Continuity and Shield Continuity is specified for shielded medium-voltage and high-voltage cables in maintenance testing at clause 7.3.3.B.3 of ANSI/NETA MTS-2023.

Value: shielded medium-voltage and high-voltage cables

ProvenanceANSI/NETA MTS-2023 supports data record tests.continuity-and-shield-continuity.equipment.cable.maintenance, which is cited on the entry Continuity and Shield Continuity.SOURCEANSI/NETA MTS-2023ANSI/NETA MTS-2023Licensed standard, clause 7.3.3.B.3DATA RECORDtests.continuity-and-shield-continuity.equipment.cable.maintenancetests.continuity-and-shi..Verified 2026-10-13ENTRYContinuity and Shield ContinuityContinuity and Shield Co..No revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceANSI/NETA MTS-2023Licensed standard, clause 7.3.3.B.3
Data recordtests.continuity-and-shield-continuity.equipment.cable.maintenanceVerified 2026-10-13
EntryContinuity and Shield ContinuityNo revisions
Subject
Continuity and Shield Continuity (Test methods)
Kind
Equipment fact
Source
ANSI/NETA MTS-2023, clause 7.3.3.B.3, Maintenance Testing Specifications for Electrical Power Equipment and Systems, NETA. Publisher page for ANSI/NETA MTS-2023Publisher information page
Also stated in
  • Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-29.c, PDF page 84, printed 5-17, the ellipsis drops the lead sentence of the list and the first two sentences of item (1) (29 November 1996).
    Read the reference passage

    5-29.c. Effectiveness of power factor tests

    "This test can be performed at any voltage that does not exceed the line-to-ground voltage rating of the cable. [...] The shield should be grounded for the test only at the end where the test connections are made. An increase in power factor can indicate discontinuities or breaks in the shield."

    TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-29.c, PDF page 84, printed 5-17, the ellipsis drops the lead sentence of the list and the first two sentences of item (1), 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082

    The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-13created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.continuity-and-shield-continuity.equipment.cable.maintenance." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/data/tests.continuity-and-shield-continuity.equipment.cable.maintenance/.
Electrical Testing Reference, Data record tests.continuity-and-shield-continuity.equipment.cable.maintenance (Oct. 13, 2026), https://www.electricaltestingreference.com/data/tests.continuity-and-shield-continuity.equipment.cable.maintenance/.
@misc{etr-data-tests-continuity-and-shield-continuity-equipment-cable-maintenance,
  title = {Data record tests.continuity-and-shield-continuity.equipment.cable.maintenance},
  howpublished = {\url{https://www.electricaltestingreference.com/data/tests.continuity-and-shield-continuity.equipment.cable.maintenance/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-13}
}
{{cite web |title=Data record tests.continuity-and-shield-continuity.equipment.cable.maintenance |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.continuity-and-shield-continuity.equipment.cable.maintenance/ |date=2026-10-13 |access-date=}}