Data record tests.energization-checks.ieee1547-1.enter-service-checks

Verified 2026-10-24 Confidence: High

The on-off commissioning test of clause 8.2.3.1 in IEEE 1547.1-2020 verifies that the DER does not enter service while the permit signal is disabled, that it enters service with the permit enabled only when voltage and frequency are inside the enter-service window of IEEE 1547-2018, and that once voltage and frequency have returned the DER waits out the enter-service delay before reconnecting.

ProvenanceIEEE 1547.1-2020 supports data record tests.energization-checks.ieee1547-1.enter-service-checks, which is cited on the entry Energization Checks.SOURCEIEEE 1547.1-2020IEEE 1547.1-2020Licensed standard, clause 8.2.3.1DATA RECORDtests.energization-checks.ieee1547-1.enter-service-checkstests.energization-check..Verified 2026-10-24ENTRYEnergization ChecksEnergization ChecksNo revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceIEEE 1547.1-2020Licensed standard, clause 8.2.3.1
Data recordtests.energization-checks.ieee1547-1.enter-service-checksVerified 2026-10-24
EntryEnergization ChecksNo revisions
Subject
Energization Checks (Test methods)
Kind
Method fact
Source
IEEE 1547.1-2020, clause 8.2.3.1, Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources, IEEE.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-24created
2026-10-24revised
2026-10-24review_status unreviewed -> software_reviewed

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.energization-checks.ieee1547-1.enter-service-checks." Electrical Testing Reference. 2026-10-24. https://www.electricaltestingreference.com/data/tests.energization-checks.ieee1547-1.enter-service-checks/.