Data record tests.system-function-testing.governed-by.ansi-neta-ats

Verified 2026-10-13 Confidence: Medium

Provenance pending: the source of this record has not yet been confirmed as official.

System Function Testing is addressed in ANSI/NETA ATS-2025.

ProvenanceANSI/NETA ATS-2025 supports data record tests.system-function-testing.governed-by.ansi-neta-ats, which is cited on the entry System Function Testing.SOURCEANSI/NETA ATS-2025ANSI/NETA ATS-2025Licensed standard, clause 8DATA RECORDtests.system-function-testing.governed-by.ansi-neta-atstests.system-function-te..Verified 2026-10-13ENTRYSystem Function TestingSystem Function TestingNo revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceANSI/NETA ATS-2025Licensed standard, clause 8
Data recordtests.system-function-testing.governed-by.ansi-neta-atsVerified 2026-10-13
EntrySystem Function TestingNo revisions
Subject
System Function Testing (Test methods)
Kind
Method fact
Source
ANSI/NETA ATS-2025, clause 8, Acceptance Testing Specifications for Electrical Power Equipment and Systems, NETA. Publisher page for ANSI/NETA ATS-2025Publisher information page
Also stated in
  • FIST 4-7, section 3.4, page 9 (August 2023).
    Read the reference passage

    3.4 Commissioning Plan

    "The purpose of the functional testing is to ensure each system and its components perform in accordance with design requirements and is complete and safe to energize or operate."

    FIST 4-7, section 3.4, page 9, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 7.2, page 157 (August 2023).
    Read the reference passage

    7.2 Functional Testing

    "Functional testing can be done in parts, but the goal is to eventually carry out a complete start to 100% load and back to stop simulation of the unit."

    FIST 4-7, section 7.2, page 157, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-13created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.system-function-testing.governed-by.ansi-neta-ats." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/data/tests.system-function-testing.governed-by.ansi-neta-ats/.
Electrical Testing Reference, Data record tests.system-function-testing.governed-by.ansi-neta-ats (Oct. 13, 2026), https://www.electricaltestingreference.com/data/tests.system-function-testing.governed-by.ansi-neta-ats/.
@misc{etr-data-tests-system-function-testing-governed-by-ansi-neta-ats,
  title = {Data record tests.system-function-testing.governed-by.ansi-neta-ats},
  howpublished = {\url{https://www.electricaltestingreference.com/data/tests.system-function-testing.governed-by.ansi-neta-ats/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-13}
}
{{cite web |title=Data record tests.system-function-testing.governed-by.ansi-neta-ats |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.system-function-testing.governed-by.ansi-neta-ats/ |date=2026-10-13 |access-date=}}