Installation evaluation IE1 in clause 8.2.2.1 of IEEE 1547.1-2020 checks that the installation is complete, that the equipment nameplates match the design evaluation, that the installation follows the submitted electrical design, that grounding follows the interconnection agreement, that the isolation device has been visually inspected and operated, and that corrective actions are complete.
| Step | Item | Detail |
|---|---|---|
| Source | IEEE 1547.1-2020 | Licensed standard, clause 8.2.2.1 |
| Data record | tests.energization-checks.ieee1547-1.installation-evaluation | Verified 2026-10-24 |
| Entry | Energization Checks | No revisions |
- Subject
- Energization Checks (Test methods)
- Kind
- Method fact
- Source
- IEEE 1547.1-2020, clause 8.2.2.1, Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources, IEEE.
History
| Date | Change |
|---|---|
| 2026-10-24 | created |
| 2026-10-24 | revised |
| 2026-10-24 | review_status unreviewed -> software_reviewed |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Data record tests.energization-checks.ieee1547-1.installation-evaluation." Electrical Testing Reference. 2026-10-24. https://www.electricaltestingreference.com/data/tests.energization-checks.ieee1547-1.installation-evaluation/.
Electrical Testing Reference, Data record tests.energization-checks.ieee1547-1.installation-evaluation (Oct. 24, 2026), https://www.electricaltestingreference.com/data/tests.energization-checks.ieee1547-1.installation-evaluation/.
@misc{etr-data-tests-energization-checks-ieee1547-1-installation-evaluation,
title = {Data record tests.energization-checks.ieee1547-1.installation-evaluation},
howpublished = {\url{https://www.electricaltestingreference.com/data/tests.energization-checks.ieee1547-1.installation-evaluation/}},
organization = {Electrical Testing Reference},
publisher = {Electrical Testing Reference},
year = {2026},
note = {last substantive change 2026-10-24}
}{{cite web |title=Data record tests.energization-checks.ieee1547-1.installation-evaluation |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.energization-checks.ieee1547-1.installation-evaluation/ |date=2026-10-24 |access-date=}}