Control and Functional Verification is addressed in ANSI/NETA ATS-2025.

ProvenanceANSI/NETA ATS-2025 supports data record tests.control-and-functional-verification.governed-by.ansi-neta-ats, which is cited on the entry Control and Functional Verification.SOURCEANSI/NETA ATS-2025ANSI/NETA ATS-2025Licensed standard, clause 7.22.3.B.5DATA RECORDtests.control-and-functional-verification.governed-by.ansi-neta-atstests.control-and-functi..Verified 2026-10-13ENTRYControl and Functional VerificationControl and Functional V..No revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceANSI/NETA ATS-2025Licensed standard, clause 7.22.3.B.5
Data recordtests.control-and-functional-verification.governed-by.ansi-neta-atsVerified 2026-10-13
EntryControl and Functional VerificationNo revisions
Subject
Control and Functional Verification (Test methods)
Kind
Method fact
Source
ANSI/NETA ATS-2025, clause 7.22.3.B.5, Acceptance Testing Specifications for Electrical Power Equipment and Systems, NETA. Publisher page for ANSI/NETA ATS-2025Publisher information page
Also stated in
  • FIST 4-7, section 6.1.13.1, page 55 (August 2023).
    Read the reference passage

    6.1.13.1 Circuitry Checkout

    "The checkout confirms that the circuit is in accordance with the schematic diagram. Each element in the schematic is verified to be in place and properly wired. Visual inspection is used to verify equipment nameplates, location, and quality of the wiring. Continuity testing is employed to verify proper wiring. Calibration and timing of the individual circuit elements is completed during this phase of the project."

    FIST 4-7, section 6.1.13.1, page 55, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-13created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.control-and-functional-verification.governed-by.ansi-neta-ats." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/data/tests.control-and-functional-verification.governed-by.ansi-neta-ats/.
Electrical Testing Reference, Data record tests.control-and-functional-verification.governed-by.ansi-neta-ats (Oct. 13, 2026), https://www.electricaltestingreference.com/data/tests.control-and-functional-verification.governed-by.ansi-neta-ats/.
@misc{etr-data-tests-control-and-functional-verification-governed-by-ansi-neta-ats,
  title = {Data record tests.control-and-functional-verification.governed-by.ansi-neta-ats},
  howpublished = {\url{https://www.electricaltestingreference.com/data/tests.control-and-functional-verification.governed-by.ansi-neta-ats/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-13}
}
{{cite web |title=Data record tests.control-and-functional-verification.governed-by.ansi-neta-ats |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.control-and-functional-verification.governed-by.ansi-neta-ats/ |date=2026-10-13 |access-date=}}