DC System Ground Detection
Updated 2026-10-13
| Relationship | Entry |
|---|---|
| Governing standard | ANSI/NETA ATS-2025 (ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications) |
| Governing standard | ANSI/NETA MTS-2023 (ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications) |
| Governing standard | NEMA PE 5-1997 (R2003) (Utility-Type Battery Chargers) |
Data records
- DC System Ground Detection is specified for solar photovoltaic systems in acceptance testing at clause 7.29.B.8 of ANSI/NETA ATS-2025. Value: solar photovoltaic systems.
- DC System Ground Detection is addressed in ANSI/NETA ATS-2025.
- DC System Ground Detection is addressed in ANSI/NETA MTS-2023.
- DC System Ground Detection is addressed in IEEE 946-2020.
- The test method is named DC System Ground Detection. Value: DC System Ground Detection.
Elsewhere in the family
- DC System Ground Detection more on this entry on Battery Testing Reference
- Battery Charger Performance related entry on Battery Testing Reference
- Battery Capacity Load Test related entry on Battery Testing Reference
- Battery Cell Voltage and Specific Gravity related entry on Battery Testing Reference
- Battery Intercell Connection Resistance related entry on Battery Testing Reference
- Battery Internal Ohmic Measurement related entry on Battery Testing Reference
- IEEE Recommended Practice for the Design of DC Power Systems for Stationary Applications related entry on Battery Testing Reference
Sources
- ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.29.B.8; clause 7.18.1.1.B.7. Held as: Purchased single-user copy. Publisher page for ANSI/NETA ATS-2025Publisher information page
- ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.18.1.1.B.7. Held as: Purchased single-user copy. Publisher page for ANSI/NETA MTS-2023Publisher information page
- Electrical Testing Reference editorial taxonomy, Electrical Testing Reference editorial taxonomy of test methods, 2026-10 edition, Electrical Testing Reference. Held as: Own observation.
- IEEE 946-2020, Design of DC Auxiliary Power Systems for Generating Stations, 2020 edition, IEEE. Cited: clause 9.1. Held as: Purchased single-user copy. Publisher page for IEEE 946-2020Publisher information page
Also stated in
- FIST 4-7, section 6.1.20.1, page 64 (August 2023).
Read the reference passage
6.1.20.1 Ground Isolation Test
"The dc distribution centers, and main power cables should be tested for insulation resistance before connection of the battery and charger. Once all of the main power interconnections are made, the complete system should be checked for voltage balance with respect to ground. This verifies that the dc power system is properly isolated from ground before the branch circuits are energized."
FIST 4-7, section 6.1.20.1, page 64, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- FIST 3-6, section 9.1, page 95 (April 2020).
Read the reference passage
9.1 General
"DC systems in Reclamation are typically grounded or ungrounded depending on their application. Positive ground DC systems are often implemented on telecommunication systems (typically 48VDC) to provide cathodic protection to buried wires. Wireless communication equipment (typically 24 or 48 VDC) often utilize a negative ground. Ground faults on these grounded systems will be detected by DC overcurrent protective devices."
FIST 3-6, section 9.1, page 95, April 2020. Agency copy of FIST 3-6
The current standard governs; this passage is a public-domain description of the practice dated April 2020.
- FIST 4-7, section 6.1.19.1, page 63 (August 2023).
Read the reference passage
6.1.19.1 Polarity (DC) Test
"Readings between the positive and negative lead of a battery system or power supply should yield the full rated voltage, for example 24 Vdc or 125 Vdc. However, as most Reclamation dc power sources are floating, a reading of the positive or negative lead to ground can produce varying results."
FIST 4-7, section 6.1.19.1, page 63, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
Obtaining the documents
- ANSI/NETA ATS-2025: available from the publisher
- ANSI/NETA MTS-2023: available from the publisher
- IEEE 946-2020: available from the publisher
Changelog (5 entries)
| Date | Revision | Change |
|---|---|---|
| 2026-10-13 | created (tests.dc-system-ground-detection.equipment.solar.acceptance) | |
| 2026-10-13 | created (tests.dc-system-ground-detection.governed-by.ansi-neta-ats) | |
| 2026-10-13 | created (tests.dc-system-ground-detection.governed-by.ansi-neta-mts) | |
| 2026-10-13 | created (tests.dc-system-ground-detection.governed-by.ieee-946) | |
| 2026-10-13 | created (tests.dc-system-ground-detection.title) |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"DC System Ground Detection." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/tests/dc-system-ground-detection/.
Electrical Testing Reference, DC System Ground Detection (Oct. 13, 2026), https://www.electricaltestingreference.com/tests/dc-system-ground-detection/.
@misc{etr-tests-dc-system-ground-detection,
title = {DC System Ground Detection},
howpublished = {\url{https://www.electricaltestingreference.com/tests/dc-system-ground-detection/}},
organization = {Electrical Testing Reference},
publisher = {Electrical Testing Reference},
year = {2026},
note = {last substantive change 2026-10-13}
}{{cite web |title=DC System Ground Detection |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/tests/dc-system-ground-detection/ |date=2026-10-13 |access-date=}}