System Function Testing
Updated 2026-10-24
| Relationship | Entry |
|---|---|
| Governing standard | ANSI/NETA ATS-2025 (ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications) |
| Governing standard | ANSI/NETA MTS-2023 (ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications) |
Data records
- System Function Testing is specified for complete electrical systems in acceptance testing at clause 8 of ANSI/NETA ATS-2025. Value: complete electrical systems.
- System Function Testing is specified for complete electrical systems in maintenance testing at clause 8 of ANSI/NETA MTS-2023. Value: complete electrical systems.
- System Function Testing is specified for electric vehicle charging systems in acceptance testing at clause 7.26.B.1 of ANSI/NETA ATS-2025. Value: electric vehicle charging systems.
- System Function Testing is specified for electric vehicle charging systems in maintenance testing at clause 7.26.B.2 of ANSI/NETA MTS-2023. Value: electric vehicle charging systems.
- System Function Testing is addressed in ANSI/NETA ATS-2025.
- System Function Testing is addressed in ANSI/NETA MTS-2023.
- Table 71 in clause 8.1.3.4.1 of IEEE 1547.1-2020 distinguishes a basic commissioning test, which may consist of a visual inspection together with an operability check of the isolation device and whose scope the design evaluation sets, from a detailed commissioning test, which adds functional tests of the combined devices.
- Commissioning test CT1 in clause 8.2.3.1 of IEEE 1547.1-2020 is an on-off test: the DER is brought online from off in the specified mode while the voltage response of the Area EPS, the intentional delay and the ramp to steady state are observed, a disconnect and reconnect are simulated, and cease to energize is verified when all ungrounded phases are opened by some device other than the interconnection device and, for multiphase DER, when one phase is opened at the PoC. Observations are reviewed with the Area EPS operator, results are documented with the agreement of both operators, and any failure carries agreed corrective action and a repeat of the test.
- Under clause 9 of IEEE 1547.1-2020, periodic re-verification of a DER uses the clause 8 field methods as agreed between the operators, and the Area EPS operator receives documentation of the updated configuration together with the re-verification results.
- Clause 11.2.5 of IEEE 1547-2018 requires DER commissioning tests to follow written procedures from the manufacturer or system designer that the owner and the area electric power system operator have approved, always to include a visual inspection, and distinguishes a basic commissioning test (visual inspection plus operability of the isolation device) from a detailed one that adds functional tests of the interconnection devices as a system.
- Clause 12.2.5 of IEEE 2800-2022 defines a commissioning test as a field verification of a unit, a supplemental device or the whole plant, run in every case to a written procedure that follows good engineering practice and that the transmission system operator has accepted as suited to the requirement; such tests may include operability and functional performance tests.
- The test method is named System Function Testing. Value: System Function Testing.
Elsewhere in the family
- System Function Testing more on this entry on Switchgear Testing Reference
- Power Quality and Harmonic Survey related entry on Power Quality Reference
- IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces related entry on Interconnection Reference
- IEEE Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces related entry on Interconnection Reference
- IEEE Standard for Interconnection and Interoperability of Inverter-Based Resources (IBRs) Interconnecting with Associated Transmission Electric Power Systems related entry on Interconnection Reference
Sources
- ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 8; clause 7.26.B.1. Held as: Purchased single-user copy. Publisher page for ANSI/NETA ATS-2025Publisher information page
- ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 8; clause 7.26.B.2. Held as: Purchased single-user copy. Publisher page for ANSI/NETA MTS-2023Publisher information page
- Electrical Testing Reference editorial taxonomy, Electrical Testing Reference editorial taxonomy of test methods, 2026-10 edition, Electrical Testing Reference. Held as: Own observation.
- IEEE 1547-2018, Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces, 2018 edition, IEEE. Cited: clause 11.2.5. Held as: Purchased single-user copy. Publisher page for IEEE 1547-2018Publisher information page
- IEEE 1547.1-2020, Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources, 2020 edition, IEEE. Cited: clause 8.1.3.4.1; clause 8.2.3.1; clause 9. Held as: Purchased single-user copy. Publisher page for IEEE 1547.1-2020Publisher information page
- IEEE 2800-2022, Interconnection and Interoperability of Inverter-Based Resources with Transmission Systems, 2022 edition, IEEE. Cited: clause 12.2.5. Held as: Purchased single-user copy. Publisher page for IEEE 2800-2022Publisher information page
Also stated in
- FIST 4-7, section 7.2, page 157 (August 2023).
Read the reference passage
7.2 Functional Testing
"The concept behind functional testing is to test the entire system as a whole. The purpose is to verify as much as possible by simulating real operation. This will identify, to the greatest extent possible, any problems and issues before electrical energy and rotation is applied to the unit."
FIST 4-7, section 7.2, page 157, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- FIST 4-7, section 3.4, page 9 (August 2023).
Read the reference passage
3.4 Commissioning Plan
"The purpose of the functional testing is to ensure each system and its components perform in accordance with design requirements and is complete and safe to energize or operate."
FIST 4-7, section 3.4, page 9, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- FIST 4-7, section 7.2, page 157 (August 2023).
Read the reference passage
7.2 Functional Testing
"Functional testing can be done in parts, but the goal is to eventually carry out a complete start to 100% load and back to stop simulation of the unit."
FIST 4-7, section 7.2, page 157, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
Obtaining the documents
- ANSI/NETA ATS-2025: available from the publisher
- ANSI/NETA MTS-2023: available from the publisher
- IEEE 1547-2018: available from the publisher
- IEEE 1547.1-2020: available from the publisher
- IEEE 2800-2022: available from the publisher
Changelog (21 entries)
| Date | Revision | Change |
|---|---|---|
| 2026-10-24 | created (tests.system-function-testing.ieee1547-1.commissioning-scope) | |
| 2026-10-24 | revised (tests.system-function-testing.ieee1547-1.commissioning-scope) | |
| 2026-10-24 | review_status unreviewed -> software_reviewed (tests.system-function-testing.ieee1547-1.commissioning-scope) | |
| 2026-10-24 | created (tests.system-function-testing.ieee1547-1.on-off-test) | |
| 2026-10-24 | revised (tests.system-function-testing.ieee1547-1.on-off-test) | |
| 2026-10-24 | review_status unreviewed -> software_reviewed (tests.system-function-testing.ieee1547-1.on-off-test) | |
| 2026-10-24 | created (tests.system-function-testing.ieee1547-1.periodic-reverification) | |
| 2026-10-24 | revised (tests.system-function-testing.ieee1547-1.periodic-reverification) | |
| 2026-10-24 | review_status unreviewed -> software_reviewed (tests.system-function-testing.ieee1547-1.periodic-reverification) | |
| 2026-10-24 | created (tests.system-function-testing.ieee1547.commissioning-tests) | |
| 2026-10-24 | review_status unreviewed -> software_reviewed (tests.system-function-testing.ieee1547.commissioning-tests) | |
| 2026-10-24 | created (tests.system-function-testing.ieee2800.commissioning-tests) | |
| 2026-10-24 | revised (tests.system-function-testing.ieee2800.commissioning-tests) | |
| 2026-10-24 | review_status unreviewed -> software_reviewed (tests.system-function-testing.ieee2800.commissioning-tests) | |
| 2026-10-13 | created (tests.system-function-testing.equipment.commissioning-system.acceptance) | |
| 2026-10-13 | created (tests.system-function-testing.equipment.commissioning-system.maintenance) | |
| 2026-10-13 | created (tests.system-function-testing.equipment.evcharging.acceptance) | |
| 2026-10-13 | created (tests.system-function-testing.equipment.evcharging.maintenance) | |
| 2026-10-13 | created (tests.system-function-testing.governed-by.ansi-neta-ats) | |
| 2026-10-13 | created (tests.system-function-testing.governed-by.ansi-neta-mts) | |
| 2026-10-13 | created (tests.system-function-testing.title) |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"System Function Testing." Electrical Testing Reference. 2026-10-24. https://www.electricaltestingreference.com/tests/system-function-testing/.
Electrical Testing Reference, System Function Testing (Oct. 24, 2026), https://www.electricaltestingreference.com/tests/system-function-testing/.
@misc{etr-tests-system-function-testing,
title = {System Function Testing},
howpublished = {\url{https://www.electricaltestingreference.com/tests/system-function-testing/}},
organization = {Electrical Testing Reference},
publisher = {Electrical Testing Reference},
year = {2026},
note = {last substantive change 2026-10-24}
}{{cite web |title=System Function Testing |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/tests/system-function-testing/ |date=2026-10-24 |access-date=}}