RTD Circuit Verification

Updated 2026-10-13

RelationshipsRTD Circuit Verification is governed by ANSI/NETA ATS-2025, ANSI/NETA MTS-2023 and applies to no listed equipment.ANSI/NETA ATS-2025 Standard for Acceptance Testing SpecificationsANSI/NETA ATS-2025ANSI/NETA MTS-2023 Standard for Maintenance Testing SpecificationsANSI/NETA MTS-2023RTD Circuit VerificationRTD Circuit Verification
Relationships. Governing standards on the left, equipment classes the test applies to on the right, as recorded for this entry.
Relationships: relationships recorded for this entry.
RelationshipEntry
Governing standardANSI/NETA ATS-2025 (ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications)
Governing standardANSI/NETA MTS-2023 (ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications)

Data records

Sources

  • ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.15.1.B.11. Held as: Purchased single-user copy. Publisher page for ANSI/NETA ATS-2025Publisher information page
  • ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.15.2.B. Held as: Purchased single-user copy. Publisher page for ANSI/NETA MTS-2023Publisher information page
  • Electrical Testing Reference editorial taxonomy, Electrical Testing Reference editorial taxonomy of test methods, 2026-10 edition, Electrical Testing Reference. Held as: Own observation.

Also stated in

  • FIST 4-7, Appendix A, page A-6 (August 2023).
    Read the reference passage

    Appendix A - Example Commissioning Plan - Turbine and Generator

    "After each rotational test, verify that the protection systems and devices (RTD's, switches, etc.) are functioning properly and all alarms are clear. Correct any malfunction prior to further testing."

    FIST 4-7, Appendix A, page A-6, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

Obtaining the documents

Changelog (3 entries)
DateRevisionChange
2026-10-13created (tests.rtd-circuit-verification.governed-by.ansi-neta-ats)
2026-10-13created (tests.rtd-circuit-verification.governed-by.ansi-neta-mts)
2026-10-13created (tests.rtd-circuit-verification.title)

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"RTD Circuit Verification." Electrical Testing Reference. 2026-10-13. https://www.electricaltestingreference.com/tests/rtd-circuit-verification/.
Electrical Testing Reference, RTD Circuit Verification (Oct. 13, 2026), https://www.electricaltestingreference.com/tests/rtd-circuit-verification/.
@misc{etr-tests-rtd-circuit-verification,
  title = {RTD Circuit Verification},
  howpublished = {\url{https://www.electricaltestingreference.com/tests/rtd-circuit-verification/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-13}
}
{{cite web |title=RTD Circuit Verification |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/tests/rtd-circuit-verification/ |date=2026-10-13 |access-date=}}