ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications

Updated 2026-10-13

Edition timelineANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications: 2025 (current)20232024202520262027ANSI/NETA ATS-2025 Standard for Acceptance Testing SpecificationsANSI/NETA ATS-2025ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications2025 (current edition)
Edition timeline. Editions recorded for this standard from the publisher's catalog. The filled dot marks the edition listed as current.
Edition timeline: edition years from the publishers' catalogs; editions without a four-digit year are listed but not plotted.
StandardEditionKindCurrentRecord
ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications2025EditionYesstd.ansi-neta-ats.edition.2025

ANSI/NETA ATS-2025 is the 2025 edition of the acceptance testing standard of the InterNational Electrical Testing Association (NETA). [1] [2] The NETA shop lists it under the title ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications. [3] The standard sets out the field tests and inspections used to judge whether newly installed electrical power equipment and systems are ready to be energized for the first time. [4]

Scope

According to the publisher's product description, the standard addresses field tests and inspections that establish whether electrical power equipment and systems are operational, within applicable tolerances and installed as designed before initial energization. [4] It belongs to a family of NETA standards in which ANSI/NETA MTS-2023 covers maintenance testing of equipment in service and ANSI/NETA ECS-2024 covers electrical commissioning. [5] [6] [7]

Edition history

NETA published its first testing specification document in 1973, a year after the association was founded, and it became an American National Standards developer in 1996. [8] [2] [9]

Status

The NETA standards development page lists the 2025 edition as the current edition of ANSI/NETA ATS. [10]

Related tests

Field tests that the standard addresses include insulation resistance and the polarization index and dielectric absorption test on the insulation side, contact resistance on the current path, insulation power factor and dissipation factor, dielectric withstand, and dissolved gas analysis of transformer liquid. [11] [12] [13] [14] [15] [Insulating Fluid Reference]

Notes

  1. ANSI/NETA ATS-2025. ANSI/NETA ATS-2025 is the 2025 edition of the NETA standard for acceptance testing specifications. Value: 2025. Datum std.ansi-neta-ats.edition.2025
  2. NETA, web page edition. NETA, the InterNational Electrical Testing Association, was founded in 1972. Datum org.neta.founded
  3. ANSI/NETA ATS-2025. The NETA shop lists the title of ANSI/NETA ATS-2025 as ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications. Value: ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications. Datum std.ansi-neta-ats.title
  4. ANSI/NETA ATS-2025. The standard sets out field tests and inspections for judging whether electrical power equipment and systems are suitable for initial energization, so that they are operational, within applicable tolerances and installed to the design. Datum std.ansi-neta-ats.scope
  5. ANSI/NETA MTS-2023. The standard specifies maintenance tests for electrical power equipment and systems so that they operate reliably and safely within industry and manufacturer tolerances. Datum std.ansi-neta-mts.scope
  6. ANSI/NETA MTS-2023. ANSI/NETA MTS-2023 is the 2023 edition of the NETA standard for maintenance testing specifications. Value: 2023. Datum std.ansi-neta-mts.edition.2023
  7. ANSI/NETA ECS-2024. ANSI/NETA ECS-2024 is the 2024 edition of the NETA standard for electrical commissioning specifications. Value: 2024. Datum std.ansi-neta-ecs.edition.2024
  8. NETA, web page edition. NETA published its first testing specification document in 1973. Datum org.neta.first-specification
  9. NETA, web page edition. NETA became an American National Standards developer in 1996. Datum org.neta.ansi-developer
  10. ANSI/NETA ATS-2025. The NETA standards development page lists the 2025 edition as the current edition of ANSI/NETA ATS. Value: current edition. Datum std.ansi-neta-ats.status
  11. ANSI/NETA ATS-2025, clause 7.22.3.B.2. Insulation Resistance is addressed in ANSI/NETA ATS-2025. Datum tests.insulation-resistance.governed-by.ansi-neta-ats(provenance pending)
  12. ANSI/NETA ATS-2025, clause 7.20.3.2.B.2. Polarization Index and Dielectric Absorption is addressed in ANSI/NETA ATS-2025. Datum tests.polarization-index-and-dielectric-absorption.governed-by.ansi-neta-ats(provenance pending)
  13. ANSI/NETA ATS-2025, clause 7.22.3.B.4. Contact Resistance is addressed in ANSI/NETA ATS-2025. Datum tests.contact-resistance.governed-by.ansi-neta-ats(provenance pending)
  14. ANSI/NETA ATS-2025, clause 7.24.1.B.7. Insulation Power Factor Dissipation Factor is addressed in ANSI/NETA ATS-2025. Datum tests.insulation-power-factor-dissipation-factor.governed-by.ansi-neta-ats(provenance pending)
  15. ANSI/NETA ATS-2025, clause 7.24.1.B.11. Dielectric Withstand is addressed in ANSI/NETA ATS-2025. Datum tests.dielectric-withstand.governed-by.ansi-neta-ats(provenance pending)

Data records

  • ANSI/NETA ATS-2025 is the designation of the document titled ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications. Value: ANSI/NETA ATS-2025. Source: ANSI/NETA ATS-2025. Verified 2026-10-13. Record std.ansi-neta-ats.designation
  • ANSI/NETA ATS-2025 is the 2025 edition of the NETA standard for acceptance testing specifications. Value: 2025. Source: ANSI/NETA ATS-2025. Verified 2026-10-13. Record std.ansi-neta-ats.edition.2025
  • The standard sets out field tests and inspections for judging whether electrical power equipment and systems are suitable for initial energization, so that they are operational, within applicable tolerances and installed to the design. Source: ANSI/NETA ATS-2025. Verified 2026-10-13. Record std.ansi-neta-ats.scope
  • The NETA standards development page lists the 2025 edition as the current edition of ANSI/NETA ATS. Value: current edition. Source: ANSI/NETA ATS-2025. Verified 2026-10-13. Record std.ansi-neta-ats.status
  • The NETA shop lists the title of ANSI/NETA ATS-2025 as ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications. Value: ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications. Source: ANSI/NETA ATS-2025. Verified 2026-10-13. Record std.ansi-neta-ats.title

Sources

Also stated in

  • NAVFAC MO-201, section 5.1.1, PDF page 149, printed 5-1 (April 1990).
    Read the reference passage

    5.1.1 Basic Objectives

    "Certain checks are required on electric equipment, prior to placing it in service, to ensure that the insulation is adequate for application of voltage and that the connections have been properly made. After equipment is in service, certain periodic checks are necessary to ensure that the equipment remains in proper operating condition. Instruments and meters are used to perform these and many other important functions."

    NAVFAC MO-201, section 5.1.1, PDF page 149, printed 5-1, April 1990. Agency copy of NAVFAC MO-201

    The current standard governs; this passage is a public-domain description of the practice dated April 1990.

  • FIST 4-7, section 6.1.28, page 84 (August 2023).
    Read the reference passage

    6.1.28 Generator and Large Motor Windings

    "A polarization index test is similar to the insulation resistance test except that current (or resistance) readings are taken at two intervals, normally one and ten minutes after application of the voltage step. [...] A stator winding may fail the PI test if it has absorbed significant moisture, has substantial surface contamination, or major physical damage. Prior to performing ac or dc high-potential acceptance testing, the winding must pass the PI test."

    FIST 4-7, section 6.1.28, page 84, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 6.1.8.1, page 37 (August 2023).
    Read the reference passage

    6.1.8.1 Insulation Resistance and Polarization Index (PI) Testing

    "Insulation resistance and PI testing applies a high, direct-voltage to the test specimen and measures the corresponding current through the insulation system of interest. These tests must be successfully completed prior to performing a high-potential withstand (proof) test, also known as a 'hipot' test. If the test specimen yields poor insulation resistance or unacceptable polarization index results, the problem must be identified and corrected, and the specimen must pass a repeat testing prior to performing final high-potential withstand test."

    FIST 4-7, section 6.1.8.1, page 37, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 6.1.10.1, pages 43 to 44 (August 2023).
    Read the reference passage

    6.1.10.1 Contact Resistance Test

    "When draw-out type circuit breakers are provided, contact resistance measurements should be conducted with the breaker removed from its cubicle fully isolated from energized circuits ideally placed on a sturdy work bench or cart. The breaker should be cycled open and closed a few times to verify the repeatability of contact resistance and to work lubricants in the operating mechanism. Note that contact grease should not be applied to arcing contacts, otherwise arcing contact resistance may increase over time."

    FIST 4-7, section 6.1.10.1, pages 43 to 44, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 6.1.10.2, page 47 (August 2023).
    Read the reference passage

    6.1.10.2 Insulation Test

    "Insulation power factor tests should be the final test prior to energization after all other tests are completed and the switchgear has been thoroughly cleaned to remove all construction dust and debris. Use only fluids or solvents specifically approved by the manufacturer."

    FIST 4-7, section 6.1.10.2, page 47, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 6.1.28, page 87 (August 2023).
    Read the reference passage

    6.1.28 Generator and Large Motor Windings

    "Field windings are typically given ac high-potential tests before they are put into service."

    FIST 4-7, section 6.1.28, page 87, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

  • FIST 4-7, section 6.1.8.2, page 39 (August 2023).
    Read the reference passage

    6.1.8.2 High Potential Withstand Testing

    "High potential (hipot) testing refers to the application of alternating, or direct, high-voltage to a test specimen for a duration of one-minute. The insulation system either passes or fails the test and is therefore categorized as a 'proof' test and does not usually provide diagnostic information. High potential withstand testing will not damage or significantly degrade an insulation system that is free of serious damage or defects."

    FIST 4-7, section 6.1.8.2, page 39, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

Obtaining the documents

Changelog (27 entries)
DateRevisionChange
2026-10-13created (org.neta.ansi-developer)
2026-10-13reviewed (org.neta.ansi-developer)
2026-10-13created (org.neta.first-specification)
2026-10-13reviewed (org.neta.first-specification)
2026-10-13created (org.neta.founded)
2026-10-13reviewed (org.neta.founded)
2026-10-131created
2026-10-13created (std.ansi-neta-ats.edition.2025)
2026-10-13reviewed (std.ansi-neta-ats.edition.2025)
2026-10-13edited (std.ansi-neta-ats.edition.2025)
2026-10-13created (std.ansi-neta-ats.scope)
2026-10-13created (std.ansi-neta-ats.status)
2026-10-13reviewed (std.ansi-neta-ats.status)
2026-10-13created (std.ansi-neta-ats.title)
2026-10-13reviewed (std.ansi-neta-ats.title)
2026-10-13created (std.ansi-neta-ecs.edition.2024)
2026-10-13reviewed (std.ansi-neta-ecs.edition.2024)
2026-10-13edited (std.ansi-neta-ecs.edition.2024)
2026-10-13created (std.ansi-neta-mts.edition.2023)
2026-10-13reviewed (std.ansi-neta-mts.edition.2023)
2026-10-13edited (std.ansi-neta-mts.edition.2023)
2026-10-13created (std.ansi-neta-mts.scope)
2026-10-13created (tests.contact-resistance.governed-by.ansi-neta-ats)
2026-10-13created (tests.dielectric-withstand.governed-by.ansi-neta-ats)
2026-10-13created (tests.insulation-power-factor-dissipation-factor.governed-by.ansi-neta-ats)
2026-10-13created (tests.insulation-resistance.governed-by.ansi-neta-ats)
2026-10-13created (tests.polarization-index-and-dielectric-absorption.governed-by.ansi-neta-ats)

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

Permanent revision URL: https://www.electricaltestingreference.com/standards/ansi-neta-ats/rev/1/. Current version: https://www.electricaltestingreference.com/standards/ansi-neta-ats/.

"ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications." Electrical Testing Reference. Revision 1, 2026-10-13. https://www.electricaltestingreference.com/standards/ansi-neta-ats/rev/1/.
Electrical Testing Reference, ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications (rev. 1, Oct. 13, 2026), https://www.electricaltestingreference.com/standards/ansi-neta-ats/rev/1/.
@misc{etr-standards-ansi-neta-ats-rev1,
  title = {ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications},
  howpublished = {\url{https://www.electricaltestingreference.com/standards/ansi-neta-ats/rev/1/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {Revision 1; last substantive change 2026-10-13}
}
{{cite web |title=ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/standards/ansi-neta-ats/rev/1/ |date=2026-10-13 |access-date= |version=1}}