Visual and Mechanical Inspection is specified for capacitors in maintenance testing at clause 7.20.1.A of ANSI/NETA MTS-2023.
Value: capacitors
| Step | Item | Detail |
|---|---|---|
| Source | ANSI/NETA MTS-2023 | Licensed standard, clause 7.20.1.A |
| Data record | tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance | Verified 2026-10-13 |
| Entry | Visual and Mechanical Inspection | No revisions |
- Subject
- Visual and Mechanical Inspection (Test methods)
- Kind
- Equipment fact
- Source
- ANSI/NETA MTS-2023, clause 7.20.1.A, Maintenance Testing Specifications for Electrical Power Equipment and Systems, NETA. Publisher page for ANSI/NETA MTS-2023Publisher information page
- Also stated in
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-11, PDF page 145, printed 13-2, the sentences before it (fuse ratings of 165 to 250 percent and the tank-rupture curve) are left to the summary (29 November 1996).
Read the reference passage
13-11. Fuses for power capacitors
"The blowing of a properly-rated fuse may indicate a capacitor fault, as well as a circuit overcurrent operating condition. When inspection reveals blown fuses, do not replace such fuses until a check determines that the capacitor unit is still serviceable. When fuses are replaced, be sure they are of proper voltage and current ratings and in compliance with the capacitor manufacturer's recommendations."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-11, PDF page 145, printed 13-2, the sentences before it (fuse ratings of 165 to 250 percent and the tank-rupture curve) are left to the summary, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-5, PDF page 144, printed 13-1 (29 November 1996).
Read the reference passage
13-5. Ensuring safe capacitor deenergizing
"Capacitors retain a charge after they are deenergized. After capacitors are deenergized allow at least 5 minutes for discharge and then short the capacitor terminals to ground and to each other. These grounding provisions should remain until work on the installation is completed. Although most power capacitors have a discharge resistor installed to automatically discharge them after they are disconnected from the circuit, it is not advisable to depend entirely on such resistors for safety."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-5, PDF page 144, printed 13-1, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-11, PDF page 145, printed 13-2, the sentences before it (fuse ratings of 165 to 250 percent and the tank-rupture curve) are left to the summary (29 November 1996).
History
| Date | Change |
|---|---|
| 2026-10-13 | created |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Data record tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/data/tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance/.
Electrical Testing Reference, Data record tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance (Oct. 13, 2026), https://www.electricaltestingreference.com/data/tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance/.
@misc{etr-data-tests-visual-and-mechanical-inspection-equipment-capacitor-maintenance,
title = {Data record tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance},
howpublished = {\url{https://www.electricaltestingreference.com/data/tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance/}},
organization = {Electrical Testing Reference},
publisher = {Electrical Testing Reference},
year = {2026},
note = {last substantive change 2026-10-13}
}{{cite web |title=Data record tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance/ |date=2026-10-13 |access-date=}}