Data record tests.insulation-resistance.equipment.capacitor.maintenance

Verified 2026-10-13 Confidence: Medium

Provenance pending: the source of this record has not yet been confirmed as official.

Insulation Resistance is specified for capacitors in maintenance testing at clause 7.20.1.B.2 of ANSI/NETA MTS-2023.

Value: capacitors

ProvenanceANSI/NETA MTS-2023 supports data record tests.insulation-resistance.equipment.capacitor.maintenance, which is cited on the entry Insulation Resistance.SOURCEANSI/NETA MTS-2023ANSI/NETA MTS-2023Licensed standard, clause 7.20.1.B.2DATA RECORDtests.insulation-resistance.equipment.capacitor.maintenancetests.insulation-resista..Verified 2026-10-13ENTRYInsulation ResistanceInsulation Resistance1 revision
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceANSI/NETA MTS-2023Licensed standard, clause 7.20.1.B.2
Data recordtests.insulation-resistance.equipment.capacitor.maintenanceVerified 2026-10-13
EntryInsulation Resistance1 revision
Subject
Insulation Resistance (Test methods)
Kind
Equipment fact
Source
ANSI/NETA MTS-2023, clause 7.20.1.B.2, Maintenance Testing Specifications for Electrical Power Equipment and Systems, NETA. Publisher page for ANSI/NETA MTS-2023Publisher information page
Also stated in
  • Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-13.b, PDF page 146, printed 13-3, item (2)(a); its interpretation (failure means an internal flashover; replace) is on PDF page 147 (29 November 1996).
    Read the reference passage

    13-13.b(2)(a). Procedure

    "With the capacitor unit insulated from ground, apply a voltage equal to twice rated voltage between case and terminals (all terminals connected together) in accordance with figure 13-2. Voltage should be applied for one minute, with the test circuit fused and containing sufficient impedance to limit the current, should the capacitor under test be shorted."

    TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-13.b, PDF page 146, printed 13-3, item (2)(a); its interpretation (failure means an internal flashover; replace) is on PDF page 147, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082

    The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-13created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.insulation-resistance.equipment.capacitor.maintenance." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/data/tests.insulation-resistance.equipment.capacitor.maintenance/.
Electrical Testing Reference, Data record tests.insulation-resistance.equipment.capacitor.maintenance (Oct. 13, 2026), https://www.electricaltestingreference.com/data/tests.insulation-resistance.equipment.capacitor.maintenance/.
@misc{etr-data-tests-insulation-resistance-equipment-capacitor-maintenance,
  title = {Data record tests.insulation-resistance.equipment.capacitor.maintenance},
  howpublished = {\url{https://www.electricaltestingreference.com/data/tests.insulation-resistance.equipment.capacitor.maintenance/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-13}
}
{{cite web |title=Data record tests.insulation-resistance.equipment.capacitor.maintenance |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.insulation-resistance.equipment.capacitor.maintenance/ |date=2026-10-13 |access-date=}}