Dielectric Withstand

Updated 2026-10-29

RelationshipsDielectric Withstand is governed by ANSI/NETA ATS-2025, ANSI/NETA MTS-2023, FAA AC 150/5345-10H and applies to no listed equipment.ANSI/NETA ATS-2025 Standard for Acceptance Testing SpecificationsANSI/NETA ATS-2025ANSI/NETA MTS-2023 Standard for Maintenance Testing SpecificationsANSI/NETA MTS-2023FAA AC 150/5345-10HFAA AC 150/5345-10HDielectric WithstandDielectric Withstand
Relationships. Governing standards on the left, equipment classes the test applies to on the right, as recorded for this entry.
Relationships: relationships recorded for this entry.
RelationshipEntry
Governing standardANSI/NETA ATS-2025 (ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications)
Governing standardANSI/NETA MTS-2023 (ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications)
Governing standardFAA AC 150/5345-10H

Data records

  • Dielectric Withstand is specified for metal-enclosed busways in acceptance testing at clause 7.4.B.3 of ANSI/NETA ATS-2025. The clause calls for a dielectric withstand voltage test on each busway, phase-to-ground with the phases not under test grounded, at the manufacturer's test voltage. Value: metal-enclosed busways. Source: ANSI/NETA ATS-2025, clause 7.4.B.3. Verified 2026-10-29. Record tests.dielectric-withstand.equipment.busway-enclosed.acceptance
  • Dielectric Withstand is specified for outdoor bus structures in acceptance testing at clause 7.21.B.3 of ANSI/NETA ATS-2025. Value: outdoor bus structures. Source: ANSI/NETA ATS-2025, clause 7.21.B.3. Verified 2026-10-13. Record tests.dielectric-withstand.equipment.busway.acceptance
  • Dielectric Withstand is specified for outdoor bus structures in maintenance testing at clause 7.21.B.3 of ANSI/NETA MTS-2023. Value: outdoor bus structures. Source: ANSI/NETA MTS-2023, clause 7.21.B.3. Verified 2026-10-13. Record tests.dielectric-withstand.equipment.busway.maintenance
  • Dielectric Withstand is specified for shielded medium-voltage and high-voltage cables in acceptance testing at clause 7.3.3 of ANSI/NETA ATS-2025. Value: shielded medium-voltage and high-voltage cables. Source: ANSI/NETA ATS-2025, clause 7.3.3. Verified 2026-10-13. Record tests.dielectric-withstand.equipment.cable.acceptance
  • Dielectric Withstand is specified for shielded medium-voltage and high-voltage cables in maintenance testing at clause 7.3.3.B.6 of ANSI/NETA MTS-2023. Value: shielded medium-voltage and high-voltage cables. Source: ANSI/NETA MTS-2023, clause 7.3.3.B.6. Verified 2026-10-13. Record tests.dielectric-withstand.equipment.cable.maintenance
  • Dielectric Withstand is specified for dry-type shunt and current-limiting reactors in acceptance testing at clause 7.20.3.1.B.4 of ANSI/NETA ATS-2025. Value: dry-type shunt and current-limiting reactors. Source: ANSI/NETA ATS-2025, clause 7.20.3.1.B.4. Verified 2026-10-13. Record tests.dielectric-withstand.equipment.reactor.acceptance
  • Dielectric Withstand is specified for dry-type shunt and current-limiting reactors in maintenance testing at clause 7.20.3.1.B.4 of ANSI/NETA MTS-2023. Value: dry-type shunt and current-limiting reactors. Source: ANSI/NETA MTS-2023, clause 7.20.3.1.B.4. Verified 2026-10-13. Record tests.dielectric-withstand.equipment.reactor.maintenance
  • Dielectric Withstand is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.B.5 of ANSI/NETA ATS-2025. Value: oil automatic line sectionalizers. Source: ANSI/NETA ATS-2025, clause 7.24.2.B.5. Verified 2026-10-13. Record tests.dielectric-withstand.equipment.sectionalizer.acceptance
  • Dielectric Withstand is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.B.5 of ANSI/NETA MTS-2023. Value: oil automatic line sectionalizers. Source: ANSI/NETA MTS-2023, clause 7.24.2.B.5. Verified 2026-10-13. Record tests.dielectric-withstand.equipment.sectionalizer.maintenance
  • Dielectric Withstand is addressed in ANSI/NETA ATS-2025. Source: ANSI/NETA ATS-2025, clause 7.24.1.B.11. Verified 2026-10-13. Record tests.dielectric-withstand.governed-by.ansi-neta-ats
  • Dielectric Withstand is addressed in ANSI/NETA MTS-2023. Source: ANSI/NETA MTS-2023, clause 7.24.1.B.10. Verified 2026-10-13. Record tests.dielectric-withstand.governed-by.ansi-neta-mts
  • Dielectric Withstand is addressed in FAA AC 150/5345-10H. Source: FAA AC 150/5345-10H, clause 4.2.12. Verified 2026-10-13. Record tests.dielectric-withstand.governed-by.faa-ac-150-5345-10h
  • Dielectric Withstand is addressed in IEEE C57.12.91-2020. Source: IEEE C57.12.91-2020. Verified 2026-10-13. Record tests.dielectric-withstand.governed-by.ieee-c57-12-91
  • Clause 10.6 of IEEE C57.12.90-2021 performs the applied-voltage test with every part of the winding under test connected to the line terminal and all other windings, the core and the tank grounded; the voltage is raised gradually from a low fraction of the test level, held for the stated duration and brought down gradually, and a failure shows as smoke or bubbling in the liquid, a thump inside the tank, or a test current that rises suddenly. Source: IEEE C57.12.90-2021, clause 10.6. Verified 2026-10-24. Record tests.dielectric-withstand.ieeec57-12-90.applied-voltage
  • Clause 10.1.7 of IEEE C57.12.90-2021 is the one clause of the code that addresses testing in the field: periodic dielectric tests are not recommended because of the severity of the stress, they may be warranted after combustible gas detection or similar findings, and when required they are low-frequency applied-voltage and induced-voltage tests at reduced levels, with the voltage caps by transformer class and the durations given in the clause and in Table 2. Source: IEEE C57.12.90-2021, clause 10.1.7. Verified 2026-10-24. Record tests.dielectric-withstand.ieeec57-12-90.field
  • Clauses 10.7 and 10.8 of IEEE C57.12.90-2021 perform the induced-voltage test by exciting the transformer at a raised frequency so that the core does not saturate, for a duration stated in cycles or time, with the Class II procedure adding an enhancement level followed by a lower level held for an extended period during which partial discharge is read at intervals and judged against the magnitude, rise and trend criteria of clause 10.8.5. Source: IEEE C57.12.90-2021, clause 10.7, 10.8. Verified 2026-10-24. Record tests.dielectric-withstand.ieeec57-12-90.induced-voltage
  • The test method is named Dielectric Withstand. Value: Dielectric Withstand. Source: Electrical Testing Reference editorial taxonomy, 2026-10 edition. Verified 2026-10-13. Record tests.dielectric-withstand.title

Sources

  • ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.4.B.3; clause 7.21.B.3; clause 7.3.3; clause 7.20.3.1.B.4; clause 7.24.2.B.5; clause 7.24.1.B.11. Held as: Purchased single-user copy. Publisher page for ANSI/NETA ATS-2025Publisher information page
  • ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.21.B.3; clause 7.3.3.B.6; clause 7.20.3.1.B.4; clause 7.24.2.B.5; clause 7.24.1.B.10. Held as: Purchased single-user copy. Publisher page for ANSI/NETA MTS-2023Publisher information page
  • Electrical Testing Reference editorial taxonomy, Electrical Testing Reference editorial taxonomy of test methods, 2026-10 edition, Electrical Testing Reference. Held as: Own observation.
  • FAA AC 150/5345-10H, AC 150/5345-10H, H edition, Federal Aviation Administration. Cited: clause 4.2.12. Agency document. Held as: Government work. Agency copy of FAA AC 150/5345-10H
  • IEEE C57.12.90-2021, Test Code for Liquid-Immersed Distribution, Power and Regulating Transformers, 2021 edition, IEEE. Cited: clause 10.6; clause 10.1.7; clause 10.7, 10.8. Held as: Purchased single-user copy. Publisher page for IEEE C57.12.90-2021Publisher information page
  • IEEE C57.12.91-2020, IEEE Standard Test Code for Dry-Type Distribution and Power Transformers, 2020 edition, IEEE. Held as: Public page. Publisher page for IEEE C57.12.91-2020Publisher information page

Also stated in

  • FIST 4-7, section 6.1.21, page 67 (August 2023).
    Read the reference passage

    6.1.21 Electrical Bus Systems

    "Dielectric tests are performed to confirm no damage has been sustained to the system. It is important to understand that the bus system must be isolated prior to performing the dielectric test. The high voltage used in dielectric strength testing is dangerous and the utmost care should be taken in conducting such tests."

    FIST 4-7, section 6.1.21, page 67, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-26.b, PDF page 81, printed 5-14 (29 November 1996).
    Read the reference passage

    5-26.b. Testing frequency

    "A yearly overvoltage test for the first 2 or 3 years, and then testing every 5 or 6 years, is the optimum and can reduce in-service failures by a factor of about nine to one as opposed to not having a proof testing test program. Insulation resistance tests should be based on the importance of the circuit; once a year is usually adequate."

    TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-26.b, PDF page 81, printed 5-14, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082

    The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.

  • Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.a, PDF page 82, printed 5-15, the ellipsis drops one sentence naming ANSI/IEEE 400 (29 November 1996).
    Read the reference passage

    5-28.a. Voltage

    "Normally, the maintenance proof tests performed on cables are at a test voltage of 60 percent of the final factory test voltage for new cable/equipment. Determination of voltages for acceptance and proof tests should be made by qualified electrical engineers, and such tests should be made only when specifically directed by an engineering activity having jurisdiction over the installation. [...] It is always appropriate to conduct the insulation resistance measurement test first; and, if the data obtained is within acceptable limits, to proceed with the direct-current overpotential test."

    TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.a, PDF page 82, printed 5-15, the ellipsis drops one sentence naming ANSI/IEEE 400, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082

    The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.

  • Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.b, PDF page 82, printed 5-15, the sentence that follows names IEEE 48 and is not excerpted (29 November 1996).
    Read the reference passage

    5-28.b. Procedure

    "For each cable, the test should be made between each conductor and every other conductor and between each conductor and ground. For the test to ground, all conductors may be connected together. There is no need to disconnect other equipment from the cable, but caution must be observed to ensure the test voltage is not greater than recommended for any of the equipment."

    TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.b, PDF page 82, printed 5-15, the sentence that follows names IEEE 48 and is not excerpted, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082

    The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.

  • Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.c, PDF page 82, printed 5-15 (29 November 1996).
    Read the reference passage

    5-28.c. Safety

    "When making high-voltage tests, all applicable precautions regarding live electrical conductors should be observed to avoid dangerous electrical shock. After testing, the terminals should be short circuited before disconnecting the tester from the equipment. The short circuit should be maintained for at least as long as the time the proof voltage was applied."

    TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.c, PDF page 82, printed 5-15, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082

    The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.

  • Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.e, PDF page 83, printed 5-16, item (1); the hyphen of "steady-state" restored at a line-end break (29 November 1996).
    Read the reference passage

    5-28.e(1). Leakage current versus voltage test

    "In this test, equal voltage steps are applied until the maximum test voltage is reached or an indication of a breakdown voltage is indicated. It is usually recommended that no less than five and, if possible, eight equal steps be made with no less than 1 and up to 4 minutes stabilization time allowed. The steady-state leakage current is plotted against the applied voltage. As long as the slope of the plot is the same, the insulation is in good condition. If the leakage current increases noticeably, so will the slope of the curve. Any change in the slope indicates that any voltage increase may cause insulation breakdown and the test should be stopped."

    TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.e, PDF page 83, printed 5-16, item (1); the hyphen of "steady-state" restored at a line-end break, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082

    The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.

  • Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.f, PDF page 83, printed 5-16 (29 November 1996).
    Read the reference passage

    5-28.f. Test for cable withstand strength

    "A go/no-go test is usually performed after repair if only cable withstand strength requirements need be verified. The test provides a rising voltage up to the specified value applied to maintain a constant leakage current. A period of 1 to 1.5 minutes for reaching the final test voltage is usually adequate. The final test voltage is held for 5 minutes. If the current has not increased sufficiently in that time to trip protective devices, the cable withstand voltage is adequate."

    TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 5-28.f, PDF page 83, printed 5-16, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082

    The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.

  • FIST 4-7, section 6.1.28, page 87 (August 2023).
    Read the reference passage

    6.1.28 Generator and Large Motor Windings

    "Field windings are typically given ac high-potential tests before they are put into service."

    FIST 4-7, section 6.1.28, page 87, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 6.1.8.2, page 39 (August 2023).
    Read the reference passage

    6.1.8.2 High Potential Withstand Testing

    "High potential (hipot) testing refers to the application of alternating, or direct, high-voltage to a test specimen for a duration of one-minute. The insulation system either passes or fails the test and is therefore categorized as a 'proof' test and does not usually provide diagnostic information. High potential withstand testing will not damage or significantly degrade an insulation system that is free of serious damage or defects."

    FIST 4-7, section 6.1.8.2, page 39, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 6.1.8.2, page 40 (August 2023).
    Read the reference passage

    6.1.8.2 High Potential Withstand Testing

    "Performing insulation tests to voltage levels below the recommended values compromises the effectiveness, quality, and accuracy of information gained by the high-voltage and/or diagnostic test(s). Performing maintenance tests to lower-than-recommended values is essentially a run-to-failure policy."

    FIST 4-7, section 6.1.8.2, page 40, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

Obtaining the documents

Changelog (22 entries)
DateRevisionChange
2026-10-29created (tests.dielectric-withstand.equipment.busway-enclosed.acceptance)
2026-10-24created (tests.dielectric-withstand.ieeec57-12-90.applied-voltage)
2026-10-24revised (tests.dielectric-withstand.ieeec57-12-90.applied-voltage)
2026-10-24review_status unreviewed -> software_reviewed (tests.dielectric-withstand.ieeec57-12-90.applied-voltage)
2026-10-24created (tests.dielectric-withstand.ieeec57-12-90.field)
2026-10-24review_status unreviewed -> software_reviewed (tests.dielectric-withstand.ieeec57-12-90.field)
2026-10-24created (tests.dielectric-withstand.ieeec57-12-90.induced-voltage)
2026-10-24revised (tests.dielectric-withstand.ieeec57-12-90.induced-voltage)
2026-10-24review_status unreviewed -> software_reviewed (tests.dielectric-withstand.ieeec57-12-90.induced-voltage)
2026-10-13created (tests.dielectric-withstand.equipment.busway.acceptance)
2026-10-13created (tests.dielectric-withstand.equipment.busway.maintenance)
2026-10-13created (tests.dielectric-withstand.equipment.cable.acceptance)
2026-10-13created (tests.dielectric-withstand.equipment.cable.maintenance)
2026-10-13created (tests.dielectric-withstand.equipment.reactor.acceptance)
2026-10-13created (tests.dielectric-withstand.equipment.reactor.maintenance)
2026-10-13created (tests.dielectric-withstand.equipment.sectionalizer.acceptance)
2026-10-13created (tests.dielectric-withstand.equipment.sectionalizer.maintenance)
2026-10-13created (tests.dielectric-withstand.governed-by.ansi-neta-ats)
2026-10-13created (tests.dielectric-withstand.governed-by.ansi-neta-mts)
2026-10-13created (tests.dielectric-withstand.governed-by.faa-ac-150-5345-10h)
2026-10-13created (tests.dielectric-withstand.governed-by.ieee-c57-12-91)
2026-10-13created (tests.dielectric-withstand.title)

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Dielectric Withstand." Electrical Testing Reference. 2026-10-29. https://www.electricaltestingreference.com/tests/dielectric-withstand/.
Electrical Testing Reference, Dielectric Withstand (Oct. 29, 2026), https://www.electricaltestingreference.com/tests/dielectric-withstand/.
@misc{etr-tests-dielectric-withstand,
  title = {Dielectric Withstand},
  howpublished = {\url{https://www.electricaltestingreference.com/tests/dielectric-withstand/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-29}
}
{{cite web |title=Dielectric Withstand |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/tests/dielectric-withstand/ |date=2026-10-29 |access-date=}}