Data record tests.phase-rotation-and-phasing.equipment.commissioning-system.commissioning

Verified 2026-11-02 Confidence: High

Phase Rotation and Phasing is specified for low-voltage systems in commissioning testing at clause 7.1.B.9 of ANSI/NETA ECS-2024. The energization clause calls for the equipment phasing to be verified.

Value: low-voltage systems

ProvenanceANSI/NETA ECS-2024 supports data record tests.phase-rotation-and-phasing.equipment.commissioning-system.commissioning, which is cited on the entry Phase Rotation and Phasing.SOURCEANSI/NETA ECS-2024ANSI/NETA ECS-2024Licensed standard, clause 7.1.B.9DATA RECORDtests.phase-rotation-and-phasing.equipment.commissioning-system.commissioningtests.phase-rotation-and..Verified 2026-11-02ENTRYPhase Rotation and PhasingPhase Rotation and PhasingNo revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceANSI/NETA ECS-2024Licensed standard, clause 7.1.B.9
Data recordtests.phase-rotation-and-phasing.equipment.commissioning-system.commissioningVerified 2026-11-02
EntryPhase Rotation and PhasingNo revisions
Subject
Phase Rotation and Phasing (Test methods)
Kind
Equipment fact
Source
ANSI/NETA ECS-2024, clause 7.1.B.9, Standard for Electrical Commissioning Specifications, NETA. Publisher page for ANSI/NETA ECS-2024Publisher information page
Also stated in
  • Stated independently by UFM 3-560-01, Appendix C, section 11.0, steps 7 to 9, page 153 (13 March 2026).
    Read the reference passage

    Appendix C Sample SOP - Voltage and Current Diagnostic Measurements. 11.0 Low-Voltage Phase Rotation Checks

    "7. If possible, deenergize the circuit or equipment before connecting the phase rotation meter leads. Attach the leads of the phase rotation meter to the exposed energized conductors. 8. Press the meter's actuating button, check for proper phase rotation, and release. 9. If possible, deenergize the circuit or equipment before disconnecting the phase rotation meter leads. Remove the leads."

    UFM 3-560-01, Appendix C, section 11.0, steps 7 to 9, page 153, 13 March 2026. Agency copy of UFM 3-560-01

    The current standard governs; this passage is a public-domain description of the practice dated 13 March 2026.

History

Every recorded change to this data record, oldest first.
DateChange
2026-11-02created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.phase-rotation-and-phasing.equipment.commissioning-system.commissioning." Electrical Testing Reference. 2026-11-02. https://www.electricaltestingreference.com/data/tests.phase-rotation-and-phasing.equipment.commissioning-system.commissioning/.