Visual and Mechanical Inspection is addressed in IEEE C57.13-2016.

ProvenanceIEEE C57.13-2016 supports data record tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13, which is cited on the entry Visual and Mechanical Inspection.SOURCEIEEE C57.13-2016IEEE C57.13-2016Licensed standard, clause 4.9.1DATA RECORDtests.visual-and-mechanical-inspection.governed-by.ieee-c57-13tests.visual-and-mechani..Verified 2026-10-13ENTRYVisual and Mechanical InspectionVisual and Mechanical In..No revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceIEEE C57.13-2016Licensed standard, clause 4.9.1
Data recordtests.visual-and-mechanical-inspection.governed-by.ieee-c57-13Verified 2026-10-13
EntryVisual and Mechanical InspectionNo revisions
Subject
Visual and Mechanical Inspection (Test methods)
Kind
Method fact
Source
IEEE C57.13-2016, clause 4.9.1, Requirements for Instrument Transformers, IEEE. Publisher page for IEEE C57.13-2016Publisher information page
Also stated in
  • FIST 4-7, section 6.1.25.1, page 70 (August 2023).
    Read the reference passage

    6.1.25.1 Excitation Transformer

    "Inspect secondary CT circuits to ensure no open circuits exist in these circuits to prevent catastrophic damage to the CTs upon energization. Also, inspect CT circuits ensuring all CT shorting screws have been removed once the CT circuits look correct."

    FIST 4-7, section 6.1.25.1, page 70, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 8.4.12, page 230 (August 2023).
    Read the reference passage

    8.4.12 Power Transformers

    "Current Transformer secondary circuits are verified in the correct position with the appropriate single point ground or shorting method. It is recommended that all shorting screws be removed and shorting jumpers used for spare current transformer circuits. This will prevent the possibility of shorting screws backing out due to vibrations in the transformer."

    FIST 4-7, section 8.4.12, page 230, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-13created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/data/tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13/.
Electrical Testing Reference, Data record tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13 (Oct. 13, 2026), https://www.electricaltestingreference.com/data/tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13/.
@misc{etr-data-tests-visual-and-mechanical-inspection-governed-by-ieee-c57-13,
  title = {Data record tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13},
  howpublished = {\url{https://www.electricaltestingreference.com/data/tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-13}
}
{{cite web |title=Data record tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13 |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/data/tests.visual-and-mechanical-inspection.governed-by.ieee-c57-13/ |date=2026-10-13 |access-date=}}