Data record tests.control-and-functional-verification.equipment.commissioning-system.commissioning
Verified 2026-10-29 Confidence: High
Control and Functional Verification is specified for low-voltage systems in commissioning testing at clause 7.1.A.30 of ANSI/NETA ECS-2024. The pre-energization clause calls for the operation of transfer schemes to be verified.
Value: low-voltage systems
| Step | Item | Detail |
|---|---|---|
| Source | ANSI/NETA ECS-2024 | Licensed standard, clause 7.1.A.30 |
| Data record | tests.control-and-functional-verification.equipment.commissioning-system.commissioning | Verified 2026-10-29 |
| Entry | Control and Functional Verification | No revisions |
- Subject
- Control and Functional Verification (Test methods)
- Kind
- Equipment fact
- Source
- ANSI/NETA ECS-2024, clause 7.1.A.30, Standard for Electrical Commissioning Specifications, NETA. Publisher page for ANSI/NETA ECS-2024Publisher information page
- Also stated in
- FIST 4-7, section 6.1.49.2, page 139 (August 2023).
Read the reference passage
6.1.49.2 Bus Transfer Test
"Bus transfer tests should be conducted prior to energization. When draw-out bus transfer breakers are provided, preliminary tests should be conducted with both breakers in the "test position"."
FIST 4-7, section 6.1.49.2, page 139, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- FIST 4-7, section 6.1.49.2, page 139 (August 2023).
History
| Date | Change |
|---|---|
| 2026-10-29 | created |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Data record tests.control-and-functional-verification.equipment.commissioning-system.commissioning." Electrical Testing Reference. 2026-10-29. https://www.electricaltestingreference.com/data/tests.control-and-functional-verification.equipment.commissioning-system.commissioning/.
Electrical Testing Reference, Data record tests.control-and-functional-verification.equipment.commissioning-system.commissioning (Oct. 29, 2026), https://www.electricaltestingreference.com/data/tests.control-and-functional-verification.equipment.commissioning-system.commissioning/.
@misc{etr-data-tests-control-and-functional-verification-equipment-commissioning-system-commissioning,
title = {Data record tests.control-and-functional-verification.equipment.commissioning-system.commissioning},
howpublished = {\url{https://www.electricaltestingreference.com/data/tests.control-and-functional-verification.equipment.commissioning-system.commissioning/}},
organization = {Electrical Testing Reference},
publisher = {Electrical Testing Reference},
year = {2026},
note = {last substantive change 2026-10-29}
}{{cite web |title=Data record tests.control-and-functional-verification.equipment.commissioning-system.commissioning |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.control-and-functional-verification.equipment.commissioning-system.commissioning/ |date=2026-10-29 |access-date=}}