Dielectric Withstand is specified for shielded medium-voltage and high-voltage cables in maintenance testing at clause 7.3.3.B.6 of ANSI/NETA MTS-2023.
Value: shielded medium-voltage and high-voltage cables
| Step | Item | Detail |
|---|---|---|
| Source | ANSI/NETA MTS-2023 | Licensed standard, clause 7.3.3.B.6 |
| Data record | tests.dielectric-withstand.equipment.cable.maintenance | Verified 2026-10-13 |
| Entry | Dielectric Withstand | No revisions |
- Subject
- Dielectric Withstand (Test methods)
- Kind
- Equipment fact
- Source
- ANSI/NETA MTS-2023, clause 7.3.3.B.6, Maintenance Testing Specifications for Electrical Power Equipment and Systems, NETA. Publisher page for ANSI/NETA MTS-2023Publisher information page
- Also stated in
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-26.b, PDF page 81, printed 5-14 (29 November 1996).
Read the reference passage
5-26.b. Testing frequency
"A yearly overvoltage test for the first 2 or 3 years, and then testing every 5 or 6 years, is the optimum and can reduce in-service failures by a factor of about nine to one as opposed to not having a proof testing test program. Insulation resistance tests should be based on the importance of the circuit; once a year is usually adequate."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-26.b, PDF page 81, printed 5-14, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.a, PDF page 82, printed 5-15, the ellipsis drops one sentence naming ANSI/IEEE 400 (29 November 1996).
Read the reference passage
5-28.a. Voltage
"Normally, the maintenance proof tests performed on cables are at a test voltage of 60 percent of the final factory test voltage for new cable/equipment. Determination of voltages for acceptance and proof tests should be made by qualified electrical engineers, and such tests should be made only when specifically directed by an engineering activity having jurisdiction over the installation. [...] It is always appropriate to conduct the insulation resistance measurement test first; and, if the data obtained is within acceptable limits, to proceed with the direct-current overpotential test."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.a, PDF page 82, printed 5-15, the ellipsis drops one sentence naming ANSI/IEEE 400, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.b, PDF page 82, printed 5-15, the sentence that follows names IEEE 48 and is not excerpted (29 November 1996).
Read the reference passage
5-28.b. Procedure
"For each cable, the test should be made between each conductor and every other conductor and between each conductor and ground. For the test to ground, all conductors may be connected together. There is no need to disconnect other equipment from the cable, but caution must be observed to ensure the test voltage is not greater than recommended for any of the equipment."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.b, PDF page 82, printed 5-15, the sentence that follows names IEEE 48 and is not excerpted, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.c, PDF page 82, printed 5-15 (29 November 1996).
Read the reference passage
5-28.c. Safety
"When making high-voltage tests, all applicable precautions regarding live electrical conductors should be observed to avoid dangerous electrical shock. After testing, the terminals should be short circuited before disconnecting the tester from the equipment. The short circuit should be maintained for at least as long as the time the proof voltage was applied."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.c, PDF page 82, printed 5-15, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.e, PDF page 83, printed 5-16, item (1); the hyphen of "steady-state" restored at a line-end break (29 November 1996).
Read the reference passage
5-28.e(1). Leakage current versus voltage test
"In this test, equal voltage steps are applied until the maximum test voltage is reached or an indication of a breakdown voltage is indicated. It is usually recommended that no less than five and, if possible, eight equal steps be made with no less than 1 and up to 4 minutes stabilization time allowed. The steady-state leakage current is plotted against the applied voltage. As long as the slope of the plot is the same, the insulation is in good condition. If the leakage current increases noticeably, so will the slope of the curve. Any change in the slope indicates that any voltage increase may cause insulation breakdown and the test should be stopped."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.e, PDF page 83, printed 5-16, item (1); the hyphen of "steady-state" restored at a line-end break, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.f, PDF page 83, printed 5-16 (29 November 1996).
Read the reference passage
5-28.f. Test for cable withstand strength
"A go/no-go test is usually performed after repair if only cable withstand strength requirements need be verified. The test provides a rising voltage up to the specified value applied to maintain a constant leakage current. A period of 1 to 1.5 minutes for reaching the final test voltage is usually adequate. The final test voltage is held for 5 minutes. If the current has not increased sufficiently in that time to trip protective devices, the cable withstand voltage is adequate."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.f, PDF page 83, printed 5-16, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-26.b, PDF page 81, printed 5-14 (29 November 1996).
History
| Date | Change |
|---|---|
| 2026-10-13 | created |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Data record tests.dielectric-withstand.equipment.cable.maintenance." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/data/tests.dielectric-withstand.equipment.cable.maintenance/.
Electrical Testing Reference, Data record tests.dielectric-withstand.equipment.cable.maintenance (Oct. 13, 2026), https://www.electricaltestingreference.com/data/tests.dielectric-withstand.equipment.cable.maintenance/.
@misc{etr-data-tests-dielectric-withstand-equipment-cable-maintenance,
title = {Data record tests.dielectric-withstand.equipment.cable.maintenance},
howpublished = {\url{https://www.electricaltestingreference.com/data/tests.dielectric-withstand.equipment.cable.maintenance/}},
organization = {Electrical Testing Reference},
publisher = {Electrical Testing Reference},
year = {2026},
note = {last substantive change 2026-10-13}
}{{cite web |title=Data record tests.dielectric-withstand.equipment.cable.maintenance |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.dielectric-withstand.equipment.cable.maintenance/ |date=2026-10-13 |access-date=}}