Visual and Mechanical Inspection
Updated 2026-11-02
| Relationship | Entry |
|---|---|
| Governing standard | ANSI/NETA ATS-2025 (ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications) |
| Governing standard | ANSI/NETA ECS-2024 (ANSI/NETA ECS-2024 Standard for Electrical Commissioning Specifications) |
| Governing standard | ANSI/NETA MTS-2023 (ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications) |
| Governing standard | FAA AC 150/5345-10H |
Data records
- Visual and Mechanical Inspection is specified for medium-voltage and high-voltage surge arresters in maintenance testing at clause 7.19.2.A of ANSI/NETA MTS-2023. The clause covers the physical and mechanical condition, anchorage, alignment and grounding, cleaning, bolted connections, the ground lead of each device individually attached to a ground bus or ground electrode, and the mounting and electrical connection of a stroke counter where one is fitted, with as-found and as-left tests around the cleaning. Value: medium-voltage and high-voltage surge arresters.
- Visual and Mechanical Inspection is specified for automatic transfer switches in emergency systems in acceptance testing at clause 7.22.3.A of ANSI/NETA ATS-2025. Value: automatic transfer switches in emergency systems.
- Visual and Mechanical Inspection is specified for automatic transfer switches in emergency systems in maintenance testing at clause 7.22.3.A of ANSI/NETA MTS-2023. Value: automatic transfer switches in emergency systems.
- Visual and Mechanical Inspection is specified for automation and communication systems in acceptance testing at clause 7.23.A of ANSI/NETA ATS-2025. Value: automation and communication systems.
- Visual and Mechanical Inspection is specified for automation and communication systems in maintenance testing at clause 7.23.A of ANSI/NETA MTS-2023. Value: automation and communication systems.
- Visual and Mechanical Inspection is specified for outdoor bus structures in acceptance testing at clause 7.21.A of ANSI/NETA ATS-2025. Value: outdoor bus structures.
- Visual and Mechanical Inspection is specified for outdoor bus structures in maintenance testing at clause 7.21.A of ANSI/NETA MTS-2023. Value: outdoor bus structures.
- Visual and Mechanical Inspection is specified for fiber-optic cables in acceptance testing at clause 7.25.A of ANSI/NETA ATS-2025. Value: fiber-optic cables.
- Visual and Mechanical Inspection is specified for fiber-optic cables in maintenance testing at clause 7.25.A of ANSI/NETA MTS-2023. Value: fiber-optic cables.
- Visual and Mechanical Inspection is specified for capacitors in acceptance testing at clause 7.20.1.A of ANSI/NETA ATS-2025. Value: capacitors.
- Visual and Mechanical Inspection is specified for capacitors in maintenance testing at clause 7.20.1.A of ANSI/NETA MTS-2023. Value: capacitors.
- Visual and Mechanical Inspection is specified for adjustable-speed drive systems in acceptance testing at clause 7.17.A of ANSI/NETA ATS-2025. Value: adjustable-speed drive systems.
- Visual and Mechanical Inspection is specified for adjustable-speed drive systems in maintenance testing at clause 7.17.A of ANSI/NETA MTS-2023. Value: adjustable-speed drive systems.
- Visual and Mechanical Inspection is specified for electric vehicle charging systems in acceptance testing at clause 7.26.A of ANSI/NETA ATS-2025. Value: electric vehicle charging systems.
- Visual and Mechanical Inspection is specified for electric vehicle charging systems in maintenance testing at clause 7.26.A of ANSI/NETA MTS-2023. Value: electric vehicle charging systems.
- Visual and Mechanical Inspection is specified for low-voltage network protectors in acceptance testing at clause 7.8.A of ANSI/NETA ATS-2025. Value: low-voltage network protectors.
- Visual and Mechanical Inspection is specified for low-voltage network protectors in maintenance testing at clause 7.8.A of ANSI/NETA MTS-2023. Value: low-voltage network protectors.
- Visual and Mechanical Inspection is specified for equipment surveyed for online partial discharge in maintenance testing at clause 11 of ANSI/NETA MTS-2023. Value: equipment surveyed for online partial discharge.
- Visual and Mechanical Inspection is specified for dry-type shunt and current-limiting reactors in acceptance testing at clause 7.20.3.1.A of ANSI/NETA ATS-2025. Value: dry-type shunt and current-limiting reactors.
- Visual and Mechanical Inspection is specified for dry-type shunt and current-limiting reactors in maintenance testing at clause 7.20.3.1.A of ANSI/NETA MTS-2023. Value: dry-type shunt and current-limiting reactors.
- Visual and Mechanical Inspection is specified for resistors in acceptance testing at clause 7.20.4.A of ANSI/NETA ATS-2025. Value: resistors.
- Visual and Mechanical Inspection is specified for resistors in maintenance testing at clause 7.20.4.A of ANSI/NETA MTS-2023. Value: resistors.
- Visual and Mechanical Inspection is specified for oil automatic line sectionalizers in acceptance testing at clause 7.24.2.A of ANSI/NETA ATS-2025. Value: oil automatic line sectionalizers.
- Visual and Mechanical Inspection is specified for oil automatic line sectionalizers in maintenance testing at clause 7.24.2.A of ANSI/NETA MTS-2023. Value: oil automatic line sectionalizers.
- Visual and Mechanical Inspection is specified for solar photovoltaic systems in acceptance testing at clause 7.29.A of ANSI/NETA ATS-2025. Value: solar photovoltaic systems.
- Visual and Mechanical Inspection is specified for low-voltage surge protective devices in acceptance testing at clause 7.19.1.A of ANSI/NETA ATS-2025. Value: low-voltage surge protective devices.
- Visual and Mechanical Inspection is specified for low-voltage surge protective devices in maintenance testing at clause 7.19.1.A of ANSI/NETA MTS-2023. Value: low-voltage surge protective devices.
- Visual and Mechanical Inspection is specified for uninterruptible power systems in acceptance testing at clause 7.22.2.A of ANSI/NETA ATS-2025. Value: uninterruptible power systems.
- Visual and Mechanical Inspection is specified for uninterruptible power systems in maintenance testing at clause 7.22.2.A of ANSI/NETA MTS-2023. Value: uninterruptible power systems.
- Visual and Mechanical Inspection is addressed in ANSI C12.1-2026.
- Visual and Mechanical Inspection is addressed in ANSI/NETA ATS-2025.
- Visual and Mechanical Inspection is addressed in ANSI/NETA ECS-2024.
- Visual and Mechanical Inspection is addressed in ANSI/NETA MTS-2023.
- Visual and Mechanical Inspection is addressed in FAA AC 150/5345-10H.
- Visual and Mechanical Inspection is addressed in IEEE 946-2020.
- Visual and Mechanical Inspection is addressed in IEEE C57.13-2016.
- Visual and Mechanical Inspection is addressed in IEEE C57.18.10-2021.
- The test method is named Visual and Mechanical Inspection. Value: Visual and Mechanical Inspection.
Elsewhere in the family
- Visual and Mechanical Inspection more on this entry on Battery Testing Reference
- Visual and Mechanical Inspection more on this entry on Circuit Breaker Reference
- Visual and Mechanical Inspection more on this entry on Grounding Reference
- Visual and Mechanical Inspection more on this entry on Motor Testing Reference
- Visual and Mechanical Inspection more on this entry on Protective Relay Reference
- Visual and Mechanical Inspection more on this entry on Revenue Metering Reference
- Visual and Mechanical Inspection more on this entry on Switchgear Testing Reference
- Visual and Mechanical Inspection more on this entry on Transformer Testing Reference
- ANSI C12.1-2026 related entry on Revenue Metering Reference
- IEEE Recommended Practice for the Design of DC Power Systems for Stationary Applications related entry on Battery Testing Reference
- IEEE Standard Requirements for Instrument Transformers related entry on Revenue Metering Reference
- IEEE Standard Practices and Requirements for Semiconductor Power Rectifier Transformers related entry on Transformer Testing Reference
Sources
- ANSI C12.1-2026, Electric Meters - Code for Electricity Metering, 2026 edition, NEMA. Cited: clause 5.2.4. Held as: Purchased single-user copy. Publisher page for ANSI C12.1-2026Publisher information page
- ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.22.3.A; clause 7.23.A; clause 7.21.A; clause 7.25.A; clause 7.20.1.A; clause 7.17.A; clause 7.26.A; clause 7.8.A; clause 7.20.3.1.A; clause 7.20.4.A; clause 7.24.2.A; clause 7.29.A; clause 7.19.1.A; clause 7.22.2.A. Held as: Purchased single-user copy. Publisher page for ANSI/NETA ATS-2025Publisher information page
- ANSI/NETA ECS-2024, Standard for Electrical Commissioning Specifications, 2024 edition, NETA. Cited: clause 9.1. Held as: Purchased single-user copy. Publisher page for ANSI/NETA ECS-2024Publisher information page
- ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.19.2.A; clause 7.22.3.A; clause 7.23.A; clause 7.21.A; clause 7.25.A; clause 7.20.1.A; clause 7.17.A; clause 7.26.A; clause 7.8.A; clause 11; clause 7.20.3.1.A; clause 7.20.4.A; clause 7.24.2.A; clause 7.19.1.A; clause 7.22.2.A. Held as: Purchased single-user copy. Publisher page for ANSI/NETA MTS-2023Publisher information page
- Electrical Testing Reference editorial taxonomy, Electrical Testing Reference editorial taxonomy of test methods, 2026-10 edition, Electrical Testing Reference. Held as: Own observation.
- FAA AC 150/5345-10H, AC 150/5345-10H, H edition, Federal Aviation Administration. Cited: clause 3.4. Agency document. Held as: Government work. Agency copy of FAA AC 150/5345-10H
- IEEE 946-2020, Design of DC Auxiliary Power Systems for Generating Stations, 2020 edition, IEEE. Cited: clause 7.4. Held as: Purchased single-user copy. Publisher page for IEEE 946-2020Publisher information page
- IEEE C57.13-2016, Requirements for Instrument Transformers, 2016 edition, IEEE. Cited: clause 4.9.1. Held as: Purchased single-user copy. Publisher page for IEEE C57.13-2016Publisher information page
- IEEE C57.18.10-2021, Semiconductor Power Rectifier Transformers, 2021 edition, IEEE. Cited: clause 6.14.2. Held as: Purchased single-user copy. Publisher page for IEEE C57.18.10-2021Publisher information page
Also stated in
- TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 9-8.a, PDF page 117, printed 9-2, items (1) to (3) of five (29 November 1996).
Read the reference passage
9-8.a. Visual inspections
"Visual inspection should be made periodically to ensure that: (1) The line lead is securely fastened to the line conductor and the arrester. (2) The ground lead is securely fastened to the arrester terminal and ground. (3) The arrester housing is clean and free from cracks, chips, or evidence of external flashover."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 9-8.a, PDF page 117, printed 9-2, items (1) to (3) of five, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- FIST 4-7, section 6.1.4.1, page 28 (August 2023).
Read the reference passage
6.1.4.1 Energized Auxiliary Power Tests
"Prior to the commissioning of an automatic transfer switch, it must be installed in its final location and the upstream breakers on both of the incoming power sources must be kept open."
FIST 4-7, section 6.1.4.1, page 28, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-6, PDF page 144, printed 13-1, the ellipsis drops the sentence restating the IEEE 18 kilovar limit (29 November 1996).
Read the reference passage
13-6. Power capacitor inspection schedule
"The initial inspection should be made within 24 hours after energizing a new capacitor installation. This inspection should be made at a time of maximum circuit voltage, usually during the first period of light load on the circuit. In addition to visual observations, this inspection should include voltage and current readings to ensure that voltages and currents do not exceed capacitor rating limits. [...] Routine maintenance and inspection should be accomplished at least four times per year."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-6, PDF page 144, printed 13-1, the ellipsis drops the sentence restating the IEEE 18 kilovar limit, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-11, PDF page 145, printed 13-2, the sentences before it (fuse ratings of 165 to 250 percent and the tank-rupture curve) are left to the summary (29 November 1996).
Read the reference passage
13-11. Fuses for power capacitors
"The blowing of a properly-rated fuse may indicate a capacitor fault, as well as a circuit overcurrent operating condition. When inspection reveals blown fuses, do not replace such fuses until a check determines that the capacitor unit is still serviceable. When fuses are replaced, be sure they are of proper voltage and current ratings and in compliance with the capacitor manufacturer's recommendations."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-11, PDF page 145, printed 13-2, the sentences before it (fuse ratings of 165 to 250 percent and the tank-rupture curve) are left to the summary, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- Stated independently by TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-5, PDF page 144, printed 13-1 (29 November 1996).
Read the reference passage
13-5. Ensuring safe capacitor deenergizing
"Capacitors retain a charge after they are deenergized. After capacitors are deenergized allow at least 5 minutes for discharge and then short the capacitor terminals to ground and to each other. These grounding provisions should remain until work on the installation is completed. Although most power capacitors have a discharge resistor installed to automatically discharge them after they are disconnected from the circuit, it is not advisable to depend entirely on such resistors for safety."
TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082, section 13-5, PDF page 144, printed 13-1, 29 November 1996. Agency copy of TM 5-684 / NAVFAC MO-200 / AFJMAN 32-1082
The current standard governs; this passage is a public-domain description of the practice dated 29 November 1996.
- FIST 4-7, section 6.1.30, page 97 (August 2023).
Read the reference passage
6.1.30 Generator Neutral Cubicle
"The next step is to check the grounding resistor, which includes verifying the grounding resistor nameplate information and confirming that the grounding resistor is clean for further testing."
FIST 4-7, section 6.1.30, page 97, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- FIST 4-7, section 6.1.1.1, page 22 (August 2023).
Read the reference passage
6.1.1.1 Nameplate Data Verification
"The identification of the nameplate data for the equipment to be commissioned is recorded and compared to the data available in the latest documents and drawings."
FIST 4-7, section 6.1.1.1, page 22, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- FIST 4-7, section 6.1.25.1, page 70 (August 2023).
Read the reference passage
6.1.25.1 Excitation Transformer
"Inspect secondary CT circuits to ensure no open circuits exist in these circuits to prevent catastrophic damage to the CTs upon energization. Also, inspect CT circuits ensuring all CT shorting screws have been removed once the CT circuits look correct."
FIST 4-7, section 6.1.25.1, page 70, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
- FIST 4-7, section 8.4.12, page 230 (August 2023).
Read the reference passage
8.4.12 Power Transformers
"Current Transformer secondary circuits are verified in the correct position with the appropriate single point ground or shorting method. It is recommended that all shorting screws be removed and shorting jumpers used for spare current transformer circuits. This will prevent the possibility of shorting screws backing out due to vibrations in the transformer."
FIST 4-7, section 8.4.12, page 230, August 2023. Agency copy of FIST 4-7
The current standard governs; this passage is a public-domain description of the practice dated August 2023.
Obtaining the documents
- ANSI C12.1-2026: available from the publisher
- ANSI/NETA ATS-2025: available from the publisher
- ANSI/NETA ECS-2024: available from the publisher
- ANSI/NETA MTS-2023: available from the publisher
- IEEE 946-2020: available from the publisher
- IEEE C57.13-2016: available from the publisher
- IEEE C57.18.10-2021: available from the publisher
Changelog (40 entries)
| Date | Revision | Change |
|---|---|---|
| 2026-11-02 | created (tests.visual-and-mechanical-inspection.equipment.arrester-mv-hv.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.ats-transfer.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.ats-transfer.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.automation.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.automation.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.busway.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.busway.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.cable.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.cable.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.capacitor.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.capacitor.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.drive.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.drive.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.evcharging.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.evcharging.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.network-protector.acceptance) | |
| 2026-10-13 | edited (tests.visual-and-mechanical-inspection.equipment.network-protector.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.network-protector.maintenance) | |
| 2026-10-13 | edited (tests.visual-and-mechanical-inspection.equipment.network-protector.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.partialdischarge.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.reactor.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.reactor.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.resistor.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.resistor.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.sectionalizer.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.sectionalizer.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.solar.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.surge.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.surge.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.ups.acceptance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.equipment.ups.maintenance) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.governed-by.ansi-c12-1) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.governed-by.ansi-neta-ats) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.governed-by.ansi-neta-ecs) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.governed-by.ansi-neta-mts) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.governed-by.faa-ac-150-5345-10h) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.governed-by.ieee-946) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.governed-by.ieee-c57-18-10) | |
| 2026-10-13 | created (tests.visual-and-mechanical-inspection.title) |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Visual and Mechanical Inspection." Electrical Testing Reference. 2026-11-02. https://www.electricaltestingreference.com/tests/visual-and-mechanical-inspection/.
Electrical Testing Reference, Visual and Mechanical Inspection (Nov. 2, 2026), https://www.electricaltestingreference.com/tests/visual-and-mechanical-inspection/.
@misc{etr-tests-visual-and-mechanical-inspection,
title = {Visual and Mechanical Inspection},
howpublished = {\url{https://www.electricaltestingreference.com/tests/visual-and-mechanical-inspection/}},
organization = {Electrical Testing Reference},
publisher = {Electrical Testing Reference},
year = {2026},
note = {last substantive change 2026-11-02}
}{{cite web |title=Visual and Mechanical Inspection |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/tests/visual-and-mechanical-inspection/ |date=2026-11-02 |access-date=}}