Data record tests.scada-and-communication-verification.governed-by.ansi-neta-ats
Verified 2026-10-13 Confidence: Medium
Provenance pending: the source of this record has not yet been confirmed as official.
SCADA and Communication Verification is addressed in ANSI/NETA ATS-2025.
| Step | Item | Detail |
|---|---|---|
| Source | ANSI/NETA ATS-2025 | Licensed standard, clause 7.9.2.B.10 |
| Data record | tests.scada-and-communication-verification.governed-by.ansi-neta-ats | Verified 2026-10-13 |
| Entry | SCADA and Communication Verification | No revisions |
- Subject
- SCADA and Communication Verification (Test methods)
- Kind
- Method fact
- Source
- ANSI/NETA ATS-2025, clause 7.9.2.B.10, Acceptance Testing Specifications for Electrical Power Equipment and Systems, NETA. Publisher page for ANSI/NETA ATS-2025Publisher information page
- Also stated in
- FIST 4-7, section 6.1.12, page 53 (August 2023).
Read the reference passage
6.1.12 Control and SCADA Systems
"A thorough pre-commissioning test plan should be created in advance of any testing. No actual plant operations will be performed as part of this test plan. Operations should be simulated. Portions of this test plan can be performed as part of the Factory Acceptance Test (FAT) prior to pre-commissioning if needed, provided that the FAT test results are documented."
FIST 4-7, section 6.1.12, page 53, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- FIST 4-7, section 7.5.4, page 160 (August 2023).
Read the reference passage
7.5.4 Verify Unit Control by HMI/SCADA System (Local and Remote)
"The most important test would be to confirm bumpless transfer when switching between local and remote (with the unit in simulated power production)."
FIST 4-7, section 7.5.4, page 160, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- FIST 4-7, section 6.1.12, page 53 (August 2023).
History
| Date | Change |
|---|---|
| 2026-10-13 | created |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Data record tests.scada-and-communication-verification.governed-by.ansi-neta-ats." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/data/tests.scada-and-communication-verification.governed-by.ansi-neta-ats/.
Electrical Testing Reference, Data record tests.scada-and-communication-verification.governed-by.ansi-neta-ats (Oct. 13, 2026), https://www.electricaltestingreference.com/data/tests.scada-and-communication-verification.governed-by.ansi-neta-ats/.
@misc{etr-data-tests-scada-and-communication-verification-governed-by-ansi-neta-ats,
title = {Data record tests.scada-and-communication-verification.governed-by.ansi-neta-ats},
howpublished = {\url{https://www.electricaltestingreference.com/data/tests.scada-and-communication-verification.governed-by.ansi-neta-ats/}},
organization = {Electrical Testing Reference},
publisher = {Electrical Testing Reference},
year = {2026},
note = {last substantive change 2026-10-13}
}{{cite web |title=Data record tests.scada-and-communication-verification.governed-by.ansi-neta-ats |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.scada-and-communication-verification.governed-by.ansi-neta-ats/ |date=2026-10-13 |access-date=}}