptance.
- equip.low-voltage-circuit-breakers.acc.insulation-resistance: ANSI/NETA ATS-2025 calls for insulation resistance tests on molded-case, insulated-case and low-voltage power circuit breakers at acceptance.
- equip.low-voltage-circuit-breakers.acc.primary-injection: ANSI/NETA ATS-2025 calls for trip tests by primary current injection on molded-case, insulated-case and low-voltage power circuit breakers at acceptance.
- equip.low-voltage-circuit-breakers.acc.secondary-injection: ANSI/NETA ATS-2025 calls for secondary injection tests of the trip unit on molded-case, insulated-case and low-voltage power circuit breakers at acceptance.
- equip.low-voltage-circuit-breakers.acc.visual-mechanical: ANSI/NETA ATS-2025 opens its sections on molded-case, insulated-case and low-voltage power circuit breakers with visual and mechanical inspection.
- equip.low-voltage-circuit-breakers.ats-sections: ANSI/NETA ATS-2025 treats low-voltage circuit breakers in separate sections for molded-case breakers (7.6.1.1.1), insulated-case breakers (7.6.1.1.2) and power circuit breakers (7.6.1.2).
- equip.low-voltage-circuit-breakers.ats-tables: The ANSI/NETA ATS-2025 sections on low-voltage circuit breakers refer to Table 100.1 for insulation resistance, to Table 100.7 for inverse-time trip testing of molded-case breakers and to Table 100.8 for instantaneous trip tolerances.
- equip.low-voltage-circuit-breakers.definition: A low-voltage circuit breaker is a circuit breaker built for low-voltage power circuits, a class that takes in molded-case, insulated-case and low-voltage power circuit breakers.
- equip.low-voltage-circuit-breakers.mnt.coil-pickup: ANSI/NETA MTS-2023 calls for minimum pickup tests of trip and close coils on insulated-case and molded-case breakers in maintenance testing.
- equip.low-voltage-circuit-breakers.mnt.contact-resistance: ANSI/NETA MTS-2023 calls for contact or pole resistance measurements on insulated-case, molded-case and low-voltage power circuit breakers in maintenance testing.
- equip.low-voltage-circuit-breakers.mnt.control-functional: ANSI/NETA MTS-2023 calls for verification of control and functional operation on low-voltage power circuit breakers in maintenance testing.
- equip.low-voltage-circuit-breakers.mnt.ground-fault: ANSI/NETA MTS-2023 calls for tests of ground-fault protection functions on insulated-case, molded-case and low-voltage power circuit breakers in maintenance testing.
- equip.low-voltage-circuit-breakers.mnt.insulation-resistance: ANSI/NETA MTS-2023 calls for insulation resistance tests on insulated-case, molded-case and low-voltage power circuit breakers in maintenance testing.
- equip.low-voltage-circuit-breakers.mnt.primary-injection: ANSI/NETA MTS-2023 calls for trip tests by primary current injection on insulated-case, molded-case and low-voltage power circuit breakers in maintenance testing.
- equip.low-voltage-circuit-breakers.mnt.secondary-injection: ANSI/NETA MTS-2023 calls for secondary injection tests of the trip unit on insulated-case, molded-case and low-voltage power circuit breakers in maintenance testing.
- equip.low-voltage-circuit-breakers.mnt.visual-mechanical: ANSI/NETA MTS-2023 opens its sections on insulated-case and molded-case breakers and on low-voltage power circuit breakers with visual and mechanical inspection.
- equip.low-voltage-circuit-breakers.mts-sections: ANSI/NETA MTS-2023 treats insulated-case and molded-case breakers together in section 7.6.1.1 and low-voltage power circuit breakers in section 7.6.1.2.
- equip.low-voltage-circuit-breakers.mts-tables: The ANSI/NETA MTS-2023 sections on low-voltage circuit breakers refer to Table 100.1 for insulation resistance, and the insulated-case and molded-case section also refers to Table 100.7 for inverse-time trip testing and to Table 100.8 for instantaneous trip tolerances.
- equip.low-voltage-circuit-breakers.osha-definition: 29 CFR 1910.399 defines a circuit breaker as a device designed to open and close a circuit by nonautomatic means and to open the circuit automatically on a predetermined overcurrent without damage to itself when properly applied within its rating.
Instrument classes
Insulation resistance tester
- instr.insulation-resistance-tester.ats-suitability: Section 5.2 of ANSI/NETA ATS-2025 deals with the suitability of test equipment, and section 5.3 deals with the calibration of test instruments.
- instr.insulation-resistance-tester.direct-reading: IEEE 43-2013 recognizes direct-reading megohmmeters, whether hand-cranked, battery-powered or rectifier-powered, and resistance bridges as instruments for measuring insulation resistance.
- instr.insulation-resistance-tester.protective-resistor: IEEE 43-2013 notes that when a low insulation resistance is measured, allowance is made for the voltage drop across the protective resistor of the test set.
- instr.insulation-resistance-tester.voltmeter-ammeter: IEEE 43-2013 also describes obtaining insulation resistance by calculation from a separately measured voltage and current, using a regulated direct-voltage supply, a voltmeter and a microammeter.
Low-resistance ohmmeter
- instr.low-resistance-ohmmeter.definition: A low-resistance ohmmeter is an instrument that measures small resistances, such as those of contacts, joints and bolted connections, by passing a known direct current through the object and measuring the voltage drop that the current produces across it.
- instr.low-resistance-ohmmeter.four-terminal: In a four-terminal measurement the current is supplied through one pair of leads and the voltage drop is sensed through a separate pair, so that the resistance of the leads and of the current connections is kept out of the result.
- instr.low-resistance-ohmmeter.four-terminal-source: A reference on impedance measurement published by the University of California, Berkeley physics laboratory describes the four-terminal technique as passing current through one pair of leads and measuring voltage on the other pair, which removes the error caused by the series impedance of the leads, and describes it as suited to low impedances.
- instr.low-resistance-ohmmeter.kelvin-term: The same reference notes that the term Kelvin connection is often used interchangeably with four-terminal, and names the Kelvin bridge as the most widely known four-terminal technique for precision direct-current resistance measurement.
- instr.low-resistance-ohmmeter.mts-calibration: Section 5.3 of ANSI/NETA MTS-2023 deals with the calibration of test instruments used in maintenance testing.
Certification and accreditation
NETA Accredited Company
- cert.neta-accredited-company.application: Accreditation as a NETA Accredited Company requires an application that is reviewed by the NETA association.
- cert.neta-accredited-company.definition: A NETA Accredited Company is an independent third-party firm accredited by NETA to provide testing, analysis and maintenance of electrical power systems, while NETA separately certifies the firm's individual technicians.
- cert.neta-accredited-company.employs-certified-technicians: NETA describes accredited companies as employing a team of certified technicians and support personnel, and it describes those certified technicians as holding NETA certification in electrical power systems testing at one of the three highest levels.Value: Level 2, Level 3 or Level 4.
- cert.neta-accredited-company.independence: NETA expects an accredited company to be free of competing service or manufacturing interests so that its test results remain unbiased.
- cert.neta-accredited-company.no-renewal-stated: NETA's accreditation overview describes accreditation as earned through an application process run by the association and does not describe a renewal, audit or re-evaluation cycle.
- cert.neta-accredited-company.safety-program: NETA requires an accredited company to maintain a safety program that it reviews and updates regularly.
- cert.neta-accredited-company.technician-requirement: An accredited company's technicians must hold NETA certification at one of the three upper certification levels in electrical power systems testing.Value: Level 2, Level 3 or Level 4.
Neta level 1
- cert.neta-level-1.requirements: A NETA Level 1 trainee needs a high school diploma or GED, is examined by the employer rather than by NETA, is not fully certified, and works under direct supervision of a higher-level technician.Value: Works under direct supervision of a Level 3 or Level 4 technician.
- cert.neta-level-1.title: NETA names Level 1 of its technician certification structure Trainee Technician.
Neta level 2
- cert.neta-level-2.examination: The NETA Level 2 examination is a closed-book, proctored multiple-choice test whose question count, time limit and passing score are stated in the datum value.Value: 100 multiple-choice questions; two-hour limit; passing score 410 on a scale of 200 to 500.
- cert.neta-level-2.requirements: NETA Level 2 certification requires meeting the Level 1 qualifications plus the safety training, electrical training and experience stated in the datum value.Value: 40 hours of safety training; 160 hours of electrical training; two years of experience.
- cert.neta-level-2.title: NETA names Level 2 of its technician certification structure Certified Assistant Technician.
Neta level 3
- cert.neta-level-3.examination: The NETA Level 3 examination has the same format as the Level 2 examination, with the question count, time limit and passing score stated in the datum value.Value: 100 closed-book proctored questions; two hours allowed; passing score 410.
- cert.neta-level-3.requirements: NETA Level 3 certification requires meeting the lower-level qualifications plus the cumulative safety training, electrical training and experience stated in the datum value.Value: 64 total hours of safety training; 400 total hours of electrical training; five years of experience.
- cert.neta-level-3.role: A NETA Level 3 technician supervises lower-level technicians, handles routine and moderately complex testing, keeps records and evaluates test data.Value: Supervises Level 1 and Level 2 technicians.
- cert.neta-level-3.title: NETA names Level 3 of its technician certification structure Certified Technician.
Neta level 4
- cert.neta-level-4.examination: The NETA Level 4 examination is a closed-book, proctored test whose question count, time limit and passing score are stated in the datum value.Value: 65 questions; two-hour limit; passing score 410.
- cert.neta-level-4.requirements: NETA Level 4 certification requires meeting the lower-level qualifications plus the cumulative safety training, electrical training and experience stated in the datum value.Value: 104 total hours of safety training; 600 total hours of electrical training; ten years of experience; Level 1, 2 and 3 qualifications met.
- cert.neta-level-4.role: A NETA Level 4 technician leads large projects and multiple crews, works independently, performs complex investigations and writes reports.
- cert.neta-level-4.title: NETA names Level 4 of its technician certification structure Certified Senior Technician.
NETA technician certification
- cert.neta-certification.employer-link: NETA certifies technicians who are employed by a NETA Accredited Company.
- cert.neta-certification.ett-standard: The ANSI/NETA ETT standard, in its 2026 edition, sets the experience, education and training requirements for electrical test technicians at Levels 2 through 4.
- cert.neta-certification.experience-credit: For the upper certification levels, a stated period of technical education in an electrical field counts as a limited credit toward the related-experience requirement under the NETA certification requirements.Value: Two or more years of technical education in an electrical field count as up to one year of related experience, for Levels 2 through 4.
- cert.neta-certification.recertification: NETA's public certification page says certified technicians must meet continuing education, training and experience requirements and points to the ANSI/NETA ETT standard for the details, without describing a recertification cycle itself.
- cert.neta-certification.structure: NETA certifies electrical testing technicians in four levels, Level 1 Trainee Technician through Level 4 Certified Senior Technician, and a technician must meet the requirements and pass the examination for each lower level before advancing.
Osha qualified person
- cert.osha-qualified-person.definition: Under 29 CFR 1910.399 for electrical work, a qualified person is one who has received training in, and has demonstrated skills and knowledge of, the construction and operation of electric equipment and installations and the hazards involved.Value: A person trained in, and demonstrated skilled and knowledgeable about, the construction and operation of electric equipment and installations and the hazards involved..
- cert.osha-qualified-person.training: Under 29 CFR 1910.332(b)(3), qualified persons permitted to work on or near exposed energized parts must be trained to identify exposed live parts, to determine their nominal voltage and to know the clearance distances that apply.
Quantities, units and formulas
Dissipation factor
- qty.dissipation-factor.ats-table: ANSI/NETA ATS-2025 Table 100.3 gives recommended dissipation factor or power factor values at a reference temperature for liquid-filled transformers, regulators and reactors.
- qty.dissipation-factor.definition: The dissipation factor of an insulation system under an alternating voltage is the tangent of its loss angle, which equals the ratio of the in-phase, resistive component of the current through the insulation to its quadrature, capacitive component.
- qty.dissipation-factor.mts-table: ANSI/NETA MTS-2023 Table 100.3 gives dissipation factor or power factor maintenance test values at a reference temperature for liquid-filled transformers, regulators and reactors.
- qty.dissipation-factor.power-factor: The power factor of an insulation system is the cosine of the phase angle between the applied alternating voltage and the resulting current, which equals the sine of the loss angle.
- qty.dissipation-factor.technav-dielectric-loss: IEEE Technology Navigator defines dielectric losses as the energy dissipated as heat when an alternating electric field is applied to an insulating material.
- qty.dissipation-factor.technav-loss-tangent: IEEE Technology Navigator describes the loss tangent, tan δ, as the principal measure of dielectric loss, where δ is the loss angle of the dielectric, and states that the dissipation factor is numerically equal to tan δ and expresses the ratio of resistive to reactive power in the material.
- qty.dissipation-factor.unit-one: The NIST Guide to the SI notes that the symbol for the derived unit one is generally omitted when values of dimensionless quantities are stated.
Ohm
- qty.ohm.ampere: NIST lists the ampere, symbol A, as the SI base unit of electric current.Value: A.
- qty.ohm.base-units: Expressed in SI base units, the ohm equals the square meter times the kilogram divided by the cube of the second and the square of the ampere.Value: m2 kg s-3 A-2.
- qty.ohm.definition: In the NIST Guide to the SI, the ohm, symbol Ω, is the SI coherent derived unit of electric resistance and is expressed in other SI units as the volt per ampere.Value: V/A.
- qty.ohm.megohm: Applying the SI prefix mega, symbol M, which denotes the factor one million, to the ohm gives the megohm, equal to one million ohms.Value: 1,000,000 Ω.
- qty.ohm.microhm: Applying the SI prefix micro, symbol μ, which denotes the factor one millionth, to the ohm gives the microhm, equal to one millionth of an ohm.Value: 0.000001 Ω.
- qty.ohm.siemens: In the NIST Guide to the SI, the siemens, symbol S, is the SI coherent derived unit of electric conductance and is expressed in other SI units as the ampere per volt, the reciprocal of the ohm.Value: A/V.
- qty.ohm.volt: In the NIST Guide to the SI, the volt, symbol V, is the SI coherent derived unit of electric potential difference and is expressed in other SI units as the watt per ampere.Value: W/A.
Glossary
Dielectric absorption ratio
- gloss.dielectric-absorption-ratio.definition: The dielectric absorption ratio is the ratio of two insulation resistance readings taken a short time apart early in a direct-voltage test, the later reading divided by the earlier one.
Polarization index
- gloss.polarization-index.definition: The polarization index is the ratio of two insulation resistance readings taken at two times after a direct voltage is applied, the later reading divided by the earlier one.
Organizations
IEEE Standards Association (IEEE SA)
- org.ieee-sa.address: IEEE SA gives its address as 445 Hoes Lane in Piscataway, New Jersey, and names the Institute of Electrical and Electronics Engineers, Inc. as copyright holder of its documents.
- org.ieee-sa.founded: The IEEE Standards Association was formed in 1998 from the former standards activities of IEEE.
- org.ieee-sa.ieee-founded: IEEE was formed in 1963 through the merger of the American Institute of Electrical Engineers and the Institute of Radio Engineers.
- org.ieee-sa.role: IEEE SA operates within IEEE as a consensus-building organization that develops standards and supports standards-related collaboration.
Nema
- org.nema.publication-store: NEMA offers more than 800 standards and technical documents through its Publication Store.
- org.nema.role: NEMA represents manufacturers in the electroindustry, whose products serve the power grid, building systems and distributed energy and storage.
NETA (InterNational Electrical Testing Association)
- org.neta.ansi-developer: NETA became an American National Standards developer in 1996.
- org.neta.first-specification: NETA published its first testing specification document in 1973.
- org.neta.founded: NETA, the InterNational Electrical Testing Association, was founded in 1972.
- org.neta.headquarters: NETA lists its headquarters in Portage, Michigan.
- org.neta.role: NETA develops consensus standards for installing and maintaining power systems, accredits electrical testing companies and certifies electrical testing technicians.
Osha
- org.osha.enabling-act: The Occupational Safety and Health Act of 1970 was enacted as a public law on the date stated in the datum value.Value: Public Law 91-596.
- org.osha.mission: OSHA works to keep workers in safe and healthful conditions by setting and enforcing standards, enforcing anti-retaliation protections, and providing training, outreach, education and assistance.
- org.osha.parent-agency: OSHA is part of the United States Department of Labor and is led by the Assistant Secretary of Labor for Occupational Safety and Health.