Insulation Power Factor Dissipation Factor

Updated 2026-10-24

RelationshipsInsulation Power Factor Dissipation Factor is governed by ANSI/NETA ATS-2025, ANSI/NETA MTS-2023 and applies to no listed equipment.ANSI/NETA ATS-2025 Standard for Acceptance Testing SpecificationsANSI/NETA ATS-2025ANSI/NETA MTS-2023 Standard for Maintenance Testing SpecificationsANSI/NETA MTS-2023Insulation Power Factor Dissipation FactorInsulation Power Factor Dissipatio..
Relationships. Governing standards on the left, equipment classes the test applies to on the right, as recorded for this entry.
Relationships: relationships recorded for this entry.
RelationshipEntry
Governing standardANSI/NETA ATS-2025 (ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications)
Governing standardANSI/NETA MTS-2023 (ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications)

Data records

Sources

  • ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.21.B.4; clause 7.20.3.1.B.5; clause 7.24.2.B.9; clause 7.24.1.B.7. Held as: Purchased single-user copy. Publisher page for ANSI/NETA ATS-2025Publisher information page
  • ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.21.B.4; clause 7.20.3.2.B; clause 7.24.2.B.9; clause 7.24.1.B.7. Held as: Purchased single-user copy. Publisher page for ANSI/NETA MTS-2023Publisher information page
  • Electrical Testing Reference editorial taxonomy, Electrical Testing Reference editorial taxonomy of test methods, 2026-10 edition, Electrical Testing Reference. Held as: Own observation.
  • IEEE C57.12.90-2021, Test Code for Liquid-Immersed Distribution, Power and Regulating Transformers, 2021 edition, IEEE. Cited: clause 10.10.1, 10.10.2, 10.10.3; clause 10.10.4, Table 4; clause 10.10; clause Table 4, Notes 2 and 3. Held as: Purchased single-user copy. Publisher page for IEEE C57.12.90-2021Publisher information page

Also stated in

  • FIST 4-7, section 6.1.10.2, page 47 (August 2023).
    Read the reference passage

    6.1.10.2 Insulation Test

    "Insulation power factor tests should be the final test prior to energization after all other tests are completed and the switchgear has been thoroughly cleaned to remove all construction dust and debris. Use only fluids or solvents specifically approved by the manufacturer."

    FIST 4-7, section 6.1.10.2, page 47, August 2023. Agency copy of FIST 4-7

    The current standard governs; this passage is a public-domain description of the practice dated August 2023.

Obtaining the documents

Changelog (19 entries)
DateRevisionChange
2026-10-24created (tests.insulation-power-factor-dissipation-factor.ieeec57-12-90.conditions)
2026-10-24review_status unreviewed -> software_reviewed (tests.insulation-power-factor-dissipation-factor.ieeec57-12-90.conditions)
2026-10-24created (tests.insulation-power-factor-dissipation-factor.ieeec57-12-90.connections)
2026-10-24review_status unreviewed -> software_reviewed (tests.insulation-power-factor-dissipation-factor.ieeec57-12-90.connections)
2026-10-24created (tests.insulation-power-factor-dissipation-factor.ieeec57-12-90.definition)
2026-10-24revised (tests.insulation-power-factor-dissipation-factor.ieeec57-12-90.definition)
2026-10-24review_status unreviewed -> software_reviewed (tests.insulation-power-factor-dissipation-factor.ieeec57-12-90.definition)
2026-10-24created (tests.insulation-power-factor-dissipation-factor.ieeec57-12-90.no-standard-values)
2026-10-24revised (tests.insulation-power-factor-dissipation-factor.ieeec57-12-90.no-standard-values)
2026-10-24review_status unreviewed -> software_reviewed (tests.insulation-power-factor-dissipation-factor.ieeec57-12-90.no-standard-values)
2026-10-13created (tests.insulation-power-factor-dissipation-factor.equipment.busway.acceptance)
2026-10-13created (tests.insulation-power-factor-dissipation-factor.equipment.busway.maintenance)
2026-10-13created (tests.insulation-power-factor-dissipation-factor.equipment.reactor.acceptance)
2026-10-13created (tests.insulation-power-factor-dissipation-factor.equipment.reactor.maintenance)
2026-10-13created (tests.insulation-power-factor-dissipation-factor.equipment.sectionalizer.acceptance)
2026-10-13created (tests.insulation-power-factor-dissipation-factor.equipment.sectionalizer.maintenance)
2026-10-13created (tests.insulation-power-factor-dissipation-factor.governed-by.ansi-neta-ats)
2026-10-13created (tests.insulation-power-factor-dissipation-factor.governed-by.ansi-neta-mts)
2026-10-13created (tests.insulation-power-factor-dissipation-factor.title)

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Insulation Power Factor Dissipation Factor." Electrical Testing Reference. 2026-10-24. https://www.electricaltestingreference.com/tests/insulation-power-factor-dissipation-factor/.
Electrical Testing Reference, Insulation Power Factor Dissipation Factor (Oct. 24, 2026), https://www.electricaltestingreference.com/tests/insulation-power-factor-dissipation-factor/.
@misc{etr-tests-insulation-power-factor-dissipation-factor,
  title = {Insulation Power Factor Dissipation Factor},
  howpublished = {\url{https://www.electricaltestingreference.com/tests/insulation-power-factor-dissipation-factor/}},
  organization = {Electrical Testing Reference},
  publisher = {Electrical Testing Reference},
  year = {2026},
  note = {last substantive change 2026-10-24}
}
{{cite web |title=Insulation Power Factor Dissipation Factor |website=Electrical Testing Reference |publisher=Electrical Testing Reference |url=https://www.electricaltestingreference.com/tests/insulation-power-factor-dissipation-factor/ |date=2026-10-24 |access-date=}}