Data record tests.energization-checks.equipment.commissioning-hv.commissioning
Verified 2026-10-29 Confidence: High
Energization Checks is specified for high-voltage and extra-high-voltage systems in commissioning testing at clause 7.3.B.5 of ANSI/NETA ECS-2024. The energization clause calls for the steps of the written energization plan to be followed and documented.
Value: high-voltage and extra-high-voltage systems
| Step | Item | Detail |
|---|---|---|
| Source | ANSI/NETA ECS-2024 | Licensed standard, clause 7.3.B.5 |
| Data record | tests.energization-checks.equipment.commissioning-hv.commissioning | Verified 2026-10-29 |
| Entry | Energization Checks | No revisions |
- Subject
- Energization Checks (Test methods)
- Kind
- Equipment fact
- Source
- ANSI/NETA ECS-2024, clause 7.3.B.5, Standard for Electrical Commissioning Specifications, NETA. Publisher page for ANSI/NETA ECS-2024Publisher information page
- Also stated in
- Stated independently by FIST 4-7, section 13.13.1.2, page 273 (August 2023).
Read the reference passage
13.13.1.2 Open Circuit Saturation, Waveform Deviation, and Telephone Interference Factor
"After the generator voltage test is complete, this test can be extended to slowly increase the voltage in the main transformer for the first time. This is done by opening the high voltage disconnect switch, closing the generator breaker, and slowly increasing the voltage on the main transformer up to the rated voltage. This slow increase is usually recommended for large transformers for the first energization."
FIST 4-7, section 13.13.1.2, page 273, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- Stated independently by FIST 4-7, section 13.13.1.2, page 273 (August 2023).
History
| Date | Change |
|---|---|
| 2026-10-29 | created |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Data record tests.energization-checks.equipment.commissioning-hv.commissioning." Electrical Testing Reference. 2026-10-29. https://www.electricaltestingreference.com/data/tests.energization-checks.equipment.commissioning-hv.commissioning/.
Electrical Testing Reference, Data record tests.energization-checks.equipment.commissioning-hv.commissioning (Oct. 29, 2026), https://www.electricaltestingreference.com/data/tests.energization-checks.equipment.commissioning-hv.commissioning/.
@misc{etr-data-tests-energization-checks-equipment-commissioning-hv-commissioning,
title = {Data record tests.energization-checks.equipment.commissioning-hv.commissioning},
howpublished = {\url{https://www.electricaltestingreference.com/data/tests.energization-checks.equipment.commissioning-hv.commissioning/}},
organization = {Electrical Testing Reference},
publisher = {Electrical Testing Reference},
year = {2026},
note = {last substantive change 2026-10-29}
}{{cite web |title=Data record tests.energization-checks.equipment.commissioning-hv.commissioning |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.energization-checks.equipment.commissioning-hv.commissioning/ |date=2026-10-29 |access-date=}}