Data record tests.dc-system-ground-detection.governed-by.ansi-neta-ats

Verified 2026-10-13 Confidence: Medium

Provenance pending: the source of this record has not yet been confirmed as official.

DC System Ground Detection is addressed in ANSI/NETA ATS-2025.

ProvenanceANSI/NETA ATS-2025 supports data record tests.dc-system-ground-detection.governed-by.ansi-neta-ats, which is cited on the entry DC System Ground Detection.SOURCEANSI/NETA ATS-2025ANSI/NETA ATS-2025Licensed standard, clause 7.18.1.1.B.7DATA RECORDtests.dc-system-ground-detection.governed-by.ansi-neta-atstests.dc-system-ground-d..Verified 2026-10-13ENTRYDC System Ground DetectionDC System Ground DetectionNo revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceANSI/NETA ATS-2025Licensed standard, clause 7.18.1.1.B.7
Data recordtests.dc-system-ground-detection.governed-by.ansi-neta-atsVerified 2026-10-13
EntryDC System Ground DetectionNo revisions
Subject
DC System Ground Detection (Test methods)
Kind
Method fact
Source
ANSI/NETA ATS-2025, clause 7.18.1.1.B.7, Acceptance Testing Specifications for Electrical Power Equipment and Systems, NETA. Publisher page for ANSI/NETA ATS-2025Publisher information page
Also stated in
  • FIST 4-7, section 6.1.20.1, page 64 (August 2023).
    Read the reference passage

    6.1.20.1 Ground Isolation Test

    "The dc distribution centers, and main power cables should be tested for insulation resistance before connection of the battery and charger. Once all of the main power interconnections are made, the complete system should be checked for voltage balance with respect to ground. This verifies that the dc power system is properly isolated from ground before the branch circuits are energized."

    FIST 4-7, section 6.1.20.1, page 64, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-13created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.dc-system-ground-detection.governed-by.ansi-neta-ats." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/data/tests.dc-system-ground-detection.governed-by.ansi-neta-ats/.
Electrical Testing Reference, Data record tests.dc-system-ground-detection.governed-by.ansi-neta-ats (Oct. 13, 2026), https://www.electricaltestingreference.com/data/tests.dc-system-ground-detection.governed-by.ansi-neta-ats/.
@misc{etr-data-tests-dc-system-ground-detection-governed-by-ansi-neta-ats,
  title = {Data record tests.dc-system-ground-detection.governed-by.ansi-neta-ats},
  howpublished = {\url{https://www.electricaltestingreference.com/data/tests.dc-system-ground-detection.governed-by.ansi-neta-ats/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-13}
}
{{cite web |title=Data record tests.dc-system-ground-detection.governed-by.ansi-neta-ats |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.dc-system-ground-detection.governed-by.ansi-neta-ats/ |date=2026-10-13 |access-date=}}