Control and Functional Verification

Updated 2026-10-29

RelationshipsControl and Functional Verification is governed by ANSI/NETA ATS-2025, ANSI/NETA MTS-2023, FAA AC 150/5345-10H and applies to no listed equipment.ANSI/NETA ATS-2025 Standard for Acceptance Testing SpecificationsANSI/NETA ATS-2025ANSI/NETA MTS-2023 Standard for Maintenance Testing SpecificationsANSI/NETA MTS-2023FAA AC 150/5345-10HFAA AC 150/5345-10HControl and Functional VerificationControl and Functional Verification
Relationships. Governing standards on the left, equipment classes the test applies to on the right, as recorded for this entry.
Relationships: relationships recorded for this entry.
RelationshipEntry
Governing standardANSI/NETA ATS-2025 (ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications)
Governing standardANSI/NETA MTS-2023 (ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications)
Governing standardFAA AC 150/5345-10H

Data records

Sources

  • ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.22.3.B.5; clause 7.4.B.6; clause 7.17.B.7; clause 7.8.B.11; clause 7.22.2.B.5. Held as: Purchased single-user copy. Publisher page for ANSI/NETA ATS-2025Publisher information page
  • ANSI/NETA ECS-2024, Standard for Electrical Commissioning Specifications, 2024 edition, NETA. Cited: clause 7.1.A.30. Held as: Purchased single-user copy. Publisher page for ANSI/NETA ECS-2024Publisher information page
  • ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.22.3.B.4; clause 7.4.B.6; clause 7.17.B.7; clause 7.8.B.11; clause 7.22.2.B.5. Held as: Purchased single-user copy. Publisher page for ANSI/NETA MTS-2023Publisher information page
  • Electrical Testing Reference editorial taxonomy, Electrical Testing Reference editorial taxonomy of test methods, 2026-10 edition, Electrical Testing Reference. Held as: Own observation.
  • FAA AC 150/5345-10H, AC 150/5345-10H, H edition, Federal Aviation Administration. Cited: clause 3.3.7(b). Agency document. Held as: Government work. Agency copy of FAA AC 150/5345-10H

Also stated in

  • FIST 4-7, section 6.1.4.1, page 28 (August 2023).
    Read the reference passage

    6.1.4.1 Energized Auxiliary Power Tests

    "After the visual and mechanical inspections, the next step is to perform an electrical test. This test should be performed in accordance with the manufacturer's procedure."

    FIST 4-7, section 6.1.4.1, page 28, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 6.1.49.2, page 139 (August 2023).
    Read the reference passage

    6.1.49.2 Bus Transfer Test

    "Bus transfer tests should be conducted prior to energization. When draw-out bus transfer breakers are provided, preliminary tests should be conducted with both breakers in the "test position"."

    FIST 4-7, section 6.1.49.2, page 139, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 6.1.13.1, page 55 (August 2023).
    Read the reference passage

    6.1.13.1 Circuitry Checkout

    "The checkout confirms that the circuit is in accordance with the schematic diagram. Each element in the schematic is verified to be in place and properly wired. Visual inspection is used to verify equipment nameplates, location, and quality of the wiring. Continuity testing is employed to verify proper wiring. Calibration and timing of the individual circuit elements is completed during this phase of the project."

    FIST 4-7, section 6.1.13.1, page 55, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

Obtaining the documents

Changelog (17 entries)
DateRevisionChange
2026-10-29created (tests.control-and-functional-verification.equipment.commissioning-system.commissioning)
2026-10-13created (tests.control-and-functional-verification.equipment.ats-transfer.acceptance)
2026-10-13created (tests.control-and-functional-verification.equipment.ats-transfer.maintenance)
2026-10-13created (tests.control-and-functional-verification.equipment.busway.acceptance)
2026-10-13created (tests.control-and-functional-verification.equipment.busway.maintenance)
2026-10-13created (tests.control-and-functional-verification.equipment.drive.acceptance)
2026-10-13created (tests.control-and-functional-verification.equipment.drive.maintenance)
2026-10-13created (tests.control-and-functional-verification.equipment.network-protector.acceptance)
2026-10-13edited (tests.control-and-functional-verification.equipment.network-protector.acceptance)
2026-10-13created (tests.control-and-functional-verification.equipment.network-protector.maintenance)
2026-10-13edited (tests.control-and-functional-verification.equipment.network-protector.maintenance)
2026-10-13created (tests.control-and-functional-verification.equipment.ups.acceptance)
2026-10-13created (tests.control-and-functional-verification.equipment.ups.maintenance)
2026-10-13created (tests.control-and-functional-verification.governed-by.ansi-neta-ats)
2026-10-13created (tests.control-and-functional-verification.governed-by.ansi-neta-mts)
2026-10-13created (tests.control-and-functional-verification.governed-by.faa-ac-150-5345-10h)
2026-10-13created (tests.control-and-functional-verification.title)

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Control and Functional Verification." Electrical Testing Reference. 2026-10-29. https://www.electricaltestingreference.com/tests/control-and-functional-verification/.
Electrical Testing Reference, Control and Functional Verification (Oct. 29, 2026), https://www.electricaltestingreference.com/tests/control-and-functional-verification/.
@misc{etr-tests-control-and-functional-verification,
  title = {Control and Functional Verification},
  howpublished = {\url{https://www.electricaltestingreference.com/tests/control-and-functional-verification/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-29}
}
{{cite web |title=Control and Functional Verification |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/tests/control-and-functional-verification/ |date=2026-10-29 |access-date=}}