Data record tests.contact-resistance.governed-by.ansi-neta-ats

Verified 2026-10-13 Confidence: Medium

Provenance pending: the source of this record has not yet been confirmed as official.

Contact Resistance is addressed in ANSI/NETA ATS-2025.

ProvenanceANSI/NETA ATS-2025 supports data record tests.contact-resistance.governed-by.ansi-neta-ats, which is cited on the entry Contact Resistance.SOURCEANSI/NETA ATS-2025ANSI/NETA ATS-2025Licensed standard, clause 7.22.3.B.4DATA RECORDtests.contact-resistance.governed-by.ansi-neta-atstests.contact-resistance..Verified 2026-10-13ENTRYContact ResistanceContact ResistanceNo revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceANSI/NETA ATS-2025Licensed standard, clause 7.22.3.B.4
Data recordtests.contact-resistance.governed-by.ansi-neta-atsVerified 2026-10-13
EntryContact ResistanceNo revisions
Subject
Contact Resistance (Test methods)
Kind
Method fact
Source
ANSI/NETA ATS-2025, clause 7.22.3.B.4, Acceptance Testing Specifications for Electrical Power Equipment and Systems, NETA. Publisher page for ANSI/NETA ATS-2025Publisher information page
Also stated in
  • FIST 4-7, section 6.1.10.1, pages 43 to 44 (August 2023).
    Read the reference passage

    6.1.10.1 Contact Resistance Test

    "When draw-out type circuit breakers are provided, contact resistance measurements should be conducted with the breaker removed from its cubicle fully isolated from energized circuits ideally placed on a sturdy work bench or cart. The breaker should be cycled open and closed a few times to verify the repeatability of contact resistance and to work lubricants in the operating mechanism. Note that contact grease should not be applied to arcing contacts, otherwise arcing contact resistance may increase over time."

    FIST 4-7, section 6.1.10.1, pages 43 to 44, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-13created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.contact-resistance.governed-by.ansi-neta-ats." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/data/tests.contact-resistance.governed-by.ansi-neta-ats/.
Electrical Testing Reference, Data record tests.contact-resistance.governed-by.ansi-neta-ats (Oct. 13, 2026), https://www.electricaltestingreference.com/data/tests.contact-resistance.governed-by.ansi-neta-ats/.
@misc{etr-data-tests-contact-resistance-governed-by-ansi-neta-ats,
  title = {Data record tests.contact-resistance.governed-by.ansi-neta-ats},
  howpublished = {\url{https://www.electricaltestingreference.com/data/tests.contact-resistance.governed-by.ansi-neta-ats/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-13}
}
{{cite web |title=Data record tests.contact-resistance.governed-by.ansi-neta-ats |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.contact-resistance.governed-by.ansi-neta-ats/ |date=2026-10-13 |access-date=}}