Clause 11.2.5 of IEEE 1547-2018 requires DER commissioning tests to follow written procedures from the manufacturer or system designer that the owner and the area electric power system operator have approved, always to include a visual inspection, and distinguishes a basic commissioning test (visual inspection plus operability of the isolation device) from a detailed one that adds functional tests of the interconnection devices as a system.

ProvenanceIEEE 1547-2018 supports data record tests.system-function-testing.ieee1547.commissioning-tests, which is cited on the entry System Function Testing.SOURCEIEEE 1547-2018IEEE 1547-2018Licensed standard, clause 11.2.5DATA RECORDtests.system-function-testing.ieee1547.commissioning-teststests.system-function-te..Verified 2026-10-24ENTRYSystem Function TestingSystem Function TestingNo revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceIEEE 1547-2018Licensed standard, clause 11.2.5
Data recordtests.system-function-testing.ieee1547.commissioning-testsVerified 2026-10-24
EntrySystem Function TestingNo revisions
Subject
System Function Testing (Test methods)
Kind
Method fact
Source
IEEE 1547-2018, clause 11.2.5, Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces, IEEE.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-24created
2026-10-24review_status unreviewed -> software_reviewed

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.system-function-testing.ieee1547.commissioning-tests." Electrical Testing Reference. 2026-10-24. https://www.electricaltestingreference.com/data/tests.system-function-testing.ieee1547.commissioning-tests/.